This standard specifies the technical requirements, inspection rules, marking, packaging, transportation and storage of gas mixture heaters using positive temperature coefficient thermistors as heating elements for gasoline engines. This standard applies to mixture heaters used to heat the gasoline-air mixture during starting and low-temperature operation of gasoline engines. JB/T 6025.2-1992 Technical conditions for mixture heaters for gasoline engines JB/T6025.2-1992 Standard download and decompression password: www.bzxz.net
Some standard content:
J94 JB Machinery Industry Standard of the People's Republic of China JB/T6025.16025.3-92 Mixture heater for carburetor 1992- Published on 05-28 Implemented by the Ministry of Mechanical and Electronics Industry of the People's Republic of China on 1993-01-01 Published Machinery Industry Standard of the People's Republic of China Mixture heater for gasoline engines | |tt | Technical requirements and testing rules for condensing gas heaters. Marking, packaging, transportation and storage, bzxZ.net This standard applies to mixture heaters (hereinafter referred to as heaters) that heat the gasoline-air mixture during starting and low-temperature operation of gasoline engines 2 cited standards| | tt | | GB2828 | Heater test method 3 product model The heater product model should comply with the regulations of JB6025.1. 4 Technical requirements 4.1 Appearance quality The heater surface must not have burrs, and the casting should be free of looseness and pores. The total length of the missing heating pins of the heater shall not be greater than 1/2 the length of the heating pins. 4.2 Cold resistance value When the ambient temperature is 23 ± 2°C. The cold resistance value of the heater (Q ) should comply with the value specified in its product code. 4.3 Temperature-time characteristics When the ambient temperature is 23 ± 2°C, 12 seconds after the heater is connected to the power supply with a voltage of 1.25% and rated operating voltage, the root temperature of the central heating pin shall not be lower than 60°C; 180s after power-on. The temperature at the root of the central heating pin shall not be less than 150℃, 4.4 Overvoltage withstanding capability a. The heater shall undergo an overvoltage test of 1.35 times the rated working voltage for 60 minutes; b. The heater shall A short-time overvoltage test of 1.65 times the rated operating voltage lasting 2 minutes should be carried out. After the test, its performance should still comply with the provisions of Articles 4.2 and 4.8. 4.5 High Humidity Resistance Performance The heater shall be operated at an ambient temperature of 180°C. Article 3.4 of JB/T6025.3 conducts a high-temperature test. After the test, its performance should still comply with the provisions of Article 4.3 of this standard. Before and after the test, the cold resistance value is allowed to change ±0.050.4.6 Low current resistance performance ||tt| |The heater shall be subjected to a low-temperature test in accordance with Article 3.5 of JB/T6025.3 at an ambient temperature of -40°C. After the test, its performance shall still comply with the provisions of Articles 4.2 and 4.3. After the risk test and the test, its performance shall The peak current is allowed to change ±10% compared with that before the test. 4.7 Anti-alarm test Mechanical and Electrical Industry Ministry approved 2 on 1992-05-28 Implemented on 1993-01-01 JB/T6025.2-92 The heater shall undergo a vibration test in accordance with Article 3.6 of JB/T6025.3. After the test, the heater shall have no deformation or damage, and its performance shall still comply with the provisions of Articles 4.2 and 4.3. 4.8 Durability performance The heater shall undergo durability testing in accordance with Article 3.7 of JB/T6025.3. After the test, its performance shall still comply with the provisions of Article 4.3. The peak current is compared with that before the test. The allowed variation is ±10%. 4.9 Anti-salt chip performance The heater shall undergo a 96-hour salt spray test in accordance with Article 3.8 of JB/T6025.3. After the test, its performance shall still comply with the provisions of Article 4.3 5 Inspection Rules 5.1 Factory Inspection 5.1.1 Only after the product has passed the inspection by the quality inspection department and is accompanied by a product certification certificate can it leave the factory. 5.1.2 Factory inspection items include the recognition time characteristics of 12 seconds after power on in Article 4.1.4.2 and Article 4.3. 5.2 Continuous batch remote batch inspection 5.2.1 Batch quality products must be inspected by the factory quality inspection department. Based on the batch N, batch-by-batch inspection shall be carried out according to the GB2828 normal sampling plan. 5.2.2 The test pieces inspected batch by batch are divided into two groups. The test content of each group is as follows: Group 1: Appearance quality, cold resistance, temperature and time resistance, overvoltage performance (inspection according to job order). Group 2: short-term overvoltage performance. 5.2.3 The classification, inspection level and unqualified quality level of unqualified products inspected batch by batch are as shown in Table 1: Table 1 Category A c| |tt||5.3 Type inspection Inspection items item cold resistance; temperature time characteristics; overvoltage performance; short-time overvoltage performance appearance inspection 5.3 .1 When any of the following situations occurs, type testing should be carried out: a. Trial prototype identification of new products and factory-transferred production: b. After formal production, if there are major changes in structure, materials, and processes that may affect product performance; during formal production, inspections must be conducted at least once every two years; c. d. When the product is resumed after more than 6 months of production: e. When the domestic quality supervision agency requests type testing. IL 1 AQL 2.5 40 5.3.2 Type test items are all items specified in the technical requirements of this standard H. Type test The test pieces should be divided into seven groups, with no less than 3 sets per correction except for durability performance. The test content of each group is as follows: Group 1: appearance quality, cold resistance, temperature time characteristics, overvoltage performance (in order) Group 2: short-time overvoltage performance; Group 3: High temperature resistance; The fourth group: low temperature resistance; The fifth group: vibration resistance; The sixth group: salt spray resistance; Group Seven: Durable Performance. 5.3.3 The sampling procedure for the type test conducted according to Article 5.3.1c and e shall be in accordance with the one-time sampling plan of GB2828. The classification level and quality level of unqualified products are as shown in Table 2: 3 6 Category A B c||tt| |Check Check JB/T6025.2—92 Table 2 item cold resistance; overtime characteristics; overvoltage performance; Short-term over-voltage performance, resistance to high filtration performance; resistance to low degradation: anti-vibration performance; resistance to fog, durability performance Appearance inspection Marking, packaging, transportation and storage||tt| | 6.1 | 1 3 Each product should be safely and reliably packed in a position lined with filling materials. The exposed packaging basin should be marked with the date: a. b. G d. e. 6.3 Manufacturer name; Product name and mark; Factory number: Year and month of manufacture; Batch number: Put the packaged products into a packaging box with anti-shedding and anti-exposure measures. The outside of the packaging box should be marked. :a. b. c. Manufacturing name: Quantity per box: Total weight.kg: d. Product name and mark: e. f. Volume: length × width × height.mm; "Effective", "Do not press too hard", "Anti-attachment", "Anti-traceable" and other words or signs. The packaging box should be accompanied by a packing list, product certificate and instructions as needed. 6.4 6.5 During the transportation of products, there should be anti-south control measures. 6.6 The product should be stored in a warehouse that is moisture-proof, ventilated, flat, dry and has anti-use conditions. Additional notes: This standard was proposed by Shanguanjin Internal Combustion Engine Research Institute and belongs to Fukou. This standard was drafted with the financial support of Jinan Automobile Low Temperature Starting Device Guanghe Tianjin Internal Combustion Engine Research Institute. The main drafters of this standard are Ni Jianhua, Jing Shenhe, Shan Ruren, Tui Hongke, and Wei Tiecheng. 4 DL 1 n AQL 50 250 250 300| |tt|| Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.