SY/T 0441-2001 Technical specification for the manufacture and installation of oilfield steam injection boilers
Some standard content:
HC$75.180.18:27.060
No.:9592—1001
Standard of the Petroleum and Natural Gas Industry of the People's Republic of China P
SY/F 0441-2UU1
Technical specification for manufacture and installation of wet steam generators used in oil - fiekds20t-09—24 Issued
2002-1-01 Implementation
Released by the Economic and Trade Commission of the People's Republic of China
Standard of the Petroleum and Natural Gas Industry of the People's Republic of China Technical specification for manufacture and installation of wet steam generators used in oil -fields51441-2001
Main unit: China National Petroleum Corporation No. 8 Construction Company Approving department: National Economic and Trade Commission Foreword
This specification is formulated in accordance with the requirements of China National Petroleum Corporation's Document No. 31 of Quality and Safety Construction, and is jointly formulated by the State-owned Oil and Gas Construction Company and the China Shishan Natural Gas Group Corporation Engineering and Technology Research Institute on the installation and acceptance specification SY/T4041-95 for oilfield special wet steam generators. This time, the original name was changed to "Shantou Steam Injection Boiler Manufacturing, Installation and Acceptance Technical Specifications". In the revision, the company summarized the practical experience of boiler manufacturing, installation and acceptance of our company, and widely solicited the opinions of various oilfield engineering and technical personnel on on-site construction and installation, referring to the relevant national standards, current specifications and relevant domestic and foreign information. On the basis of the original specification, some new contents were added: Chapter 2 "Models and parameters of oilfield steam injection boilers", Chapter 3 "Materials, auxiliary machines and accessories", Chapter 4 "Manufacturing", Chapter 5 "Assembly", Chapter 6 "Pressure test", Chapter 7 "Oil injection, packaging, marking, transportation", Chapter 10 "Acceptance", Appendix 4 "Ultrasonic detection method", in addition to the original specification Chapter 5 "Information" and Appendix A, this specification is divided into one and two appendices. The main contents are: general provisions, models and parameters of oilfield steam injection boilers, materials, transmission machines and accessories, manufacturing, assembly, pressure test, oil injection, packaging, marking, transportation, installation, weekly test, operation and acceptance. This specification is interpreted by China National Petroleum and Natural Gas Construction Company No. 1, and the drafting unit of this specification is China National Petroleum and Natural Gas Construction Company No. 8. The main drafters of this specification are Hou Zengrang, Zhang Nianke, Su Wen, Wang Yantun, Wang Du and Du Yingda. 2. Models and specifications of oilfield steam injection boilers 2.1 Parameter series of oilfield steam injection boilers 2.2 Regulations on parts of oilfield steam injection boilers 2.3 Ordering requirements for oilfield steam injection boilers 3. Materials, auxiliary equipment and accessories 3.1 Inspection and consistency of materials 3.2 Inspection and collection of auxiliary equipment and accessories 4.1 Furnace finishing 4.2 Compliance 4.3 System general line 4 .5 No-extraction test
4.6 Mechanical properties test of the purchased products
4.1 Heat treatment
4.8 Preservation of refractory materials
5 Number of groups
5.1 Overall assembly
5.2 Automation only. Clothing and power equipment assembly 6 Pressure test...
Painting, packaging, labeling, transportation
7.1 Oil rate, frost
7.2 Labeling, transportation
8 Installation
Each.1 Fish feed
8.2 Inspection and acceptance of receipt
8.3 Basics
8.4 Placement and connection
8.5 Line reporting
8. Line sweeping and station inspection
8.7 Electrical circuit connection and component installation 8.8 Automatic control system connection and collection installation 8.y Installation
4 Test
9.1 Automatic control system debugging
|.2 Preparation for ignition
9.3 Ignition
9.4 Training test|| tt||10 Trial operation
11 Acceptance
Appendix A Ultrasonic wave deep wound method
Appendix B Oil field steam injection boiler operation record form format standard wording and terminology
Appendix Technical specification for the manufacture and installation of oil field steam injection boilers Article description 27
1 General
1.0.1 In order to ensure the safe and stable operation of oil field steam injection boilers, this specification is specially formulated. 1.0.2 This specification is applicable to the manufacture, installation and acceptance of oil field steam injection boilers with a rated steam pressure of no more than 21MPa and a rated evaporation capacity of no more than 22.5t/h. The manufacture, installation and acceptance of oil field steam boilers can refer to the standard. 1..3 Welders who weld transformer components of oilfield steam injection furnaces shall take the examination according to the "Test Rules for Boiler Pressure Vessel Welders", obtain the qualification certificate and engage in corresponding welding work within the validity period.
1.0.4 Non-destructive testing personnel shall be assessed according to the "Qualification Examination Rules for Boiler Pressure Vessel Non-destructive Testing Personnel", obtain the qualification certificate, and can undertake corresponding technical level and type of non-destructive testing work. 1.05 The manufacturing and installation units of oilfield steam injection furnaces must have the corresponding qualification certificates. |tt||1.0.6 Safety technology, environmental protection, fire prevention, etc. shall be implemented in accordance with the provisions of the current relevant laws and regulations.
1.0. In addition to complying with the design drawings and this specification, the manufacture and installation of oilfield steam injection furnaces shall also comply with the relevant national mandatory standards and specifications. The models and numbers of oilfield steam injection boilers
2.1 Oilfield steam injection boiler series
The parameters of oilfield steam injection boilers can be selected according to Table 2.1.1. 2.1.1
2.1.1 Maintenance cumulative pressure (Pa) Leading fixed quantity Regular steam information station [t:] Note: All boilers should have a good steam dryness of 0%, indicating that the domestic current! ! 2.2 Oilfield steam injection boiler model regulations 2.2.1, oil field steam injection boiler model should be selected according to the following regulations, the material code is in accordance with the provisions of Table 2.2.1, F2G-XXX/XXX-X ×
Design consultation
Combustion category
Specific steam pressure (P)
Specific evaporation capacity (t/b)
Product name
Fuel type
Table 2.2.1 Fuel type code
Power gas in fuelWww.bzxZ.net
Note: 1. Determine the steam pressure in Arabic numerals and use the return value to calculate the minimum decimal place||t 2. The product names are represented by the abbreviations written in Sichuan. This designation is represented by the alphabetical abbreviations. The basic model can be omitted. 1.2.3, ..., represents the modified model, which cannot be omitted. For example, YZ-23.5. 2D represents the evaporation capacity of the vehicle per hour 22.5t rated steam pressure 7.2MPm, suitable for oil and gas dual-fuel, 2.3 Oilfield steam injection boiler ordering requirements
2.3.1 The purchaser should provide the supplier with equipment installation information Ground conditions, transportation restrictions, reverse connection and other special requirements: The purchaser can provide the supplier with the following information when placing an order: 1) Sectional equipment:
Ambient temperature (chemical: tower height
Precipitation (mm/a):
Low. Design requirements
Degree: Lowest
Ground condensation zone:
2) Atmospheric surface conditions, such as bowl chemistry room, sand dust, classification, etc.: 2 lists abnormal zones Transportation restrictions, such as tunnels, bridges or thin bridges, restricted sections of roads, etc.
3 Requirements for equipment connection. If special design is required, its purpose, size and position shall be specified.
2.3.2 The buyer shall provide the supplier with the fuel oil and gas: water analysis report, 1. The fuel characteristics shall comply with the requirements of the steam boiler. 2. The feed water quality shall comply with the provisions of the water quality standard for thermal power generation units and steam power equipment E/T12145. Without reliable water treatment facilities, it shall not be put into operation. 3. The use of the boiler shall comply with the laws and regulations stipulated by the state. The operating personnel shall receive the national assessment and obtain the driver qualification certificate, and strictly follow the operating procedures.
The supplier shall provide the buyer with information such as the equipment structure, the product shall not change the constants such as 2.3.3
.
3 Materials, auxiliary machines and accessories
3.1 Inspection and acceptance of materials
3.1.1 The materials used for the pressure components of the turbine shall comply with the provisions of "Regulations on Safety Technical Supervision of Steam Boilers" (issued by the Ministry of Labor in December 1996), ensure the quality of materials, and provide quality certification cards. 3.1.2 The metal materials used for pressure components include steel plates, steel pipes, plated parts, welding materials, etc. The factory shall implement the provisions of "Inspection of Boiler Original Sealing Materials at the Factory" (JB/T3375). If they are not inspected or fail the inspection, they shall not be used. 3.1.3 The metal materials used to protect the pressure components shall comply with the provisions of Table 3.1.3-13.1.3-4. Table 3.1.3-1 Furnace smoke bottles, use standard 42395-A, 4235-H, Q235-2. Q235-[Standard 4 GB-T 700
(H/T3274
CBT711
GETTLO
GD 713
[. Working pressure
; when not subject to natural gas, the working pressure is not limited. When used for the correct components of the furnace types with the steam pressure exceeding the U.F limit, the components shall not be connected.
Type of specification:
Alloy
Type of preparation
Set
Metal vehicle
15CeMc
Set 3,1.3-2 Boiler adjustment
Standard exhaust
YH (T) S3
1. Make a new radiation modification for the anorectic
convection beam
point general channel
proximate radiation modification. Convection modification bundle
point bone channel
new period, convection problem low rate
light education channel
C235A, Q23S·H
0233-5Q235-D
20, 25
Furnace photo
East belt number
·tt||Tar:
JM/T9026
s:Shly
|The moon chart
Downward pressure
Nature: "Not with the name of the fire forging, T work force is not limited. Tee can be full plate or type four by machine mold 12lan, large and small heads
Surface feeling, that is, after the work of the silver responsibility, Table 3.1.3-Extract furnace cancer parts
Type
[21.5 A, (295
Q25-C: Q235-1
Alloy steel
Standard number
GB-T N30
Applicable to non-standard
3.1.4 Steel pressure components and main load-bearing components and parts that require materials, welder code stamps, heat treatment, non-destructive detection markings, etc. as specified in product drawings and technical specifications shall comply with the requirements of furnace production stamps and standard buckle plant regulations (standard T4W).
3.1.5 When foreign steel is used for full furnace pressure components, the following requirements shall be met: the steel number listed in the foreign furnace steel standard, or the chemical composition, mechanical properties, welding properties and the domestic steel allowed for sawing are similar, and the steel body of the standard steel body is marked with fluorine-effect furnace steel, and it shall also be reported to the relevant departments for approval. 2. The acceptance shall be carried out according to the technical standards and technical parts specified in the contract, and the missing items shall be inspected and supplemented if necessary. The steel can be used after the completion.
3 Before the first use, the welding process shall be evaluated and the forming process test shall be carried out. It can be used only after meeting the technical requirements.
4 The performance data specified in the technical standard or technical case of the material shall be used for the calculation of the strength of the steel.
5 The materials and products not listed in the standard shall be approved by the safety supervision agency of the Ministry of Labor. 3.1.6 The steel and steel substitutes used for the pressure-bearing components of the boiler shall be steel materials with similar chemical composition and mechanical properties.
The material substitutes for the pressure-bearing components of the boiler and the transformer shall meet the requirements of product strength and structure. The technical department (including design and process department) of the material substitute unit shall be consulted.
When using steel materials that are not engraved in national standards or industry standards, the substitute unit shall put forward technical basis and approve it according to the provincial safety supervision agency: 3.1.7 When the materials of the pressure-bearing components of the boiler meet one of the following conditions, in addition to obtaining the consent of the original design unit, they shall also be filed with the municipal approval unit according to the drawings. 1. Use low-strength materials to replace high-strength materials. 2. Use thinner materials to replace thicker materials. 3. The nominal weight of the steel pipe used is different from the nominal weight of the original pipe. 3.1.8 Non-pressure metal materials for oil field steam injection boilers must have a material quality certificate and should be inspected and accepted. Materials that have not been inspected by the inspection department cannot be used for structural engineering.7 When the materials of the boiler pressure components meet one of the following conditions, in addition to obtaining the consent of the original design unit, they should also be filed with the drawing approval unit. 1. Use low-strength materials to replace high-strength materials. 2. Use thinner materials to replace thicker materials. 3. The nominal weight of the steel pipe used is different from the nominal weight of the original pipe. 3.1.8 Non-pressure metal materials of oil field steam injection boilers must have a material quality certificate and should be inspected and accepted. Materials that have not been inspected by the inspection department cannot be used for structural design.7 When the materials of the boiler pressure components meet one of the following conditions, in addition to obtaining the consent of the original design unit, they should also be filed with the drawing approval unit. 1. Use low-strength materials to replace high-strength materials. 2. Use thinner materials to replace thicker materials. 3. The nominal weight of the steel pipe used is different from the nominal weight of the original pipe. 3.1.8 Non-pressure metal materials of oil field steam injection boilers must have a material quality certificate and should be inspected and accepted. Materials that have not been inspected by the inspection department cannot be used for structural design.