This specification applies to the construction and acceptance of new subway projects. Where there are no regulations, they shall be implemented in accordance with the relevant mandatory standards currently in force in the country. GB 50299-1999 Specification for Construction and Acceptance of Subway Projects GB50299-1999 Standard download decompression password: www.bzxz.net
Some standard content:
Engineering Construction Standard Full-text Information System National Standard of the People's Republic of China GB502991999 Code for construction and acceptance of metro engineering 1999—06—10 1999—10—01 State Administration of Quality and Technical Supervision Ministry of Construction of the People's Republic of China Engineering Construction Standard Full-text Information System Jointly Issued Engineering Construction Standard Full-text Information System National Standard of the People's Republic of China Code for construction and acceptance of metro engineering engineeringGB50299—1999 Editing department: Beijing Municipal Commission of Urban and Rural ConstructionApproving department: Ministry of Construction of the People's Republic of ChinaEffective date: October 1, 1999 1999 Beijing Engineering Construction Standard Full-text Information System Engineering Construction Standard Full-text Information System Notice on the Release of the National Standard "Specifications for Construction and Acceptance of Subway Engineering" Jianbiao [1999] No. 147 In accordance with the requirements of the State Planning Commission's "1987 Engineering Construction Standard Formulation and Revision Plan" (Appendix 8 to Document No. Jizong [198672630]), the "Specifications for Construction and Acceptance of Subway Engineering" jointly formulated by the Beijing Municipal Commission of Urban and Rural Construction and relevant departments has been reviewed and approved as a mandatory national standard by the relevant departments, with the number GB50299—1999, and will be implemented on October 1, 1999. This specification is managed by Beijing Municipal Commission of Urban and Rural Construction, Beijing Urban Construction Group Co., Ltd. is responsible for the specific interpretation work, and the Standard and Quota Research Institute of the Ministry of Construction organizes China Planning Press to publish and distribute it. Ministry of Construction of the People's Republic of China June 10, 1999 Engineering Construction Standard Full Text Information System Engineering Construction Standard Full Text Information System This specification is compiled by the Beijing Urban Construction Group Co., Ltd. and relevant units in accordance with the requirements of the State Planning Commission's Document No. 2630 [1986]. During the compilation process, in accordance with the relevant principles and policies of national capital construction, on the basis of summarizing the practical experience of my country's subway engineering construction, fully considering my country's existing construction technology level and future development direction, after investigation and testing, appropriately absorbing and drawing on some foreign standards, striving to achieve advanced technology, economic rationality, safety and applicability, and ensure quality. At each stage of the preparation, we have solicited opinions from relevant units across the country through forums and letter reviews, and held professional meetings. After repeated revisions and supplements, our committee and relevant departments have reviewed and finalized the draft. According to the construction technology, methods and professions of subway projects, a total of 19 chapters and 3 appendices have been compiled, including: Chapter 1 is the general provisions, Chapters 2 to 13 are civil engineering projects, and Chapters 14 to 19 are mechanical and electrical equipment installation projects. This specification is a newly formulated national standard, covering a wide range of fields and many professions. In order to improve the quality of the specification, please pay attention to accumulating information and summarizing experience during the implementation process. If any modifications and supplements are found, please promptly notify the "Subway Project Construction and Acceptance Specification" Management Group of Beijing Urban Construction Group Co., Ltd. (Address: No. 62, Xueyuan South Road, Haidian District, Beijing, Postal Code: 100081) for reference when making modifications. The editorial unit, participating units and main drafters of this specification are: Editor-in-chief: Beijing Urban Construction Group Co., Ltd. Participating units: Shanghai Tunnel Engineering Co., Ltd. Shanghai Metro Corporation Beijing Metro Corporation Railway Science Research Institute Engineering Construction Standards Full-text Information System Engineering Construction Standards Full-text Information System Liu Guoqi Main drafters: Ren Jinhao Fu Deming Hu Minglin Huang Guowei Yang Xuezhong Li Shanguo Liu Qichen|| tt||Engineering Construction Standards Full-text Information System Wang Yixin Xue Zehui Shao Genda Wang Yulin Wu Bingru Wang Jinzhong Yang Woqing Zhang Jinghai Gao Yushan Engineering Construction Standards Full-text Information System 2 Well Point Dewatering -General Provisions· Light Well Point Jet Well Point Tube Well Point Sand (Gravel) Seepage Well Point Dewatering Management Foundation Pit Support Piles General Regulations Impact pile driving Vibration pile driving Static pile driving Bored pile 666066660666660666600606000666666666666606606606660e(11) ...... Spiral drilling machine drilling Mud wall drilling: Reinforcement cage processing and hoisting... Concrete pouring Foundation pit support Soil wall between piles Horizontal support Seven-layer anchor support|| tt||Engineering Construction Standards Full-text Information System (15) Engineering Construction Standards Full-text Information System Underground Continuous Wall General Provisions Guide Wall Construction Mud Preparation and Management Trenching Construction Reinforcement Cage Fabrication and Installation Concrete Pouring Wall Joint Treatment 4.8 Waterproof Construction Project Acceptance Tunnel Open Cut Construction General Provisions Pipeline Removal, Relocation and Suspension 5.3 Foundation Pit Temporary Bridge Excavation and backfilling of foundation pit Excavation of foundation pit· Backfilling of foundation pit 5.5 Processing and installation of steel bars Reinforcement processing Reinforcement binding: Formwork support Concrete pouring External waterproofing of structure Project acceptance Construction of tunnel cover and reverse construction method General provisions Retaining wall and supporting column Excavation of earth Tunnel structure Engineering construction standard full text information system (18) (22)| |tt||(23) (25) (26) ·(33) (35) (37) ·(38) (41) (41) (42) (42) Engineering Construction Standard Full-text Information System 7 Tunnel Spray Anchorage and Dark Excavation Construction General Provisions 7.2 Vertical Shaft .····.·. 7.3 Advance Support and Reinforcement of Strata Advance Guide Pipe and Pipe Shed Grouting reinforcement Smooth surface and pre-splitting blasting Tunnel excavation Construction method Excavation· 7.6 Initial support Processing and erection of steel grid and steel mesh Sprayed concrete Rock anchor· ·.·Waterproof layer laying and secondary lining Waterproof layer laying Secondary lining 7.8 Monitoring and measurement Transportation in the tunnel Temporary facilities for wind, water and electricity and ventilation and dust prevention (I) Power supply and lighting||tt| |Air and water supply: Ventilation, dust prevention and protection against harmful gases Project acceptance 8 Tunnel shield tunneling construction General provisions Shield working shaft 8.3 Shield entering and exiting the working shaft 8.4 Shield tunneling Engineering construction standard full text information system ........ 0.00000....00 (44) (44) (44) (45) (45) ..(47) : (49) + (49) (50) (52) (54) ·(55)||tt| |(55) (56) (56) (58) (59) (64) (64) (6 5) (65) Engineering Construction Standard Full Text Information System 8.5 Gas Shield 8.6 Reinforced Concrete Segment Assembly Back Grouting 60000000000000006 Monitoring and Measurement Transportation, Ventilation and Temporary Facilities in the Tunnel Reinforced Concrete Segment Production Work Project acceptance Waterproofing of tunnel structure General provisions Waterproof concrete Rolled waterproof layer Coating waterproof layer Waterproofing of special parts Project acceptance General provisions Embankment filling Project acceptance Reinforced concrete viaduct General provisions Bridge foundation excavation:| |tt||Cast-in-place reinforced concrete structure Rebar binding Formwork support Concrete pouring Engineering construction standard full-text information system ...... (67) (67) (68) (68) (69) (70) (70)| |tt||·(71) (73) (73) (73) (78) (79) (80)|| tt||: (81) tt||Full text information of engineering construction standards 11.4 Prefabricated reinforced concrete components (I) Component production· Component transportation and storage Component installation Prestressed concrete structure Prestressed tendon processing and bundling Prestressing Pre-tensioning method... Post-tensioning method· Grouting of duct||tt ||Bridge deck system Project acceptance Building decoration General provisions Station hall (platform) floor Station hall (platform) steel pipe column and reinforced concrete column finish 12.4 Platform cable wall Stainless steel railings and stair handrails Project acceptance Integral track bed General provisions Equipment preparation pile Placement and transportation Benchmark setting Track erection and installation of sleepers or short rail (switch) sleepersTrack position adjustment Integral roadbed Prefabricated concrete componentsManufacture Project acceptance Engineering construction standard full text information system 中tt中EeEEEEEE心心 (93) (94) (95)| |tt||(95) (95) (96) (99) (103) (105) (106) (107) (113) (115) Engineering Construction Standard Full-text Information System Escalator .····| |tt||General provisions Metal structure frame Stairway system Drive main engine Handrail device Electrical device Safety protection device Adjustment test Project acceptance General provisions Optical and cable lines Equipment installation Equipment wiring Grounding device Adjustment test Project acceptance General provisions Cable laying Outdoor equipment Fixed signal machine Electric switch machine Track circuit Box and box installation· Indoor equipment On-board equipment Adjustment test Engineering construction standard full text information system||tt| |.(121) (122) (125) (126) (128) (133) (136) (146) (148) (150) ·(151) (152) (153) Engineering Construction Standard Full Text Information System (I) Single-unit commissioning System commissioning Project acceptance General provisions Substation Traction power grid (I) Contact rail Central industry (I) Overhead contact network 17.4 Wiring and power electronic control equipment Cable line and grounding device Cable line Grounding device Monitoring system Adjustment test Traction power supply system Monitoring system Project acceptance Ventilation and air conditioning General provisions Ventilation components Duct and component installation Equipment installation Adjustment test Project acceptance|| tt||General Provisions Processing and Installation of Water Supply Mains Engineering Construction Standards Full-text Information System ++++++++..+++. Electricity Electricity Electricity Electricity Electricity ....... (153) (156) (159) (159) (160)| |tt||(160) (162) (167) (169) (170) (170) (1 72) .··(177) (183) (186) (187) ...(190) (190) (67) (67) (68) (68) (69) (70) (70) ·(71) (73) (73) (73)| tt||(78) (79) (80) : (81) Department of Literature and Information 11.4 Prefabricated reinforced concrete components (I) Component production· Component transportation and storage Component installation Prestressed concrete structure Prestressed tendon processing and bundling Prestressing Prestressing method... Post-tensioning method· Grouting of duct Bridge deck system Project acceptance Building decoration General provisions Station hall (platform) floor Station hall (platform) steel pipe column and reinforced concrete column finish12.4 Platform cable wall Stainless steel railings and stair handrails Project acceptance Integral track bed track General provisions Material preparation, stacking and transportation Benchmark setting Track erection and installation of sleepers or short rails (turnouts) Track position adjustment Integral track bed Concrete prefabricated component production Project acceptance Engineering construction standard full text information system 中tt中EeEEEEEE心心 (93) (94) (95) (95) (95) (96 ) (99) (103) (105) (106) (107) (113) (115) Engineering Construction Standard Full-text Information System Automatic escalator .···· General provisions Metal structure frame Stairway system Drive host Handrail device Electrical device Safety protection device Adjustment test Engineering acceptance General provisions Light, Cable lines Equipment installation Equipment wiring Grounding device Adjustment test Project acceptance General provisions Cable laying Outdoor equipment Fixed signal machine Electric switch machine Track circuit Box and box installation· Indoor equipment On-board equipment Adjustment test Engineering construction standard full text information system .(121) (122) (125) (126) (128) (133) (136) (146) (148) (150) ·(151) (152) (153) Engineering Construction Standard Full Text Information System (I) Single Unit Commissioning System Commissioning Project Acceptance General Provisions Substation Traction Network (I) Contact Rail Central Industry (I) Overhead Contact Network 17.4 Wiring and Power Electronic Control Equipment Preparation Cable lines and grounding devices Cable lines Grounding devices Monitoring systems Adjustment tests Traction power supply systems Monitoring systems Project acceptance Ventilation and air conditioning General provisions Ventilation components Duct and component installation Equipment installation Adjustment tests Project acceptance General provisions Processing and installation of water mains Engineering construction standard full text information system ++++++++..+++.|| tt | | |tt | (67) (67) (68) (68) (69) (70) (70) ·(71) (73) (73) (73)| tt||(78) (79) (80) : (81) Department of Literature and Information 11.4 Prefabricated reinforced concrete components (I) Component production· Component transportation and storage Component installation Prestressed concrete structure Prestressed tendon processing and bundling Prestressing Prestressing method... Post-tensioning method· Grouting of duct Bridge deck system Project acceptance Building decoration General provisions Station hall (platform) floor Station hall (platform) steel pipe column and reinforced concrete column finish12.4 Platform cable wall Stainless steel railings and stair handrails Project acceptance Integral track bed track General provisions Material preparation, stacking and transportation Benchmark setting Track erection and installation of sleepers or short rails (turnouts) Track position adjustment Integral track bed Concrete prefabricated component production Project acceptance Engineering construction standard full text information system 中tt中EeEEEEEE心心Www.bzxZ.net (93) (94) (95) (95) (95) (96 ) (99) (103) (105) (106) (107) (113) (115) Engineering Construction Standard Full-text Information System Automatic escalator .···· General provisions Metal structure frame Stairway system Drive host Handrail device Electrical device Safety protection device Adjustment test Engineering acceptance General provisions Light, Cable lines Equipment installation Equipment wiring Grounding device Adjustment test Project acceptance General provisions Cable laying Outdoor equipment Fixed signal machine Electric switch machine Track circuit Box and box installation· Indoor equipment On-board equipment Adjustment test Engineering construction standard full text information system .(121) (122) (125) (126) (128) (133) (136) (146) (148) (150) ·(151) (152) (153) Engineering Construction Standard Full Text Information System (I) Single Unit Commissioning System Commissioning Project Acceptance General Provisions Substation Traction Network (I) Contact Rail Central Industry (I) Overhead Contact Network 17.4 Wiring and Power Electronic Control Equipment Preparation Cable lines and grounding devices Cable lines Grounding devices Monitoring systems Adjustment tests Traction power supply systems Monitoring systems Project acceptance Ventilation and air conditioning General provisions Ventilation components Duct and component installation Equipment installation Adjustment tests Project acceptance General provisions Processing and installation of water mains Engineering construction standard full text information system ++++++++..+++.|| tt | | |tt |4 Wiring and power electronic control equipment Cable lines and grounding devices Cable lines Grounding devices Monitoring system Adjustment test Traction power supply system Monitoring system Project acceptance Ventilation and air conditioning General provisions Ventilation components Duct and component installation Equipment installation Adjustment test Project acceptance General provisions Processing and installation of water main pipes Engineering construction standard full text information system ++++++++..++ +. electric electric electric electric electric electric electric electric electric .... (153) (156) (159) (159) (160) (160) (162) (16 7) (169) (170) (170) (172) .··(17 7) (183) (186) (187) …(190) (190)4 Wiring and power electronic control equipment Cable lines and grounding devices Cable lines Grounding devices Monitoring system Adjustment test Traction power supply system Monitoring system Project acceptance Ventilation and air conditioning General provisions Ventilation components Duct and component installation Equipment installation Adjustment test Project acceptance General provisions Processing and installation of water main pipes Engineering construction standard full text information system ++++++++..++ +. electric electric electric electric electric electric electric electric electric .... (153) (156) (159) (159) (160) (160) (162) (16 7) (169) (170) (170) (172) .··(17 7) (183) (186) (187) …(190) (190) Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.