title>SY 4031-1993 Petroleum Construction Engineering Quality Inspection and Assessment Standard Automation Instrument Installation Engineering - SY 4031-1993 - Chinese standardNet - bzxz.net
Home > SY > SY 4031-1993 Petroleum Construction Engineering Quality Inspection and Assessment Standard Automation Instrument Installation Engineering
SY 4031-1993 Petroleum Construction Engineering Quality Inspection and Assessment Standard Automation Instrument Installation Engineering

Basic Information

Standard ID: SY 4031-1993

Standard Name: Petroleum Construction Engineering Quality Inspection and Assessment Standard Automation Instrument Installation Engineering

Chinese Name: 石油建设工程质量检验评定标准 自动化仪表安装工程

Standard category:Oil and gas industry standards (SY)

state:in force

Date of Release1993-09-09

Date of Implementation:1994-03-01

standard classification number

Standard ICS number:75.010

Standard Classification Number:>>>>P7 Engineering Construction>>Industrial Equipment Installation Engineering>>P91 Electrical Equipment Installation Engineering

associated standards

alternative situation:SYJn4031-88

Publication information

publishing house:Petroleum Industry Press

other information

Publishing department:China National Petroleum Corporation

Introduction to standards:

This standard applies to the inspection and evaluation of the quality of automatic instrument installation engineering in the ground construction of petroleum engineering. This standard does not apply to computer and other intelligent instrument installation engineering. SY 4031-1993 Petroleum Construction Engineering Quality Inspection and Evaluation Standard Automatic Instrument Installation Engineering SY4031-1993 Standard Download Decompression Password: www.bzxz.net

Some standard content:

Standard for Inspection and Evaluation Quality of Petroleum Construction EngineeringAutometic Instrument Installation Engineering
sY 403t-—93
Editor: China National Petroleum Corporation Infrastructure Engineering BureauApproval department: China Petroleum Run Natural Gas CorporationImplementation date: March 1, 1994
Petroleum Industry Press
1993·Beijing
Project blue times
Instrument panel (box, operating table) installation projectTemperature instrument installation project
Pressure instrument installation project
Throttling device installation project
Flow and differential pressure instrument installation project
Level instrument installation project
Analytical instrument installation project
Control valve, actuator and solenoid valve installation projectInstallation project of instrument power supply equipment and gas and liquid supply systemInstallation project of electrical wiring for instrument
Explosion-proof and grounding project*
Instrument pipeline laying project
Degreasing and protection project
Instrument calibration project for signal, interlock and protection device installation project
Appendix A
Appendix B
Appendix C
Quality assurance data inspection equipment for automation instrument installation project
Explanation of terms used in this standard
Additional notes
(42)
(52)
(58)
(73)
(93)
Document of China National Petroleum Corporation
(93) CNPC Technical No. 598
Notice on the approval and release of 27 oil and gas industry standards including "Regulations for the Preparation of Petroleum Surface Engineering Design Documents"
To all relevant units and relevant petroleum professional standards and technical committees: The draft of 27 standards including "Regulations for the Preparation of Petroleum Surface Engineering Design Documents" has been reviewed and approved and is now approved as oil weather industry standards. The numbers and names of various standards are as follows: SY 0009-93 SY 0055—93 SY 0072--93 SY0073—93 SY 0074---93 SY/T 0076--93 SY/T 0077-93 SY/T0523—93 SY 4024—93 SYJ 9--83)
Measurement specification for long-distance oil and gas pipelines
(replace SYJ55-83)
Test method for high-temperature cathodic ionization of pipeline anticorrosion layerStandard for test method for pipeline anticorrosion layer patch materialStandard for test method for insulation and sealing of pipeline corrosion layer patch
Design specification for natural gas dehydration
Design specification for natural gas condensate recovery
Oilfield water treatment filter
General standard for quality inspection and assessment of petroleum construction projects (replace SYJn4024--88)
SY 4026--93
SY 4026--93
SY 4027-93
SY 4028--93
14SY4029-93
SY 4030.1-93
SY 4030.293
SY 403193
SY 4033—93
SY 403493
SY4035-—93
SY 4037-93
Petroleum construction project quality inspection and assessment standard construction project (replace SYJn402588)
Petroleum construction project quality inspection and assessment standard project (replace SYJn4026--88)
Petroleum construction project quality inspection and assessment standard promotion station meat
Steel process pipeline installation project (replace SYJn4027—88)
Petroleum construction project quality inspection and assessment standard installation project
(Replace SYJn4028-88)
Petroleum construction project quality inspection and assessment standard Pipeline line engineering
(Replace SYJz4029--88)
Petroleum construction project quality inspection and assessment standard Electrical engineering (overhead power line engineering)
(Replace SYJn·4030--88)
Petroleum construction project quality inspection and assessment standard Engineering (Electrical installation engineering)
(Replace SYJm 4030—88)
Standardization of quality inspection and assessment of petroleum construction projects Instrument installation engineering
(Replaces SYJh4031——88)
Standardization of quality inspection and assessment of petroleum construction projects Road engineering (Replaces SYJn4033--88)
Standardization of quality inspection and assessment of petroleum construction projects Bridge engineering (Replaces SYJn4034--88)
Standardization of quality inspection and assessment of petroleum construction projects Ventilation, water supply and drainage installation engineering
(Replaces SYJn4035—88)
Cai Nuan,
Standardization of quality inspection and assessment of petroleum construction projects Refining 22
SY 4038-93
SY4053—93
SY/T 4068--93
SY/T4069-—93
SY.4070--93
SY/T 4071--93
Factory construction project
(in place of SYJ4037-89)
Standard for quality inspection and assessment of petroleum construction projectsConstruction projects
(in place of SY.4038-92)
Standard for quality inspection and assessment of petroleum construction projectsGathering and transportation pipeline projects
(in place of SY4053-92)
Standard for quality inspection and assessment of petroleum construction projectsInsulated steel pipe production
Standard for quality inspection and assessment of petroleum construction projectsSteel container production
Specifications for construction and acceptance of petroleum and natural gas pipeline crossing projectsPort
Pipeline downward welding process specification
: The above standards shall come into force on March 1, 1994. China National Petroleum Corporation
September 9, 1993
1 General
1.0.1 This standard applies to the inspection and evaluation of the quality of the automatic instrument installation project in the ground construction of Shizhou Asia Engineering.
This standard does not apply to the installation of computers and other intelligent instruments. 1,0.2 The names of the sub-items and sub-divisions (units) of the automatic instrument installation project shall comply with the provisions of Table 1.0.2.
Names of sub-items and sub-divisions (units) of automation equipment installation engineering 1.0.2 Names of sub-divisions (units) of engineering
Automation instrument installation engineering
Names of sub-items
Instrument panel (operating table) installation engineering, temperature instrument installation engineering, pressure instrument installation engineering, throttling device installation engineering, flow and differential pressure instrument installation engineering, physical instrument installation engineering, analytical instrument installation engineering, regulating valve, thermal mechanism and solenoid valve installation engineering, instrument power supply equipment and gas and liquid supply system installation engineering, instrument electrical circuit design and main program: media protection and grounding engineering, instrument pipeline design engineering, release and protection engineering, signal interlocking and protection device installation engineering, instrument calibration engineering, etc.
1.0.3 While implementing this standard, the provisions of SY4024-93 "Standards for Quality Inspection and Assessment of Petroleum Construction Engineering" shall also be observed. 1.0.4 The main indicators and requirements of this standard are proposed in accordance with GBJ93-86 "Industrial Automation Instrument Engineering Construction and Inspection Specifications". 1.0.5 The quality assurance materials of this standard shall comply with the requirements of Appendix A of the standard. 1.0.6 The inspection instruments used in the inspection according to this standard shall comply with the provisions of Appendix B of this standard.
2 Instrument panel (box, operating table) installation project 2.1 Guarantee items
2.1.1 The specifications, models and materials of the foundation steel must meet the design requirements. Inspection method "Inspect according to design.
212 The position number, specifications and models of the instrument panel (box, operating table) and its ancillary equipment must meet the design requirements.
Inspection method Inspect according to design and check the product certificate. 2.2
Basic items
2.2 The quality requirements for the installation of the instrument panel (operating table) steel base and its inspection method shall comply with Table 2.2.1. Quality requirements and installation methods of quick-fee tray (classroom table) type courtyard seat. Specified score
Dimensions and
Quality requirements
Inspection method
Specified score
Dashboard (operating table)
Measure
The position shall meet
design requirements
Measure
Measure
According to the design
Check
The upper surface of the base
is level, and the ground is firmly fixed
Note: The items in Table 2.21 are main items, and the rest are the same. Observe; the grounding shall meet
design requirements or relevant regulations
Check the recordswwW.bzxz.Net
, and check the quality. ·The steel bases of instrument panels (operating tables) installed in a row must be fully inspected and checked as a whole: The steel bases of instrument panels (operating tables) installed separately must be inspected. 30% of the steel base shall be inspected randomly, and there shall be no less than one.
2.2.2 The quality requirements and inspection methods of the installation of a separate instrument panel (operating table) and the specified score shall comply with the provisions of Table 2.2.2.
Quality requirements
Inspection methods
Specified score!
Fixed firmly
Observation: Use a
wrench to test tighten
The quality requirements and inspection methods and specified score of the installation of a single instrument panel (operating table) and the specified score
grounding shall comply with the design requirements or have
American specifications
Check records
The screw control has a protection
Table 2.2.2
Reduction grip complies with
Design requirements
Inspection quantity
Cat inspection 30%, no less than one ear.
Sealing special
Design requirements
(operating table) installation quality requirements and inspection methods, and the specified score of the pet tray in a row shall comply with the provisions of Table 2.2.3.
Only the panel in a row (operating table) installation quality requirements and inspection methods, and the specified score
Quality requirements are firmly fixed
Inspection method
Specified score
Observation: Use a
wrench to test tighten
Check that the digital base
grounding meets the design requirements or has
relevant specifications
Connection records
With anti-rust layer
All inspections are carried out, and overall inspections are carried out.
Reduction in grip meets
Sealing and joint
Design requirements
Quality requirements for installation of bag boxes (pole), insulation boxes and protection boxes, and their inspection methods and specified scores
When installing centrally
Quality requirements
Arrange neatly
Inspection methods
Specified scores
Observe;
Use a wrench
Grounding meets the design requirements or has
Related regulations and provisions
Check records
Vibration damping and sealing characteristics
Meet design requirements
Design requirements
Fixed brackets meet
Design requirements or have
Related regulations and provisions
2.2.4 Instrument box (protection box) Quality requirements for installation and inspection methods for protection box, the specified score should comply with the provisions of Article 4 of the instrument service. The instrument box can be inspected closely for 2 times, and no less than two times should be learned.
2.3 Allowable deviation items
2.3. The quality indicators, inspection quantity, inspection methods and their specified scores of the installation allowable deviation items of instrument panels (boxes, operating tables) shall comply with the provisions of Table 2.3.1. This table contains the quality indicators, inspection quantity, inspection methods and their specified scores of the installation allowable deviation items of instrument panels (boxes, operating tables).
Instrument installation
Steel base
Single instrument
Arranged instrument
Total length greater than 5m
Total length greater than 5m
Verticality (per meter)
Horizontal inclination (per meter)
Verticality meter
Both panels (sets)
Head high burial
Love project according to the high base
Pre-connection more than two places)
Two plates
(check) Joints
Space connection (more
More push sugar reduction
Check the number
Instrument installation in a row
Operation answer) Steel
Base full inspection: Separate
Instrument installation
(Operation joint) Steel
Base sampling 30%,
Less than
Sampling 30%, and should not be less than
All inspection
Inspection method||tt| |Pull a line and use a ruler to measure the largest deviation. Use a level or level gauge. Use a pendant and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line gauge to measure the top line of the plate. Use a level gauge to measure or use a level gauge. Use a line gauge to measure from the top, middle and bottom of the plate. Use a line gauge to measure from the top, middle and bottom of the plate. Use a line gauge to measure. Use a ruler to measure the top line.
Instrument registration
Verticality
Height ≤1.2m
Height>1.2m
More than 5
Number of inspections
Sampling 20%, and no
Continued Table 2.3.1
Inspection method
Use hanging line and ruler to measure the plate
Use hanging line and ruler to measure the plate
Use level to measure the box items
Use level and wire to measure
Instrument panel (box, operating table) installation sub-item quality inspection and evaluation form
The format of the instrument panel (box, operating table) installation sub-item quality inspection and evaluation form shall comply with the provisions of Table 2.4.1.
Adjusting life and medical treatment, etc.
Type bottom safety
Life safety
Single instrument panel
Daily payment
, guard
safety box insurance box packing3.
Quality requirements and inspection methods and specified scores for installation of only trays (operating tables) in a row
Quality requirements Firmly fixed
Inspection methods
Specified scores
Observation: Tighten with a wrench
Check that the digital base
grounding meets the design requirements or relevant specifications
Connection records
With anti-rust layer
All inspections are carried out, and overall inspection is carried out.
Reduction in grip meets
Sealing and joint
Design requirements
Quality requirements for installation of bag boxes (pole), insulation boxes and protection boxes, and their inspection methods and specified scores
When installing centrally
Quality requirements
Arrange neatly
Inspection methods
Specified scores
Observe;
Use a wrench
Grounding meets the design requirements or has
Related regulations and provisions
Check records
Vibration damping and sealing characteristics
Meet design requirements
Design requirements
Fixed brackets meet
Design requirements or have
Related regulations and provisions
2.2.4 Instrument box (protection box) Quality requirements for installation and inspection methods for protection box, the specified score should comply with the provisions of Article 4 of the instrument service. The instrument box can be inspected closely for 2 times, and no less than two times should be learned.
2.3 Allowable deviation items
2.3. The quality indicators, inspection quantity, inspection methods and their specified scores of the installation allowable deviation items of instrument panels (boxes, operating tables) shall comply with the provisions of Table 2.3.1. This table contains the quality indicators, inspection quantity, inspection methods and their specified scores of the installation allowable deviation items of instrument panels (boxes, operating tables).
Instrument installation
Steel base
Single instrument
Arranged instrument
Total length greater than 5m
Total length greater than 5m
Verticality (per meter)
Horizontal inclination (per meter)
Verticality meter
Both panels (sets)
Head high burial
Love project according to the high base
Pre-connection more than two places)
Two plates
(check) Joints
Space connection (more
More push sugar reduction
Check the number
Instrument installation in a row
Operation answer) Steel
Base full inspection: Separate
Instrument installation
(Operation joint) Steel
Base sampling 30%,
Less than
Sampling 30%, and should not be less than
All inspection
Inspection method||tt| |Pull a line and use a ruler to measure the largest deviation. Use a level or level gauge. Use a pendant and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line gauge to measure the top line of the plate. Use a level gauge to measure or use a level gauge. Use a line gauge to measure from the top, middle and bottom of the plate. Use a line gauge to measure from the top, middle and bottom of the plate. Use a line gauge to measure. Use a ruler to measure the top line.
Instrument registration
Verticality
Height ≤1.2m
Height>1.2m
More than 5
Number of inspections
Sampling 20%, and no
Continued Table 2.3.1
Inspection method
Use hanging line and ruler to measure the plate
Use hanging line and ruler to measure the plate
Use level to measure the box items
Use level and wire to measure
Instrument panel (box, operating table) installation sub-item quality inspection and evaluation form
The format of the instrument panel (box, operating table) installation sub-item quality inspection and evaluation form shall comply with the provisions of Table 2.4.1.
Adjusting life and medical treatment, etc.
Type bottom safety
Life safety
Single instrument panel
Daily payment
, guard
safety box insurance box packing3.
Quality requirements and inspection methods and specified scores for installation of only trays (operating tables) in a row
Quality requirements Firmly fixed
Inspection methods
Specified scores
Observation: Tighten with a wrench
Check that the digital base
grounding meets the design requirements or relevant specifications
Connection records
With anti-rust layer
All inspections are carried out, and overall inspection is carried out.
Reduction in grip meets
Sealing and joint
Design requirements
Quality requirements for installation of bag boxes (pole), insulation boxes and protection boxes, and their inspection methods and specified scores
When installing centrally
Quality requirements
Arrange neatly
Inspection methods
Specified scores
Observe;
Use a wrench
Grounding meets the design requirements or has
Related regulations and provisions
Check records
Vibration damping and sealing characteristics
Meet design requirements
Design requirements
Fixed brackets meet
Design requirements or have
Related regulations and provisions
2.2.4 Instrument box (protection box) Quality requirements for installation and inspection methods for protection box, the specified score should comply with the provisions of Article 4 of the instrument service. The instrument box can be inspected closely for 2 times, and no less than two times should be learned.
2.3 Allowable deviation items
2.3. The quality indicators, inspection quantity, inspection methods and their specified scores of the installation allowable deviation items of instrument panels (boxes, operating tables) shall comply with the provisions of Table 2.3.1. This table contains the quality indicators, inspection quantity, inspection methods and their specified scores of the installation allowable deviation items of instrument panels (boxes, operating tables).
Instrument installation
Steel base
Single instrument
Arranged instrument
Total length greater than 5m
Total length greater than 5m
Verticality (per meter)
Horizontal inclination (per meter)
Verticality meter
Both panels (sets)
Head high burial
Love project according to the high base
Pre-connection more than two places)
Two plates
(check) Joints
Space connection (more
More push sugar reduction
Check the number
Instrument installation in a row
Operation answer) Steel
Base full inspection: Separate
Instrument installation
(Operation joint) Steel
Base sampling 30%,
Less than
Sampling 30%, and should not be less than
All inspection
Inspection method||tt| |Pull a line and use a ruler to measure the largest deviation. Use a level or level gauge. Use a pendant and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line and a ruler to measure the top line of the plate. Use a ruler to measure or use a level gauge. Use a line gauge to measure the top line of the plate. Use a level gauge to measure or use a level gauge. Use a line gauge to measure from the top, middle and bottom of the plate. Use a line gauge to measure from the top, middle and bottom of the plate. Use a line gauge to measure. Use a ruler to measure the top line.
Instrument registration
Verticality
Height ≤1.2m
Height>1.2m
More than 5
Number of inspections
Sampling 20%, and no
Continued Table 2.3.1
Inspection method
Use hanging line and ruler to measure the plate
Use hanging line and ruler to measure the plate
Use level to measure the box items
Use level and wire to measure
Instrument panel (box, operating table) installation sub-item quality inspection and evaluation form
The format of the instrument panel (box, operating table) installation sub-item quality inspection and evaluation form shall comply with the provisions of Table 2.4.1.
Adjusting life and medical treatment, etc.
Type bottom safety
Life safety
Single instrument panel
Daily payment
, guard
safety box insurance box packing
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.