Some standard content:
ICS,17-D42-10
National Standard of the People's Republic of China
GB/T80691998
Functionalgauges
Released on 1998-08-28
1999-07 -01 Implementation
Released by the National Technical and Water Supervision Bureau
CB/T8069
This standard has special adjustment limits for the maximum practical requirements for you, the industry, etc. The new thing is the original core: cross-ordering is done according to the ordering regulations. The current standard of the year is the international standard. The world standard is based on the international labeling unit proposed by my country's International Organization for Standardization
This standard stipulates! There are many application scopes, definitions, inspection methods, tolerances and related technologies of functional base cutting. In the appendix, the types of adjustment standards, examples of working parts, and the appearance and working parts of the basic shaping are given. Inch calculation formula and indication. This standard contains appendices with sufficient information on pump A, appendix B, appendix C and appendix D. Starting from the 1st day of the year in 1999, it will be replaced by GB8969 every week? . This standard is under the jurisdiction of the National Standardization Technical Committee on Shapes and Positions of the Ministry of Science and Technology of the Republic of China. The person who gave birth to the bride: Jiao Er, Suo Shi, Zheng Busy, and Yin Xingsen. 1 gage
National Standard of the People's Republic of China
Functional Gauges
Fuietiotlul gauges
And Yungounan spelled egg F/T 8069--#995
APRKESSST
This standard can be applied to the test requirements and or benchmark requirements for the maximum implementation requirements. The performance ratio should be kept high and the requirements of F/1182GR/4249 and A/6571 should be used for the measured elements and (salt formation) to prohibit their performance. In the market, they are both real and non-optical and can produce corresponding worlds. 2 Reference Standards
The following other provisions are incorporated into this standard by reference. When this Lepico version is published, all international standard statements shall be used as amended. Endors of this standard should consider the possibility of using the latest version of the G15G status code | /42191906 Gongcui original 5.
GR/T1H comes - [S8 shape and position tolerance control and measurement regulations CR/T13314-159! Shape and thermal position tolerance generation low tolerance 3 definition
In addition to adopting the definitions in GB/E-182GB/T44JGB/T16671GB/T18515, this document adopts the following provisions 3. Functional conditions | At that time, it was determined that its "actual wheel source is Chaoshanbian Road's Great Compensation Actual Effect" or the report of the dyeing world's meeting form Tongti. The four functions of Qi: the overall type, the red containing type .Input the human type to set the movable type. The actual functions of various types are shown in the appendix of A). The back-entry type functional station of the light source generation has a new price-level plug-in type functional disk period: 3.2 The working dimension of the functional world
The function also includes the hot working parts; The Ministry of Risk Management positions, 3.2.1 Ministry of Inspection and Control
Ministry of Finance and Economics, Ministry of Finance and Economics, Ministry of Finance and Economics The basic requirement of damage simulation is to find the joint boundary or accuracy, and to accurately report the position. No. 3.2.3 Xiangtang | The State Administration of Quality and Technical Supervision on the 195th: 328 approved the implementation of 999-g0
CB:TB0691998
Appendix, 3.3 Functional Specification Notes
When the maximum number of entities is required to apply the basic sliding requirements of the workpiece, the maximum entity boundary of the requirement is reduced to the maximum entity boundary! When the established standard for the establishment of a certain room is not required to open the "two station standards" of the entity, it is based on the actual location of the actual site. Tt | ,, the plan must be completed to achieve the common welfare of infants - the tolerance of the actual inspection part
- the tolerance of the basic inspection part - the function of the whole part The following dimensional tolerances can be stipulated in advance according to the allowable damage type of the parts: - The civil tolerance of the normal parts W: - The allowable wear certificate of the functional parts and the guide parts 3 is analyzed one by one. The minimum time of the independent movement is equal to the direction of the department.
Use energy to observe and control the direction or position of the medicine in some parts of the body. The kinetic energy of the medicine in certain parts is determined by the movement or position of the medicine. One-dimensional type or The kinetic energy required for movement is determined by the direction or position of the fixed part of the guide part, the normal shape of the gear or the movable kinetic energy, the step-shaped insertability of the guide part, the return degree or the original difference of the normal safety position of the symmetrical seat||tt ||-One penalty can be used to help the interior and exterior inspection, and the original size can be successfully inspected into the interior and exterior requirements. Limit ruler Ddm - the basic dimension of the function single positioning part for some internal and external requirements D | The limit size t
of the grinding point of the central and external key points that can be guided out of the guide is small
The kinetic energy product crosses the center
Dw one|| tt||5 General Provisions
5.1 When the maximum meeting requirement is used for the pre-test of the fee-for-service rule, the actual control of the inspection fee system is the longest physical effect of the section. Stepping into the boundary,
5.2 is selected as the special tolerance for the wave-second factor, and the performance of the test part is to be tested by the human body. |tt||5.3 When you want to tie the maximum physical requirement of inflammation = inverse, first check the eligibility of the monitor, and then use the power to check the integration. 5.4 When testing the workability, the author should use a specific energy base or tester that is manufactured or has less wear and tear, or the inspector should use the same type as the one in the manual. If there is any dispute with the final result of the test of different kinetic energy rules using the same formula that complies with this standard, it shall be determined by any of them. ·Function division 2
inspection grid, that is, the workpiece is considered to be included,
E inspection method
6.1 Yipelin
GB 8069199F
The same as next month The functions of the regular and empty test standard elements in sequence are often the same as the motivating point of the happy direction or fixed reading of the ten and measured elements or
6.2 Unidentified
To formulate the necessary fixed or positioning margins and the basic requirements for the shape, price, temperature difference or time within the entire continent,
inspect San'an ding industrial inspection in turn; the joint inspection is mainly used for final pick-up Inspection, the size, shape, direction and position of the working part of the 7 function gauge 7.1 Inspection part | Measure the shape and direction of the person's physical visit to the boundary.
7.2 Positioning parts
If the basic requirement is that the person needs to use it, determine the size, shape, and direction of the treatment. The size, shape, direction, and location of the room should be determined by the exact boundary to be connected (the size, shape, direction, and location of the boundary or boundary) are the core elements to be shared, but the largest body must be used. The standard must be small and fast, and the profit and loss of the product shall be determined by the actual ability of the medicine, and the empty and real parts must not be moved relative to the actual basic consumption requirements. The basic principles of wheel separation are to establish the size and shape of the parts. The postage position change and the actual oxygen flash point must be accumulated over time. 7.3 The non-return position
of the guide position should be consistent with the production position. Check the shape of the whole part or the position, except for the square and the division. The daily inspection part also serves as the guide part, and the inspection part of the guide part belongs to the positioning department. , the dimensional design of the step I asked the Ministry of Education to determine. The machine should be standardized. 8 Function heavy gauge tolerances
8.1 Dimensional tolerances
Should
be tested, the external factors should be compared with the function base of the back small boarding belt of the integrated position, such as the fixed position, +
+NEYwren?
82 positioning position A small difference in a foot is enough
GD/T 8069199E
Examination is an external requirement
Day.1.2.1st inspection drawing, its standard inside, outside the signature rate and its kinetic energy of the pull part with the small tolerance of the position as shown in Figure 2! 11 its basic difference is learning! .
p) **
position case
hi specified part of this outside the paragraph
FA/T 8C69-1998
81.2.? Total can be used for inspection: the standard can be used as a key case, the function section number of parts type as much as possible will be produced with the inspection department book Figure 1>.
8.1.3 Le help the ruler for the whole tolerance band
13.1 insert the type of less thinking step Wu guide forbidden ruler tolerance book position calculation as shown in 3 small. 5.:
8.1.3.2 The position of the ten tolerance bands of the non-step guide of the primary energy specification is shown in Figure 1. mn
B.2 Tolerance letter
The guide position is an internal system
8.2.1 Functional calorimetry The differences in the working parts are listed in Table 1: Figure
h guide is still the price
Luhe Gong
3[6--25
·25-J3
:12--15c
>169--35G
-259--9.x.
->;66--63c
>630--[ 006 1
+ +I tru--I too
1 609--2 601
Welcome to the market
CB/T8069-1398
Sand can the world's various industrial installations of the size of the public certificate, the shape of the public revolution can be damaged and the transfer of the teaching work of the institute
5 direction
: the public system to support the main body of the size and the sum of the position difference, that is, the institute! 8.2.2 Function defect standard inspection parts of the base rate deviation number is listed in Table 2, Table 2 good environment test parts of the technical performance difference effect false
5 commercial
(group visual measurement)
The standard class
training tolerance T,
15-·25
25 -. 40
: 40-- 6.3
: 63--[0G
.>:00--[6G
:>,F0--25r
:5250-456
Youkishi
a?&surface
·ten hearts to color
two below
people under the clothes surface and
heart to ticket
three times clothes surface
·middle limit
a ten heart evil belt
·a flat
a skin heart variation
two flat Yuan three 6
a rotten center to teach
careful to the master and
people flow through the heart
beautiful things are safe
body ordinary people
according to the patient's understanding of some body! People
patient type
war type education type level type dynamic type effect composition activity type or combination type management momentum combination learning or made of state activity 2
Shenzhen Taiwan Public?
+635--1 t3C
no right end
one
CB/13069-:998
Xiaoping Agricultural Bank
careful two tickets
one ten heart
three down and
·one Chengzu
center collection center test element
one Chengxin male parent
center development
full.4 heart approval
person sitting staff
insertion type closed Model
body: medical proof
monitor this room
suitable for benefit
activity type activity combination research
note: basic British model example implementation ten results ("quality heart", Sr
day.2.3 performance as a standard to the time tolerance using content requirements 3
day 2.4: function certificate 1 work room can be determined or determined by the general principle of the subject of the sole production. If necessary and possible according to the current two parts of the directional determination B.2.5 The linear energy of the gauge is taken as the level of the unmarked public line, and the unmarked shape difference is generally accepted as level 11. 2.6 The original number of this standard is suitable for marking the measurement item, that is, the temperature is the center, and the force is 8..? .1 The technical requirements of the functional gauge are as follows: 5.1 The technical requirements of the functional gauge are as follows: 3.1 The performance of each 1 metallurgical table and 4 points are made, state, black old, I mark, pattern is a good external 1. Inquiry on the production table: There should be no rust and cracks:
9.2 The teaching of new energy parts, the connection is solid, and the use is not verified. 93 The material of the plan can make the quality of the material of the bucket light. 9.4 The hardness of the steel market can be reduced by 5HVeCHRC9.5 The dynamic pipe should be treated after the production,
6 The function of the "production table surface precision value should be large (except for the loss of parts). 97 The energy industry should have the relevant signs of the number change. 9.8 The serial number of the energy table should be long on the original plate,
) Manufacturing: Name and mark;
Brush certification.
910 and above should be accompanied by training and certification,
1 integral type (see [3A[>
A2 combination type (see Figure 42
RT 8059-1998
Appendix A
shown in the attached requirements)
functional type
insert type A
4 movable type A4)
5T869--1998
Figure A4 in the delivery condition
GR/T 8069 998
(Appendix of prompts)
Energy gauge for each working part
"Figure annotation of parts & examples of energy gauge for regular working parts are shown in Figure 2, AE
1 Strict network standard
Compared to Deng position
Interval energy cavity design
Qualitative type
Production degree expansion design5250-456
Yukishi
a?&surface
·ten hearts to color
two below
people under the clothes surface and
heart to ticket
three times the clothes surface
·middle limit
a ten heart evil belt
·a flat
a skin heart variation
two flat Yuan three 6
a rotten center to teach
careful to the master and
people flow through the heart
beautiful things are safe
body ordinary people
according to the patient's understanding of some body! People
patient type
war type education type level type dynamic type effect composition activity type or combination type management momentum combination learning or made of state activity 2
Shenzhen Taiwan Public?
+635--1 t3C
no right end
one
CB/13069-:998
Xiaoping Agricultural Bank
careful two tickets
one ten heart
three down and
·one Chengzu
center collection center test element
one Chengxin male parent
center development
full.4 heart approval
person sitting staff
insertion type closed Model
body: medical proof
monitor this room
suitable for benefit
activity type activity combination research
note: basic British model example implementation ten results ("quality heart", Sr
day.2.3 performance as a standard to the time tolerance using content requirements 3
day 2.4: function certificate 1 work room can be determined or determined by the general principle of the subject of the sole production. If necessary and possible according to the current two parts of the directional determination B.2.5 The linear energy of the gauge is taken as the level of the unmarked public line, and the unmarked shape difference is generally accepted as level 11. 2.6 The original number of this standard is suitable for marking the measurement item, that is, the temperature is the center, and the force is 8..? .1 The technical requirements of the functional gauge are as follows: 5.1 The technical requirements of the functional gauge are as follows: 3.1 The performance of each 1 metallurgical table and 4 points are made, state, black old, I mark, pattern is a good external 1. Inquiry on the current and the lack of Japanese yen in the warehouse. 9.2 The teaching of new energy parts, the connection is solid, and the use is not verified. 93 The material of the plan can make the quality of the light affinity of the bucket 9.4 Steel market energy: T 5 70HVeCHRC9.5 The dynamic pipe should be treated after the complete production,
6 The function of the "work surface precision value" should be large (except for the loss of material parts). 97 The energy industry should have the relevant signs of the number change. 9.8 The energy production table serial number should be long on the original plate,
) Manufacturing: Name and mark;
Brush certification.
910 and above should be accompanied by training and certification,
1 integral type (see [3A[>
A2 combination type (see Figure 42
RT 8059-1998
Appendix A
shown in the attached requirements)
functional type
insert type A
4 movable type A4)
5T869--1998
Figure A4 in the delivery condition
GR/T 8069 998
(Appendix of prompts)
Energy gauge for each working part
"Figure annotation of parts & examples of energy gauge for regular working parts are shown in Figure 2, AE
1 Strict network standard
Compared to Deng position
Interval energy cavity design
Qualitative type
Production degree expansion design5250-456
Yukishi
a?&surface
·ten hearts to color
two below
people under the clothes surface and
heart to ticket
three times the clothes surface
·middle limit
a ten heart evil belt
·a flat
a skin heart variation
two flat Yuan three 6
a rotten center to teach
careful to the master and
people flow through the heart
beautiful things are safe
body ordinary people
according to the patient's understanding of some body! People
patient type
war type education type level type dynamic type effect composition activity type or combination type management momentum combination learning or made of state activity 2
Shenzhen Taiwan Public?
+635--1 t3C
no right end
one
CB/13069-:998
Xiaoping Agricultural Bank
careful two tickets
one ten heart
three down and
·one Chengzu
center collection center test element
one Chengxin male parent
center development
full.4 heart approval
person sitting staff
insertion type closed Model
body: medical proof
monitor this room
suitable for benefitbzxz.net
activity type activity combination research
note: basic British model example implementation ten results ("quality heart", Sr
day.2.3 performance as a standard to the time tolerance using content requirements 3
day 2.4: function certificate 1 work room can be determined or determined by the general principle of the subject of the sole production. If necessary and possible according to the current two parts of the directional determination B.2.5 The linear energy of the gauge is taken as the level of the unmarked public line, and the unmarked shape difference is generally accepted as level 11. 2.6 The original number of this standard is suitable for marking the measurement item, that is, the temperature is the center, and the force is 8..? .1 The technical requirements of the functional gauge are as follows: 5.1 The technical requirements of the functional gauge are as follows: 3.1 The performance of each 1 metallurgical table and 4 points are made, state, black old, I mark, pattern is a good external 1. Inquiry on the production table: There should be no rust and cracks:
9.2 The teaching of new energy parts, the connection is solid, and the use is not verified. 93 The material of the plan can make the quality of the material of the bucket light. 9.4 The hardness of the steel market can be reduced by 5HVeCHRC9.5 The dynamic pipe should be treated after the production,
6 The function of the "production table surface precision value should be large (except for the loss of parts). 97 The energy industry should have the relevant signs of the number change. 9.8 The serial number of the energy table should be long on the original plate,
) Manufacturing: Name and mark;
Brush certification.
910 and above should be accompanied by training and certification,
1 integral type (see [3A[>
A2 combination type (see Figure 42
RT 8059-1998
Appendix A
shown in the attached requirements)
functional type
insert type A
4 movable type A4)
5T869--1998
Figure A4 in the delivery condition
GR/T 8069 998
(Appendix of prompts)
Energy gauge for each working part
"Figure annotation of parts & examples of energy gauge for regular working parts are shown in Figure 2, AE
1 Strict network standard
Compared to Deng position
Interval energy cavity design
Qualitative type
Production degree expansion design
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.