title>QB/T 2747-2005 Negative pressure filling machine for liquids without gas - QB/T 2747-2005 - Chinese standardNet - bzxz.net
Home > QB > QB/T 2747-2005 Negative pressure filling machine for liquids without gas
QB/T 2747-2005 Negative pressure filling machine for liquids without gas

Basic Information

Standard ID: QB/T 2747-2005

Standard Name: Negative pressure filling machine for liquids without gas

Chinese Name: 不含气液体负压灌装机

Standard category:Light Industry Standard (QB)

state:in force

Date of Release2005-09-23

Date of Implementation:2006-05-01

standard classification number

Standard ICS number:Food Technology >> 67.260 Food Industry Plants and

Standard Classification Number:Food>>Food Processing Machinery>>X99 Other Food Processing Machinery

associated standards

alternative situation:Replaces QB/T 3684-1999 (ZB Y99031-1990)

Publication information

publishing house:China Light Industry Press

ISBN:155019.2869

Publication date:2006-01-28

other information

drafter:Cao Ji, Zhao Nianbao

Drafting unit:Shandong Anqiu Light Industry Machinery Co., Ltd.

Focal point unit:National Light Industry Machinery Standardization Committee Liquor and Beverage Machinery Subcommittee

Proposing unit:China Light Industry Federation

Publishing department:National Development and Reform Commission of the People's Republic of China

Introduction to standards:

This standard specifies the product classification, requirements, test and testing methods, inspection rules and markings, product instructions, packaging, transportation and storage of negative pressure filling machines for non-gas liquids. This standard applies to single negative pressure filling machines for negative pressure filling of various non-gas glass bottled alcoholic beverages, syrup beverages, milk beverages, fruit juice beverages, high sugar content concentrated beverages, food condiments such as soy sauce and vinegar, pesticide emulsions and other liquids. QB/T 2747-2005 Non-gas liquid negative pressure filling machine QB/T2747-2005 Standard download decompression password: www.bzxz.net

Some standard content:

ICS 67.260
Classification number: 98
Preparation number: 16756-2006
Light Industry Standard of the People's Republic of China
QB/T2747-2005
Replaces QR:T3654-i999
Gas-free liquid negative-pressure filling machine
Gas-free liquid negative-pressure bottle Gilling2005-09-23 Issued
National Development and Reform Commission of the People's Republic of China Implemented on 2006-05-01
This standard is a revision of OB/T3684-1909 Gas-free liquid filter filling machine.3. Compared with QB/T36R4-1990, this standard has seven major changes: For the standard name, it is strictly accepted and clearly defined as gas-free liquid positive discharge filling machine: QR/T 2747-2005
The document was reorganized in June, and the new version was adopted. The relevant quotations were added. According to the provisions of G1.1K, the date and time of the document were distinguished:
, the technical requirements of the left increased the working conditions of the printing slow-energy food secretion position glue material, and the internal requirements of the bottle loss rate index were not more than 0.2%. It was not as high as 1005%. The roll position difference index was not more than 1mm. The size of the product was not less than 8mm. The installation sound grid was not less than 989:||tt| |The energy index of liquid products has been adjusted. For the dangerous goods category, the high sugar and concentrated beverage category has been added. The energy index of frozen food has been increased from 1.4kW-h/t to 1-2.2kW-lvt. The efficiency index of the product has been increased from no less than 5% to 9%; the life span of the product has been increased from 5000h to 100h. The product packaging requirements have been added.
A standard of China Light Industry Association. The National Light Industry Machinery Standardization Technical Committee will participate in the technical evaluation of the standard. Small standard main single person: Zun Ji, Zhao Nianbao: This standard: 1990 2 inches first revised to 2BY99031-1990, 1999 into QBT3684-1999, this is the first revision.
From the date of implementation of this standard, replace the original national light industry 1 industry standard QB/T3684-199y non-gasified liquid pouring machine
1 Scope
non-gasified liquid negative pressure filling machine
Q/T 2747-2005
This standard specifies the classification, requirements, test methods, inspection rules and instructions, product instructions, packaging, transportation, purchase and storage of non-gas negative pressure packaging machines.
This standard is applicable to various non-gas liquid alcoholic beverages, sugar-free beverages, milk products, juices, high-concentrated beverages, sauces and other food preparations, agricultural products and other variants of negative pressure packaging machines (hereinafter referred to as "products"). 2 Normative references
The clauses in the following documents become the clauses of this standard through reference in this standard. For undated referenced documents, all revisions (excluding erroneous contents) or versions thereof are not applicable to this standard. However, the parties shall verify whether the agreement reached by this standard is sufficient. 1 The latest versions of these documents: For all undated referenced documents, the latest versions shall apply to this standard. GB19100 Packaging, Storage and Transportation Pictorial Marking
GB1184—1996 Tolerance of Sequence and Position Cover, Tolerance Value at the End GB/T1804-2000 General Tolerances: Tolerances of Linear and Negative Dimensions GB4544 "Wine Bottles
GB 4RO6.1
Hygiene Standard for Safeguards for Food
GH 5226.: -2002
GB/T6388
GR:T T311
GB0069.1
Machinery safety - Part 1: Use of shipping containers - Packaging and delivery marks
2003 Packaging machinery model - General method
Industry "Product instruction manual"
GB1304119911
Packing container - Wheeled box
GB.T13306 Label
GB/T13384 General technical requirements for product packaging (GR/14253-1993 Light. General technical requirements for machinery GB16798 Food machinery safety and sanitation
BB/T0018-2U Packaging machine - Bottle
TE 7232-1994 Determination of power consumption of packaging machinery - Film - Method B /T8356.11996 Unpackaged technical conditions
QB/T1588.4-1993 Light, machine sugar coated general filling conditions QR/T35G2500L crown bottle self-made wine bottle
3. Product classification
3.1 Product type
Product epidemic prevention and control forms are divided into special type and point practice type. 3.2 Product series
Product standard The number of heads is: 6, 8, 12, 16, 20.24, 30, 32.36, 40, 50. 3.3 Product model
QH/T27472005
33 Small business number shape weaving method technology 73112003 style, 1! Feng model gradually formed in two parts, 1 to change the language disturbance and sub-thick six, the front auxiliary type can be collected in mathematics, the old horse number can be Chinese art The sound of Ningdan is small. 3.3.2 The classification of the number of dynamic shaking equipment is called "and the energy is formed into a configuration" and the "inch is not, the root must be selected from the history of the item F
3.3.3 hit, the meat 1 raises the rate of the number of Bo equipment.
3.3.4 The number of retreat products is replaced by the number of horses, ...
After the design improvement, the submersible head micrometer is a certificate for each "liquid black meter machine of this business". The product model is:
4.1 and this requirement
micro-improvement design sequence number, the first improved design derived model code derived opening not marked
main parameters: expressed by standard installation head
said Sichuan: bottle (station type) Chinese Sample production and sales book: style guide, responsible for the industry section has not been half the sound treatment of the good package table proposed forest code: flow installation sales
4.11 yuan product original plan individual standard society plan completed, and the specification sequence batch half the drawing selection and modification of technical documents 4.1.2 product currency materials, purchased from China and foreign offices what individual specifications or currency case certificate Ma, production and production, quality inspection department qualification inspection individual specifications factory use
113 product titanium parts, generation, signature, receipt , individual, equipment ratio, appearance and other quality should be derived from GT14253-[993 internal determination, the center of mass should be Q01 road 4-1 business regulations:
41.2 All devices that come into contact with the variable, such as pipes, cattle, etc., should be selected according to the price and other points of the material selection. The food liquid car should comply with the regulations of GR16748: core stock pair 106: piece determination 4.1.5 machine reduction and addition "parts technology note bus offline day fat editor come! , GB11 4-000-1 grade m, non-table linearity requirements for male stems leather collection relatives use Ting 18M grade 4.1.6 machine ring plus T shape position male not noted Lan giant should Shenzhen factory (T1184-1946 male if grade K: 4.1. work pay, true original point flow, immediate" view rate word device 41.8 production speed: || tt || 4.1.9 product sequence has safety enterprise support overload protection load mutual.4 .1.10 Production 1 Niu Qi method or GR5226.1-2002 in the 4th to 18th rate % right into the rules 1> work case
4.2.1 annual installation wear device Q [33562, (454BT00182000, or the company can adapt to the production 7 transportation fee request: only the heart quality Xing method of the piece certificate production capacity to be required, the stock 500 general extension exercise of employment profit. 4.2 Industry
4. 2. 3 Source: 3R0: +10″: , 5(:112% 12.2
4.3 Black with fine bird
4.3.1 Product Lan 1 Normal operation, filling head valve) there should be no non-filling price setting should not have the pain of lubrication washing 1.3.? Each pipeline into a dynamic certificate, and the small road should be painted play like QB/T 2747-20C5
4.3.31 Operation level, single, 4 abnormal sound: and the previous customer signal measures and fault signal display should be normal and deep: various safety protection and Jiang lock kinetic energy devices should be used. 4.3.4 When the product is in normal operation, the noise load should not exceed 8DA). 4.3.5 The temperature rise of the continuous flow should comply with the provisions of 4.3.3 of G1423993..4 Performance
4.4.1 The product reaches the rated production capacity
4.4.2 When the product is in normal operation: the bottle damage rate is not less than 0.05%. 4.4.3 When the product is in normal operation, the loading position> the maximum capacity, the standard loading position difference should be less than 6 mm, 4.4.4.4.5 The net power consumption of the product should not be less than 2.2kWm4 5. Product reliability 4.5.1 The efficiency of the product is greater than 4.5.2 The product life is greater than 10000h. 4.5.3 The product life is less than 3h. 5.1 Electrical performance test Before commissioning, the gas part should be tested before commissioning (B>226.) - 2002 No. 19 specification: 4.1.10 5.2 No-load test 5.2.1 Basic requirements for the test of safety / T142 531993=7.7.1 Read the regulations and make sure it meets the requirements of 4.3.3. 5.2.2 Determination of operating noise
The airborne noise of the product shall be tested using the test instrument specified in 199, and the product geometry shall be measured using a flat ball or body measurement scale. The average pressure rise of the entire component shall be 4.3 specifications: 5.2.3 Determination of axial temperature rise
The product shall be rated for production capacity Under the rotation method, the air-conditioning system can be accurately connected to the +1 angle, and the humidity measurement and identification requirements are required to select the bamboo surface. The white goods must be worn at night. The specification of 4.35 should be forgotten. The speed box should meet the requirements of the product manual.
5.3 Performance inspection
5.3.1 Basic requirements
The performance inspection of the product is carried out under the normal working conditions of the actual actual capacity. Use! The test medium is allowed to be replaced by the market, but after installation, the pressure should be adjusted to make a new span of air: 5.3.2 Test conditions for installation test
, after the above production mode is debugged and stabilized: the installation point is stable:
e: the production delay value should be as described above. 5.3.3 Retreat of production capacity, after the production method is stopped, the product Output, Han belt by counting the number of loaded, special time is 5, according to formula (1) production capacity, the interpretation of 4.4.1 is the requirement.
QE/T27472D05
M production capacity, the unit is bottle-year-hour (bottle); full capacity is the number, the unit is bottle.
5.3.4 Bottle loss rate determination
Record the total number of bottles of product input within 0.5h and the number of lost bottles output: (except for those damaged due to unqualified packaging container quality), calculate the loss rate according to formula 2, which should meet the requirements of 4.4.2. F
Bottle loss, %;
Number of bottles in the mountain area, the unit is bottle:
Total number of bottles input, the unit is bottle.
5.3.5 Determination of filling qualified rate
When the machine is working normally, randomly take two samples of the filling machine. Measure the distance from the bottle to the surface with a depth vernier caliper, and draw a scale with a minimum value of 5ml. Measure the filling capacity. The one that meets the requirements of 4.43 is a qualified product. Use formula (3) to calculate the qualified filling rate, which shall comply with the provisions of 4.4.4. ×10
Where:
Filling qualified rate, %;
Number of qualified bottles, unit is ground;
Energy efficiency of a sample, unit is bottle,
5.3.5 Determination of energy consumption
The product is under rated production capacity, and the monthly kilowatt-hour meter is used to measure 0.51. According to formula (4), the product can be filled quickly, which shall comply with the provisions of 4.4.5.
W=10°x-
Where:
Energy consumption of the product, unit is one watt-hour per ton! kw-ht); -The amount of electricity consumed within 0.5h, in watt-hours (kw-h); -The total number of bottles of the product continuously input within 0.5h, expressed as a bottle; -The nominal consumption of each manufacturer: -The unit is grams per liter (mL). 5.4 Determination of the effectiveness of the product
After the product is put into operation, under the fixed capacity state, the product failure support time is tested, and the three-step test downtime is calculated by formula (5), which shall comply with the provisions of 4.5.1. 3
Where:
The effectiveness of the product, %:
The sum of the failure analysis time obtained in the test, in units of hours (). 6 Inspection regulations
4.1 Inspection classification
Product inspection is divided into factory inspection and visual inspection: 6.2 Factory inspection
QB/2747-2005
The spare parts and integrated products produced shall be inspected by the quality inspection department of the manufacturer according to the provisions of production standards <.1, 1.3, 14.1, 4.1.3 and relevant technical documents, and only after the factory can the special certificate be issued. If the factory inspection does not meet the requirements, it is allowed to be re-inspected after repair. The re-inspected piece is not qualified. 6.3 Type inspection
6.3.1 The date of type inspection is all items specified in the technical requirements of this paragraph except 4.5.2 and 4.5.3. 6.3.2 Type inspection according to Sampling of 2% of the production batch, not less than 1 line, should be discarded from the products that pass the factory inspection: the items that meet the test are the product profile. If all items do not meet the requirements, they should be re-inspected. If 1 item is still qualified after sampling, it is judged that the batch of products does not meet the requirements of 4.1.10 electrical safety performance requirements or 4.3.4 noise determination. In other words, it is judged that the product does not meet the requirements of the type inspection and is not allowed to be re-ordered. The user factory can conduct a re-inspection of 63.4 when the following circumstances occur. New product production, ordering and signing company:
structure, materials, two-stage inspection has a major effect, which may affect the product performance: b
): the product air volume must be fully considered during the direct review. : Factory inspection results and 1st inspection·Receipt of major differences 1c
eThe national quality supervision agency is the type inspection requirement: 7 Marking, product instruction manual, packaging, transportation, storage 7.1 Marking
Each product should have the corresponding label in the designated position. The label should comply with G13306. The content of the nameplate should include:
a) Manufacturer's name:
b) (Manufacturing license mark and terminal number of the instrument;) Product model and name:
d) Rated production capacity;
) Total capacity, rated current and power of the meter;
f) Net weight of the product:
) Overall dimensions:
h) Manufacturing plan and number.
7.2 Product Instructions
The product should be used in accordance with the instructions for use, maintenance and upkeep. The content and specifications of the instructions should comply with the provisions of GB9969.1.
1.3 Packaging
7.3.1 The packaging of the product should comply with the provisions of GB/113384: the packaging of the product should comply with the provisions of In/T8356.11996: 7.3.2 The shipping mark on the packaging should contain the provisions of GB/T63BB, and the shipping mark should comply with the provisions of GB/T191. 7.3.3 Domestic sales packaging - Use concrete packaging boxes, light boxes should comply with the provisions of GB1304[:1991. 3.4 Product specifications and technical documents should be included in the packaging of the product, and the technical documents should be included: QH27472005) Product certification: Product instructions: Product packaging list. 4 Transportation 7.4.1 The product should be transported in bulk or in separate packages: It should meet the requirements of land or water loading and transportation. 7.4.2 There should be no serious vibration, impact and shock during transportation and loading, and the product should be guaranteed to be protected from the environment. 7.5 Storage
7.6.1 The product should be stored in a ventilated, dry and rainproof indoor place. It should not be stored or placed in a large place. It should not be stored together with corrosive substances or substances harmful to the human body. 7.5.2 The product should be inspected every 12 months and anti-rust and anti-corrosion treatment should be carried out again when necessary.2. Determination of operating noise
The test of airborne noise of products shall be carried out by using the measuring instrument of 199 standard, and the product shall be measured by a flat ball or a body measurement scale, and the average pressure rise of the whole parts shall be measured by 4.3 standard: 5.2.3 Determination of temperature rise of the shaft
The product shall be operated under rated capacity under continuous air operation, and the surface of the bamboo shall be accurately measured at an angle of +1. The white goods shall be worn at night at a standard of 4.35, and the gearbox shall meet the requirements of the external point! The product shall be used with the instruction manual,
5.3 Performance inspection
5.3.1 Basic requirements
The product shall be inspected for performance under the condition of air operation, and the rated capacity shall be carried out under the normal working conditions! The test medium is allowed to be replaced by the market, but after installation, the pressure should be adjusted to make a new span: 5.3.2 Test conditions for installation test
, after the above production mode is debugged and proved to be stable: the installation is at the bottom of the relative stability:
e: the production delay number should be as follows. 5.3.3 Determination of production capacity, after the production method stops normally, when the product is out, the number of installed capacity is calculated, and the specific time is 5, according to formula (1) production capacity, the interpretation of 4.4.1 is the requirement.
QE/T27472D05
M production capacity, the unit is bottle-year-hour (bottle); full capacity is the number, the unit is bottle.
5.3.4 Determination of bottle loss rate
Record the total number of bottles of product put into the filling machine within 0.5h and the number of bottles lost (except those damaged due to unqualified filling container quality), calculate the loss rate according to formula 2, which shall comply with the provisions of 4.4.2. F
Bottle loss, %;
Number of bottles put into the filling machine, in units of bottles:
Total number of bottles put into the filling machine, in units of bottles.
5.3.5 Determination of filling qualified rate
During normal operation, randomly take two samples of the filling machine, use a depth vernier caliper to measure the distance from the bottle to the injection surface, and take out a minimum value of 5ml. Measure the filling capacity. The one that meets the requirements of 4.43 is qualified. Then use formula (3) to calculate the filling qualified rate, which shall comply with the provisions of 4.4.4. ×10
Wherein:
Filling qualified rate, %;
Number of qualified bottles filled, unit is bottle;
Sample energy efficiency, unit is bottle,
5.3.5 Determination of energy consumption
When the product is at rated production capacity, the monthly kilowatt-hour meter is used to measure 0.51. According to formula (4), the speed of loading of the product can meet the requirements of 4.4.5,
W=10°x-
Wherein:
The energy consumption of the product for loading liquid is one watt-hour per ton! kw-ht); -The amount of electricity consumed within 0.5h, in watt-hours (kw-h); -The total number of bottles of the product continuously input within 0.5h, expressed as a bottle; -The nominal consumption of each manufacturer: -The unit is grams per liter (mL). 5.4 Determination of the effectiveness of the product
After the product is put into operation, under the fixed capacity state, the product failure support time is tested, and the three-step test downtime is calculated by formula (5), which shall comply with the provisions of 4.5.1. 3
Where:
The effectiveness of the product, %:
The sum of the failure analysis time obtained in the test, in units of hours (). 6 Inspection regulations
4.1 Inspection classification
Product inspection is divided into factory inspection and visual inspection: 6.2 Factory inspection
QB/2747-2005
The spare parts and integrated products produced shall be inspected by the quality inspection department of the manufacturer according to the provisions of production standards <.1, 1.3, 14.1, 4.1.3 and relevant technical documents, and only after the factory can the special certificate be issued. If the factory inspection does not meet the requirements, it is allowed to be re-inspected after repair. The re-inspected piece is not qualified. 6.3 Type inspection
6.3.1 The date of type inspection is all items specified in the technical requirements of this paragraph except 4.5.2 and 4.5.3. 6.3.2 Type inspection according to Sampling of 2% of the production batch, not less than 1 line, should be discarded from the products that pass the factory inspection: the items that meet the test are the product profile. If all items do not meet the requirements, they should be re-inspected. If 1 item is still qualified after sampling, it is judged that the batch of products does not meet the requirements of 4.1.10 electrical safety performance requirements or 4.3.4 noise determination. In other words, it is judged that the product does not meet the requirements of the type inspection and is not allowed to be re-ordered. The user factory can conduct a re-inspection of 63.4 when the following circumstances occur. New product production, ordering and signing company:
structure, materials, two-stage inspection has a major effect, which may affect the product performance: b
): the product air volume must be fully considered during the direct review. : Factory inspection results and 1st inspection·Receipt of major differences 1c
eThe national quality supervision agency is the type inspection requirement: 7 Marking, product instruction manual, packaging, transportation, storage 7.1 Marking
Each product should have the corresponding label in the designated position. The label should comply with G13306. The content of the nameplate should include:
a) Manufacturer's name:
b) (Manufacturing license mark and terminal number of the instrument;) Product model and name:
d) Rated production capacity;
) Total capacity, rated current and power of the meter;
f) Net weight of the product:
) Overall dimensions:bZxz.net
h) Manufacturing plan and number.
7.2 Product Instructions
The product should be used in accordance with the instructions for use, maintenance and upkeep. The content and specifications of the instructions should comply with the provisions of GB9969.1.
1.3 Packaging
7.3.1 The packaging of the product should comply with the provisions of GB/113384: the packaging of the product should comply with the provisions of In/T8356.11996: 7.3.2 The shipping mark on the packaging should contain the provisions of GB/T63BB, and the shipping mark should comply with the provisions of GB/T191. 7.3.3 Domestic sales packaging - Use concrete packaging boxes, light boxes should comply with the provisions of GB1304[:1991. 3.4 Product specifications and technical documents should be included in the packaging of the product, and the technical documents should be included: QH27472005) Product certification: Product instructions: Product packaging list. 4 Transportation 7.4.1 The product should be transported in bulk or in separate packages: It should meet the requirements of land or water loading and transportation. 7.4.2 There should be no serious vibration, impact and shock during transportation and loading, and the product should be guaranteed to be protected from the environment. 7.5 Storage
7.6.1 The product should be stored in a ventilated, dry and rainproof indoor place. It should not be stored or placed in a large place. It should not be stored together with corrosive substances or substances harmful to the human body. 7.5.2 The product should be inspected every 12 months and anti-rust and anti-corrosion treatment should be carried out again when necessary.2. Determination of operating noise
The test of airborne noise of products shall be carried out by using the measuring instrument of 199 standard, and the product shall be measured by a flat ball or a body measurement scale, and the average pressure rise of the whole parts shall be measured by 4.3 standard: 5.2.3 Determination of temperature rise of the shaft
The product shall be operated under rated capacity under continuous air operation, and the surface of the bamboo shall be accurately measured at an angle of +1. The white goods shall be worn at night at a standard of 4.35, and the gearbox shall meet the requirements of the external point! The product shall be used with the instruction manual,
5.3 Performance inspection
5.3.1 Basic requirements
The product shall be inspected for performance under the condition of air operation, and the rated capacity shall be carried out under the normal working conditions! The test medium is allowed to be replaced by the market, but after installation, the pressure should be adjusted to make a new span: 5.3.2 Test conditions for installation test
, after the above production mode is debugged and proved to be stable: the installation is at the bottom of the relative stability:
e: the production delay number should be as follows. 5.3.3 Determination of production capacity, after the production method stops normally, when the product is out, the number of installed capacity is calculated, and the specific time is 5, according to formula (1) production capacity, the interpretation of 4.4.1 is the requirement.
QE/T27472D05
M production capacity, the unit is bottle-year-hour (bottle); full capacity is the number, the unit is bottle.
5.3.4 Determination of bottle loss rate
Record the total number of bottles of product put into the filling machine within 0.5h and the number of bottles lost (except those damaged due to unqualified filling container quality), calculate the loss rate according to formula 2, which shall comply with the provisions of 4.4.2. F
Bottle loss, %;
Number of bottles put into the filling machine, in units of bottles:
Total number of bottles put into the filling machine, in units of bottles.
5.3.5 Determination of filling qualified rate
During normal operation, randomly take two samples of the filling machine, use a depth vernier caliper to measure the distance from the bottle to the injection surface, and take out a minimum value of 5ml. Measure the filling capacity. The one that meets the requirements of 4.43 is qualified. Then use formula (3) to calculate the filling qualified rate, which shall comply with the provisions of 4.4.4. ×10
Wherein:
Filling qualified rate, %;
Number of qualified bottles filled, unit is bottle;
Sample energy efficiency, unit is bottle,
5.3.5 Determination of energy consumption
When the product is at rated production capacity, the monthly kilowatt-hour meter is used to measure 0.51. According to formula (4), the speed of loading of the product can meet the requirements of 4.4.5,
W=10°x-
Wherein:
The energy consumption of the product for loading liquid is one watt-hour per ton! kw-ht); -The amount of electricity consumed within 0.5h, in watt-hours (kw-h); -The total number of bottles of the product continuously input within 0.5h, expressed as a bottle; -The nominal consumption of each manufacturer: -The unit is grams per liter (mL). 5.4 Determination of the effectiveness of the product
After the product is put into operation, under the fixed capacity state, the product failure support time is tested, and the three-step test downtime is calculated by formula (5), which shall comply with the provisions of 4.5.1. 3
Where:
The effectiveness of the product, %:
The sum of the failure analysis time obtained in the test, in units of hours (). 6 Inspection regulations
4.1 Inspection classification
Product inspection is divided into factory inspection and visual inspection: 6.2 Factory inspection
QB/2747-2005
The spare parts and integrated products produced shall be inspected by the quality inspection department of the manufacturer according to the provisions of production standards <.1, 1.3, 14.1, 4.1.3 and relevant technical documents, and only after the factory can the special certificate be issued. If the factory inspection does not meet the requirements, it is allowed to be re-inspected after repair. The re-inspected piece is not qualified. 6.3 Type inspection
6.3.1 The date of type inspection is all items specified in the technical requirements of this paragraph except 4.5.2 and 4.5.3. 6.3.2 Type inspection according to Sampling of 2% of the production batch, not less than 1 line, should be discarded from the products that pass the factory inspection: the items that meet the test are the product profile. If all items do not meet the requirements, they should be re-inspected. If 1 item is still qualified after sampling, it is judged that the batch of products does not meet the requirements of 4.1.10 electrical safety performance requirements or 4.3.4 noise determination. In other words, it is judged that the product does not meet the requirements of the type inspection and is not allowed to be re-ordered. The user factory can conduct a re-inspection of 63.4 when the following circumstances occur. New product production, ordering and signing company:
structure, materials, two-stage inspection has a major effect, which may affect the product performance: b
): the product air volume must be fully considered during the direct review. : Factory inspection results and 1st inspection·Receipt of major differences 1c
eThe national quality supervision agency is the type inspection requirement: 7 Marking, product instruction manual, packaging, transportation, storage 7.1 Marking
Each product should have the corresponding label in the designated position. The label should comply with G13306. The content of the nameplate should include:
a) Manufacturer's name:
b) (Manufacturing license mark and terminal number of the instrument;) Product model and name:
d) Rated production capacity;
) Total capacity, rated current and power of the meter;
f) Net weight of the product:
) Overall dimensions:
h) Manufacturing plan and number.
7.2 Product Instructions
The product should be used in accordance with the instructions for use, maintenance and upkeep. The content and specifications of the instructions should comply with the provisions of GB9969.1.
1.3 Packaging
7.3.1 The packaging of the product should comply with the provisions of GB/113384: the packaging of the product should comply with the provisions of In/T8356.11996: 7.3.2 The shipping mark on the packaging should contain the provisions of GB/T63BB, and the shipping mark should comply with the provisions of GB/T191. 7.3.3 Domestic sales packaging - Use concrete packaging boxes, light boxes should comply with the provisions of GB1304[:1991. 3.4 Product specifications and technical documents should be included in the packaging of the product, and the technical documents should be included: QH27472005) Product certification: Product instructions: Product packaging list. 4 Transportation 7.4.1 The product should be transported in bulk or in separate packages: It should meet the requirements of land or water loading and transportation. 7.4.2 There should be no serious vibration, impact and shock during transportation and loading, and the product should be guaranteed to be protected from the environment. 7.5 Storage
7.6.1 The product should be stored in a ventilated, dry and rainproof indoor place. It should not be stored or placed in a large place. It should not be stored together with corrosive substances or substances harmful to the human body. 7.5.2 The product should be inspected every 12 months and anti-rust and anti-corrosion treatment should be carried out again when necessary.2. F
Bottle damage, %;
Bottle load in the mountain area, unit is bottle:
Total number of inflows, unit is bottle.
5.3.5 Determination of filling qualified rate
During normal operation, randomly take two samples of the filling machine, use a depth vernier caliper to measure the distance from the bottle to the injection surface, and take out a measuring tube with a minimum value of 5ml, measure its variable filling capacity, and those that meet the requirements of 4.43 are qualified products. Use formula (3) to calculate the filling qualified rate, which shall comply with the provisions of 4.4.4. ×10
Wherein:
Filling qualified rate, %;
Number of qualified bottles filled, unit is bottle;
Sample energy efficiency, unit is bottle,
5.3.5 Determination of energy consumption
When the product is at rated production capacity, the monthly kilowatt-hour meter is used to measure 0.51. According to formula (4), the speed of loading of the product can meet the requirements of 4.4.5,
W=10°x-
Wherein:
The energy consumption of the product for loading liquid is one watt-hour per ton! kw-ht); -The amount of electricity consumed within 0.5h, in watt-hours (kw-h); -The total number of bottles of the product continuously input within 0.5h, expressed as a bottle; -The nominal consumption of each manufacturer: -The unit is grams per liter (mL). 5.4 Determination of the effectiveness of the product
After the product is put into operation, under the fixed capacity state, the product failure support time is tested, and the three-step test downtime is calculated by formula (5), which shall comply with the provisions of 4.5.1. 3
Where:
The effectiveness of the product, %:
The sum of the failure analysis time obtained in the test, in units of hours (). 6 Inspection regulations
4.1 Inspection classification
Product inspection is divided into factory inspection and visual inspection: 6.2 Factory inspection
QB/2747-2005
The spare parts and integrated products produced shall be inspected by the quality inspection department of the manufacturer according to the provisions of production standards <.1, 1.3, 14.1, 4.1.3 and relevant technical documents, and only after the factory can the special certificate be issued. If the factory inspection does not meet the requirements, it is allowed to be re-inspected after repair. The re-inspected piece is not qualified. 6.3 Type inspection
6.3.1 The date of type inspection is all items specified in the technical requirements of this paragraph except 4.5.2 and 4.5.3. 6.3.2 Type inspection according to Sampling of 2% of the production batch, not less than 1 line, should be discarded from the products that pass the factory inspection: the items that meet the test are the product profile. If all items do not meet the requirements, they should be re-inspected. If 1 item is still qualified after sampling, it is judged that the batch of products does not meet the requirements of 4.1.10 electrical safety performance requirements or 4.3.4 noise determination. In other words, it is judged that the product does not meet the requirements of the type inspection and is not allowed to be re-ordered. The user factory can conduct a re-inspection of 63.4 when the following circumstances occur. New product production, ordering and signing company:
structure, materials, two-stage inspection has a major effect, which may affect the product performance: b
): the product air volume must be fully considered during the direct review. : Factory inspection results and 1st inspection·Receipt of major differences 1c
eThe national quality supervision agency is the type inspection requirement: 7 Marking, product instruction manual, packaging, transportation, storage 7.1 Marking
Each product should have the corresponding label in the designated position. The label should comply with G13306. The content of the nameplate should include:
a) Manufacturer's name:
b) (Manufacturing license mark and terminal number of the instrument;) Product model and name:
d) Rated production capacity;
) Total capacity, rated current and power of the meter;
f) Net weight of the product:
) Overall dimensions:
h) Manufacturing plan and number.
7.2 Product Instructions
The product should be used in accordance with the instructions for use, maintenance and upkeep. The content and specifications of the instructions should comply with the provisions of GB9969.1.
1.3 Packaging
7.3.1 The packaging of the product should comply with the provisions of GB/113384: the packaging of the product should comply with the provisions of In/T8356.11996: 7.3.2 The shipping mark on the packaging should contain the provisions of GB/T63BB, and the shipping mark should comply with the provisions of GB/T191. 7.3.3 Domestic sales packaging - Use concrete packaging boxes, light boxes should comply with the provisions of GB1304[:1991. 3.4 Product specifications and technical documents should be included in the packaging of the product, and the technical documents should be included: QH27472005) Product certification: Product instructions: Product packaging list. 4 Transportation 7.4.1 The product should be transported in bulk or in separate packages: It should meet the requirements of land or water loading and transportation. 7.4.2 There should be no serious vibration, impact and shock during transportation and loading, and the product should be guaranteed to be protected from the environment. 7.5 Storage
7.6.1 The product should be stored in a ventilated, dry and rainproof indoor place. It should not be stored or placed in a large place. It should not be stored together with corrosive substances or substances harmful to the human body. 7.5.2 The product should be inspected every 12 months and anti-rust and anti-corrosion treatment should be carried out again when necessary.2. F
Bottle damage, %;
Bottle load in the mountain area, unit is bottle:
Total number of inflows, unit is bottle.
5.3.5 Determination of filling qualified rate
During normal operation, randomly take two samples of the filling machine, use a depth vernier caliper to measure the distance from the bottle to the injection surface, and take out a measuring tube with a minimum value of 5ml, measure its variable filling capacity, and those that meet the requirements of 4.43 are qualified products. Use formula (3) to calculate the filling qualified rate, which shall comply with the provisions of 4.4.4. ×10
Wherein:
Filling qualified rate, %;
Number of qualified bottles filled, unit is bottle;
Sample energy efficiency, unit is bottle,
5.3.5 Determination of energy consumption
When the product is at rated production capacity, the monthly kilowatt-hour meter is used to measure 0.51. According to formula (4), the speed of loading of the product can meet the requirements of 4.4.5,
W=10°x-
Wherein:
The energy consumption of the product for loading liquid is one watt-hour per ton! kw-ht); -The amount of electricity consumed within 0.5h, in watt-hours (kw-h); -The total number of bottles of the product continuously input within 0.5h, expressed as a bottle; -The nominal consumption of each manufacturer: -The unit is grams per liter (mL). 5.4 Determination of the effectiveness of the product
After the product is put into operation, under the fixed capacity state, the product failure support time is tested, and the three-step test downtime is calculated by formula (5), which shall comply with the provisions of 4.5.1. 3
Where:
The effectiveness of the product, %:
The sum of the failure analysis time obtained in the test, in units of hours (). 6 Inspection regulations
4.1 Inspection classification
Product inspection is divided into factory inspection and visual inspection: 6.2 Factory inspection
QB/2747-2005
The spare parts and integrated products produced shall be inspected by the quality inspection department of the manufacturer according to the provisions of production standards <.1, 1.3, 14.1, 4.1.3 and relevant technical documents, and only after the factory can the special certificate be issued. If the factory inspection does not meet the requirements, it is allowed to be re-inspected after repair. The re-inspected piece is not qualified. 6.3 Type inspection
6.3.1 The date of type inspection is all items specified in the technical requirements of this paragraph except 4.5.2 and 4.5.3. 6.3.2 Type inspection according to Sampling of 2% of the production batch, not less than 1 line, should be discarded from the products that pass the factory inspection: the items that meet the test are the product profile. If all items do not meet the requirements, they should be re-inspected. If 1 item is still qualified after sampling, it is judged that the batch of products does not meet the requirements of 4.1.10 electrical safety performance requirements or 4.3.4 noise determination. In other words, it is judged that the product does not meet the requirements of the type inspection and is not allowed to be re-ordered. The user factory can conduct a re-inspection of 63.4 when the following circumstances occur. New product production, ordering and signing company:
structure, materials, two-stage inspection has a major effect, which may affect the product performance: b
): the product air volume must be fully considered during the direct review. : Factory inspection results and 1st inspection·Receipt of major differences 1c
eThe national quality supervision agency is the type inspection requirement: 7 Marking, product instruction manual, packaging, transportation, storage 7.1 Marking
Each product should have the corresponding label in the designated position. The label should comply with G13306. The content of the nameplate should include:
a) Manufacturer's name:
b) (Manufacturing license mark and terminal number of the instrument;) Product model and name:
d) Rated production capacity;
) Total capacity, rated current and power of the meter;
f) Net weight of the product:
) Overall dimensions:
h) Manufacturing plan and number.
7.2 Product Instructions
The product should be used in accordance with the instructions for use, maintenance and upkeep. The content and specifications of the instructions should comply with the provisions of GB9969.1.
1.3 Packaging
7.3.1 The packaging of the product should comply with the provisions of GB/113384: the packaging of the product should comply with the provisions of In/T8356.11996: 7.3.2 The shipping mark on the packaging should contain the provisions of GB/T63BB, and the shipping mark should comply with the provisions of GB/T191. 7.3.3 Domestic sales packaging - Use concrete packaging boxes, light boxes should comply with the provisions of GB1304[:1991. 3.4 Product specifications and technical documents should be included in the packaging of the product, and the technical documents should be included: QH27472005) Product certification: Product instructions: Product packaging list. 4 Transportation 7.4.1 The product should be transported in bulk or in separate packages: It should meet the requirements of land or water loading and transportation. 7.4.2 There should be no serious vibration, impact and shock during transportation and loading, and the product should be guaranteed to be protected from the environment. 7.5 Storage
7.6.1 The product should be stored in a ventilated, dry and rainproof indoor place. It should not be stored or placed in a large place. It should not be stored together with corrosive substances or substances harmful to the human body. 7.5.2 The product should be inspected every 12 months and anti-rust and anti-corrosion treatment should be carried out again when necessary.1. Visual inspection and acceptance inspection. 1c. The national quality supervision agency shall issue type inspection requirements: 7. Marking, product instruction manual, packaging, transportation, storage 7.1 Marking
Each product shall have the corresponding label in the designated position. The label shall comply with G13306. The nameplate shall include:
a) Manufacturer’s name:
b) (Manufacturing license mark and terminal number of the instrument;) Product model and name:
d) Rated production capacity;
) Total capacity, rated current and power of the instrument; f) Net weight of the product:
) Overall dimensions:
h) Manufacturing plan and number.
7.2 Product Instructions
The product should be used in accordance with the instructions for use, maintenance and upkeep. The content and specifications of the instructions should comply with the provisions of GB9969.1.
1.3 Packaging
7.3.1 The packaging of the product should comply with the provisions of GB/113384: the packaging of the product should comply with the provisions of In/T8356.11996: 7.3.2 The shipping mark on the packaging should contain the provisions of GB/T63BB, and the shipping mark should comply with the provisions of GB/T191. 7.3.3 Domestic sales packaging - Use concrete packaging boxes, light boxes should comply with the provisions of GB1304[:1991. 3.4 Product specifications and technical documents should be included in the packaging of the product, and the technical documents should be included: QH27472005) Product certification: Product instructions: Product packaging list. 4 Transportation 7.4.1 The product should be transported in bulk or in separate packages: It should meet the requirements of land or water loading and transportation. 7.4.2 There should be no serious vibration, impact and shock during transportation and loading, and the product should be guaranteed to be protected from the environment. 7.5 Storage
7.6.1 The product should be stored in a ventilated, dry and rainproof indoor place. It should not be stored or placed in a large place. It should not be stored together with corrosive substances or substances harmful to the human body. 7.5.2 The product should be inspected every 12 months and anti-rust and anti-corrosion treatment should be carried out again when necessary.1. Visual inspection and acceptance inspection. 1c. The national quality supervision agency shall issue type inspection requirements: 7. Marking, product instruction manual, packaging, transportation, storage 7.1 Marking
Each product shall have the corresponding label in the designated position. The label shall comply with G13306. The nameplate shall include:
a) Manufacturer’s name:
b) (Manufacturing license mark and terminal number of the instrument;) Product model and name:
d) Rated production capacity;
) Total capacity, rated current and power of the instrument; f) Net weight of the product:
) Overall dimensions:
h) Manufacturing plan and number.
7.2 Product Instructions
The product should be used in accordance with the instructions for use, maintenance and upkeep. The content and specifications of the instructions should comply with the provisions of GB9969.1.
1.3 Packaging
7.3.1 The packaging of the product should comply with the provisions of GB/113384: the packaging of the product should comply with the provisions of In/T8356.11996: 7.3.2 The shipping mark on the packaging should contain the provisions of GB/T63BB, and the shipping mark should comply with the provisions of GB/T191. 7.3.3 Domestic sales packaging - Use concrete packaging boxes, light boxes should comply with the provisions of GB1304[:1991. 3.4 Product specifications and technical documents should be included in the packaging of the product, and the technical documents should be included: QH27472005) Product certification: Product instructions: Product packaging list. 4 Transportation 7.4.1 The product should be transported in bulk or in separate packages: It should meet the requirements of land or water loading and transportation. 7.4.2 There should be no serious vibration, impact and shock during transportation and loading, and the product should be guaranteed to be protected from the environment. 7.5 Storage
7.6.1 The product should be stored in a ventilated, dry and rainproof indoor place. It should not be stored or placed in a large place. It should not be stored together with corrosive substances or substances harmful to the human body. 7.5.2 The product should be inspected every 12 months and anti-rust and anti-corrosion treatment should be carried out again when necessary.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.