HG/T 20701.2-2000 The relationship between the engineering design stage of containers and heat exchangers and various disciplines

Basic Information

Standard ID: HG/T 20701.2-2000

Standard Name: The relationship between the engineering design stage of containers and heat exchangers and various disciplines

Chinese Name: 容器、换热器专业工程设计阶段与各专业的关系

Standard category:Chemical industry standards (HG)

state:in force

Date of Release2000-11-22

Date of Implementation:2001-06-01

standard classification number

Standard ICS number:71.010

Standard Classification Number:Engineering Construction>>Raw Materials Industry, Communications, Broadcasting Engineering>>P72 Petrochemical, Chemical Engineering

associated standards

Publication information

other information

Introduction to standards:

HG/T 20701.2-2000 Container, heat exchanger professional engineering design stage and the relationship between each discipline HG/T20701.2-2000 standard download decompression password: www.bzxz.net

Some standard content:

Relationship between container and heat exchanger specialty and various specialties in engineering design stage HG/T 20701.2 -2000
Subject content and scope of application
This standard specifies the relationship between container and heat exchanger specialty and various specialties in engineering design stage (specialty interface and mutual relationship), and is applicable to design management in engineering design stage. 2 Relationship with design manager
The design manager shall provide this specialty with the commencement report and its attachments, including: basic data of engineering design;wwW.bzxz.Net
engineering design schedule:
quality plan;
engineering design regulations approved by the user (with user's opinions and requirements); equipment list;
approved preliminary design documents or contracts and their contract attachments. This specialty shall provide the following design documents to the design manager: engineering design regulations;
general technical regulations, engineering standards and procedure manuals for various types of equipment; equipment/material (inquiry, order) purchase order or technical specification; drawings and materials delivery list for each publication;
technical risk memorandum.
Data table.
3 Relationship with Chemical Process Major
Chemical Process Major needs to provide this major with: process flow chart and process specification;
Material balance sheet;
Container and heat exchanger data sheet (including container and heat exchanger condition diagram): connection and interface position of temperature, pressure and analytical instrument (including interface position diagram). This major needs to provide Chemical Process Major with various versions of container and heat exchanger equipment diagram (equipment engineering diagram) and/or data sheet. 4 Relationship with Process System Major
The process system major needs to provide this major with: 1 Summary table of container and heat exchanger connection.
4.0.2 This major needs to provide various versions of container and heat exchanger equipment diagram (equipment engineering diagram) and data sheet to the process system major.
5 Relationship with Instrument (Automatic Control) Major
5.0.1. The instrument major needs to provide this major with connection diagrams of control point interfaces such as pressure, temperature and liquid level. 5.0.2 This major needs to provide the instrumentation major with the equipment schematics (equipment engineering drawings) and data sheets of the containers and heat exchangers related to the instrumentation major.
Relationship with the materials major
The materials major needs to provide the following design documents to this major and participate in the following work of this major: 1 Engineering material selection regulations (construction material memorandum); 5
2 Engineering standards and procedure specifications for materials and welding of containers and heat exchangers compiled by the materials major: 3
Participate in the preparation or review of the materials part of the engineering design regulations and general technical regulations for various types of equipment: Participate in the agenda of the equipment manufacturer coordination meeting (VCM) responsible for this major: 4
Review the equipment schematics (equipment engineering drawings) of containers and heat exchangers drawn by this major and the drawings provided by the manufacturer (commercial) 5
The contents related to materials and welding in the documents and put forward opinions. 6.0.2 This major needs to provide the materials major with: engineering design regulations and general technical regulations and procedure instructions for related equipment; 1
Equipment schematics (equipment engineering drawings) and data sheets of various versions of containers and heat exchangers. 7 Relationship with the device layout major
The device layout major needs to provide this major with equipment layout drawings of various versions. 7.0.1
7.0.2 This major needs to provide the device layout major with equipment schematics (equipment engineering drawings) of various versions. 8 Relationship with the piping major
The piping major needs to provide this major with pipeline plane design drawings (or pipe opening orientation drawings and support orientation and elevation). 8.0.1
8.0.2 This major needs to provide the piping major with equipment schematics (equipment engineering drawings) of various versions of containers and heat exchangers. 9 Relationship with Pipeline Machinery Major
Pipeline Machinery Major needs to provide this major with: Local loads acting on the pipe connections of containers and heat exchangers: 1
Position of the fixed support of horizontal containers and/or horizontal heat exchangers: 3 The elevation, orientation, type, load or reinforcement plate and support member summary table of the pipe racks and other supporting components to be pre-welded on the containers and heat exchangers.
9.0.2 This major needs to provide the Pipeline Machinery Major with various versions of container and heat exchanger equipment schematics (equipment engineering drawings) and return the pipe connection load verification results.
Relationship with Civil Structure Major
10.0.1 Civil Structure Major needs to provide this major with the elevation, orientation and type of the supporting components of the equipment operating platform and ladder.
10.0.2 This major needs to provide various versions of container and heat exchanger equipment schematics (equipment engineering drawings) to the Civil Structure Major. 11 Relationship with Pipeline Materials Major
Pipeline Materials Major shall provide this major with: Equipment and Pipeline Insulation (Cold Insulation) Regulations:
Equipment and Pipeline Painting Regulations;
Pipeline Material Grade Table and Pipeline Wall Thickness Table:4
Pipeline Connection Standard Regulations and Special Connection Structure Standard Drawings. This major shall provide the Pipeline Materials Major with various versions of equipment schematics (equipment engineering drawings) for containers and heat exchangers. 12 Relationship with Heat Exchanger Analysis Major
12.0.1 The Heat Exchanger Analysis Major shall provide the Heat Exchanger Major with a complete data sheet for each heat exchanger, including equipment structure type, design parameters (operating medium, flow, pressure, temperature), heat exchange tube specifications, quantity, heat transfer area, baffle type, quantity, spacing, cutting area, shell, and average wall temperature of heat exchange tubes. 12.0.2 This major shall provide the Heat Exchanger Analysis Major with various versions of equipment schematics (equipment engineering drawings) for each heat exchanger. 13
Relationship with the purchasing department
13.0.1 The purchasing department needs to provide the following information and documents to this specialty1
The quotation technical documents of the manufacturer (commercial company);
The technical information (capabilities, performance), product samples and product catalogues of the relevant manufacturers (commercial companies);2
List of qualified manufacturers (commercial companies):
The list of manufacturers (commercial companies) participating in VCM agreed upon; Notice of convening VCM;
Technical attachments to the order contract:
The ACF drawings and materials (including data sheets) and data sending sheets of the manufacturer (commercial company) for review (unless otherwise specified); CF drawings and technical materials of the manufacturer (commercial company): Manufacturer (commercial company) Product manufacturing and inspection data report and certificate: This major needs to provide the following information and documents to the purchasing department: Subcontracting suggestions for equipment purchased for engineering projects; Equipment/material (inquiry, ordering) purchase requisition/technical specification and related technical documents; Proposal for (selection of) inquiry manufacturers; Technical evaluation opinions on manufacturers' quotations and suggestions on selecting ordering manufacturers: Procurement technical risk memorandum (when necessary); Detailed agenda of VCM meeting (technical part): VCM meeting minutes (technical part) and modified or updated documents and data sheets: Summary opinions on reviewing the manufacturer's ACF and CF drawings and data sheets (unless otherwise specified); Memorandum involving procurement during the design process.