SY 6348-1998 Safety regulations for geological logging operations

Basic Information

Standard ID: SY 6348-1998

Standard Name: Safety regulations for geological logging operations

Chinese Name: 地质录井作业安全规程

Standard category:Oil and gas industry standards (SY)

state:in force

Date of Release1998-04-26

Date of Implementation:1998-08-01

standard classification number

Standard ICS number:Environmental protection, health and safety >> 13.100 Occupational safety, industrial hygiene

Standard Classification Number:Petroleum>>Petroleum General>>E09 Health, Safety, Labor Protection

associated standards

Publication information

other information

Introduction to standards:

SY 6348-1998 Safety regulations for geological logging operations SY6348-1998 Standard download decompression password: www.bzxz.net

Some standard content:

ICS 13.100
Registration number: 1442—1998
Petroleum and natural gas industry standard of the People's Republic of China SY 6348-1998
Safety code for geologic logging operation
1998- 04-26 Issued
China National Petroleum Corporation
1998-08-01 Implementation
SY 6348—1998
In order to improve and maintain the safety of onshore oil and gas logging workers and meet the requirements of safety management in the whole industry, this standard is specially formulated. This standard specifies the safety operation requirements for various operations in onshore oil and gas logging. This standard was proposed by the Professional Standardization Technical Committee of the Petroleum Industry Safety Committee and drafted by the following units: Changqing Petroleum Exploration and Development Technology Supervision and Safety and Environmental Protection Department, Shenghe Petroleum Management and Safety Department, Shengli Petroleum Administration Bureau Geological Logging Company.
Main drafters of this standard Ma QufawwW.bzxz.Net
Zhao Renbing Li Zhiguang
1 Scope
Petroleum and Natural Gas Industry Standard of the People's Republic of China Safety Code for Geological Logging Operation
Safety code for gcologic logging operation This standard specifies the safety requirements for oil and natural gas logging operations. This standard applies to all operations of geological logging of petroleum and natural gas. 2 Referenced standards
SY 6348-1998
The following standards contain provisions that constitute the provisions of this standard through reference in this standard. The versions shown are valid at the time of publication of the standard. All standards will be revised, and parties using this standard should explore the possibility of using the latest version of the following standards. GB5082-1985 Lifting equipment selection signal (GI360) 67-1985 Safety regulations for lifting machinery SY5190-91 Technical conditions for comprehensive logging SY/T5191-93 Technical conditions for gas chromatograph lift gauge SY5225-199 Fire and explosion safety management regulations for drilling, development, storage and transportation of petroleum and natural gas SY5576-93 Drilling team camping house SY/T 5788.1-93 Shibo Natural Gas Drilling and Geological Comprehensive Logging Regulations SY6014-94 Safety Regulations for Petroleum Geology Laboratory SY/:6022-94 Comprehensive Logging Installation Technical Specifications SY6043-94 Drilling Equipment Installation Safety Regulations 3 Logging Preparation
3.1 Relocation of Facilities and Instruments
3.1.1 When relocating facilities and instruments, inflammable and explosive items are prohibited in the room, and all items should be fixed firmly. 3.1.2 Hoisting and hanging should comply with the provisions of 2.1.1 in GB 5082-1985 and 5.1.3 in GB 6067-1983. 3.1.3 When transporting the equipment room, there should be a special person to escort it and drive it smoothly to prevent damage to the equipment. 3.1.4 The geological duty room and instrument room should be placed 1025m away from the dynamic screen, in line with the requirements of the drilling site layout: 3.2 Installation and adjustment of facilities and instruments
The installation of logging equipment should comply with the provisions of $Y/T5788.1933.1, 3.2, 3.4. 3.2.13
The logging equipment should be tested and inspected according to 8Y/T5788.1-934.1: 3.2.2
The instrument room is equipped with a micro indoor gas alarm 3. 2.3
The receiver room should be equipped with two 8kg1211 fire extinguishers, which should be placed in a convenient place for use. 3.2.4
The safety door should be regularly inspected and kept flexible and convenient. 3.2.5
The instrument room should be equipped with fire prevention, explosion prevention and electric shock warning signs. The electric heater and sample drying box should be 0.2m away from the wall. Flammable items are prohibited from being placed around the enclosure. The power cord of the sample drying oven should be connected separately. Approved by China National Petroleum Corporation on 1998-04-26, 1998-08- Implementation
3.3 Installation of simple drilling device
SY 63481998
3.3.1 The fixed pulley of the simple drilling device should be firmly attached to the derrick1.03.3.2 Both ends of the measuring rope of the simple drilling device should be firmly clamped, and the upper and lower movable measuring rope should not interfere with the derrick3.3.3 The guide rope of the simple drilling device should be straightened, and the distance between it and the power line should be no less than 0.5m, and a protective device should be installed on the ground. 3.3.4 When working on the rack, the operator should contact the driller on duty first, and comply with the provisions of 3.2, 3.3, 3.5, 3.8, 3.1m, and 3.12 in SY6043-94:
3.4 ​​Installation of gas system
3.4.1 Installation of electrical system in the field room SY5576-9345.4.1, 3.4.2.5.4.6, 5.4.7.5.4.8 and 10.3 in SY6043-94. 2 regulations
3.4.2 A dedicated line shall be set up for power consumption of epidemic prevention equipment, and four-core cable shall be used for connection: the cable installation point shall comply with the regulation 4.2.1 of SY5190-91, and the insulation degree shall meet the requirements of 3.5 of SY/T5191~-93. The power supply shall meet the requirements of 4.2.2 of SY5190-91. 3.4.3 Electric heaters, ovens and dehumidifiers shall expand their load size, and correctly select power supply lines, switches, circuit breakers and hysteresis protectors. 3.4.4 Only the metal conductor is made, and the grounding line is driven into the ground 0.51.0m underground, and the grounding point between the grounding line and the grounding point of the instrument is + logging operation
4.1 Aluminum pair integration
4.1, 1 Drilling and pipes are neatly arranged, and then the main quantity should pay attention to the prevention of collision, pressure and fall. 12 Drilling tools, pipes! On the platform, the staff seat is 15m away from the ramp of the drilling platform. 1.1.3 The drilling staff should wear a safety helmet when drilling. When entering the platform, they should stand outside the rotation surface. 4.14 When collecting and discharging data, the logging staff should not approach the pump pulley and the safety valve discharge side of the drilling platform. 4.2 Old sales card
4.2, after the work is completed, double guards, ladders, handrails, and lighting facilities should be installed. The upper and lower working platforms should have anti-slip facilities. 4.2.2 Labor and washing, the sanding site should be clean and convenient for operation. 4.2.3 When using the sample drying oven to dry the chips, first check whether the outer cable of the sample drying oven is grounded. According to the regulations of $Y014--9+4.7:
4.3 Core recording
3,! If the core is out of the core. The distance between the core and the drill is not more than 0.2m, the same light should be used to maintain strong contact. It is forbidden to directly contact the core with the palm
4.3.2 When the core is knocked by the head, the head should be prevented from hitting the core barrel. 4.3.3 When the core is selected, the lifting personnel shall not stand in front of the mountain. 4.4 Fluorescent lamp
4.4.1 The wavelength of fluorescent lamp is 365mm, and the total power is not less than 25W. 4.1.2 The connection of carbon light shell should be reliable. It can be used after strict inspection and confirmation of safety. 4.4.3 Keep the fluorescent observation room full of wind lamps. The residual liquid after the test should be centrally processed. 4.5 Before starting the gas detector
+5,1, the electrical and gas circuit components of each part should be checked to confirm that the installation is correct, there is no power failure, and there is no damage. When turning on the power of each part, the main power supply should be turned on first, and then the sub-power supply should be turned on. 4.5.2 The hydrogen generator should be exhausted smoothly, without any leakage. 4.5.3 When starting the air compressor, pay attention to the direction of rotation. When the wrong rotation direction is found, the machine should be stopped immediately for rectification. 4.5.4 When high content of hydrogen sulfide is found during the detection, the relevant personnel should be notified in time to make protective preparations according to the provisions of 3.5.6 of SY5225--1994.
SY 6348-1998
4.5.5 When conducting ignition test on site, the ignition pool point should be in the downwind direction, 30m away from the wellhead. 4.5.6 Personnel working in the instrument room should not wear leather shoes with iron nails, and protective clothing should meet the requirements of static electricity. 4.5.7 It is forbidden to ignite on site and in the instrument room. 4.6T Project Recording#
4.6.1 The person in charge of the geological logging team should submit geological forecasts for anti-blowout, anti-stuck, land leakage and anti-deflection well sections to the on-site construction unit before logging. 4.6.2 When going to the circulation tank or mud tank or pool, you should prevent slipping and falling. When checking, maintaining and replacing various sensors, you should comply with the provisions of Chapter 4 of SY/T6122941f. 4.6.3
4.6.4 When drilling fluid performance and engineering monitoring parameters are abnormal, relevant personnel should be informed in time to take measures. 4.7 Special operations
4.7.1 When a blowout occurs, all logging electricity should be turned off in time according to the unified command of the drilling and other work units, and fire sources should be eliminated, and the data should be properly kept.
4.7.2 In case of special operations such as mid-line testing, soaking oil to release the card, explosive cutting, and salvage, the relevant safety regulations and emergency measures of the drilling and other work units should be strictly followed.
4,7.3 When logging in new exploration areas, new formations and areas known to contain hydrogen sulfide, nitrogen sulfide monitoring should be carried out. And equipped with corresponding gas masks 4.7.4 When hanging casing on the platform, the logging personnel who check the number of the casing should stay 15m away from the ramp of the drilling platform gate 4.7.5 When cementing, the logging personnel should enter the high-voltage warning area. 4.7.6 There should be reliable safety measures for live maintenance of instruments. At least 2 people should be present to monitor during operation. 5 Use and management of chemical reagents
5.1 The storage and custody of chemical reagents and gas standards should comply with the provisions of 5.1, 5.2, and 5.3 in 5Y6014-94. 5.2 Before using an alcohol lamp! Check whether the lamp body and wick are burnt out: When adding alcohol to the alcohol lamp, the liquid level should not exceed 2/3 of the lamp. After adding, wipe off the alcohol outside the lamp. After using, cover the lamp cover: 5.3 The drip test should comply with the provisions of SY6014--94 13.3, 4.2, and 2.6. 54 Non-test flammable and explosive items should not be stored in the geological duty room