title>Guidelines for quality engineering control for electronic beam tubes - SJ/T 10467-1993 - Chinese standardNet - bzxz.net
Home > SJ > Guidelines for quality engineering control for electronic beam tubes
Guidelines for quality engineering control for electronic beam tubes

Basic Information

Standard ID: SJ/T 10467-1993

Standard Name:Guidelines for quality engineering control for electronic beam tubes

Chinese Name: 电子束管质量工程控制指南

Standard category:Electronic Industry Standard (SJ)

state:in force

Date of Release1993-12-17

Date of Implementation:1994-06-01

Date of Expiration:2010-01-20

standard classification number

Standard Classification Number:General>>Standardization Management and General Provisions>>A01 Technical Management

associated standards

Publication information

other information

Introduction to standards:

SJ/T 10467-1993 Electron Beam Tube Quality Engineering Control Guide SJ/T10467-1993 Standard Download Decompression Password: www.bzxz.net



Some standard content:

Electronic Industry Standard of the People's Republic of China
SJ/T10467-93
Guidelines for quality engineering controlfor electronic beam tubes
Published on December 17, 1993
Implemented on June 1, 1994
Ministry of Electronics Industry of the People's Republic of China
Electronic Industry Standard of the People's Republic of China
Guidelines for quality engineeringControl for electronic beam tubesSubject Content and Scope of Application
SJ/T10467—93
This standard specifies the basic elements and control methods to be controlled in the whole process of electron beam tube quality formation. This standard applies to the design and manufacturing process of ordinary electron beam tubes. Enterprises can carefully prepare the relevant tables in this standard based on the specific product situation and supplement the necessary content. 2 Reference standards
SJ/T10221
GB/T19004—-IS09004
GB5960
GB5999
3 Basic control requirements
Guide to quality control for manufacturing of general electronic components Quality management and quality system elements - Guide General specification for cathode ray tubes
Test methods for oscilloscopes and indicator tubes
3.1 Enterprises should carry out quality cost management for products. Generally, prevention cost, appraisal cost, internal loss cost and external loss cost items can be set up, and external quality assurance cost items can be added when necessary. In management, the forecasting, planning, accounting, analysis, control and assessment of quality costs should be coordinated and mutually based on each other. Quality cost management can be specifically implemented in the division of labor of the financial, quality control and other departments of the production enterprise. The most appropriate quality cost should be continuously sought to achieve the goal of reducing consumption and increasing efficiency. 3.2 Marketing quality control should be carried out. Predict the product type, grade, quantity, price, launch time and user requirements for product quality required by the market, and submit a product concept report to convert user requirements and expectations into technical documents. Timely collect, analyze, classify, organize and transmit product usage information to serve the improvement of design and management. 3.3 Design review activities must be carried out at each stage of the design process, and quality engineering control must be implemented to ensure product design quality. 3.3.1 Preliminary research should be conducted when developing new products. While determining the advancement and rationality of the plan, the reliability, safety and economy of the product should also be fully demonstrated, and a feasibility study report should be submitted. 3.3.2 Advanced, reasonable and practical quality goals should be formulated for the product. According to the overall quality goals, the technical quality department organizes reliability designers and quality management personnel to conduct research on performance and use environment, and predicts and analyzes the reliability requirements and quality requirements of the product.
3.3.3 According to market research and user needs, demonstration and appraisal of relevant stages of the development process should be carried out. 3.3.4 Before the design is finalized, small batch production shall be implemented, and process review and product quality review shall be carried out. Functional classification shall be implemented for the products with finalized design. Before production is finalized, batch production shall be implemented and the product production line shall be evaluated. A comprehensive review and certification of the products in the production trial stage shall be organized to ensure that the technical documents, process equipment, raw and auxiliary materials and outsourced parts of the product production meet the needs of product production; product performance and economic efficiency and other indicators meet the requirements. 3.3.5 Design changes and design improvements shall be carried out according to the prescribed procedures. 3.3.6 Specific quality monitoring requirements in the design process are shown in Table 1. 3.4 Procurement quality control shall be strengthened and source flow management shall be well managed. 3.4.1 The list of major outsourced and outsourced raw and auxiliary materials and parts suppliers and their monitoring requirements shall be filled in according to Table 2. 3.4.2 The main purchased and outsourced raw and auxiliary materials and parts should be graded according to their importance, and the main quality items should be inspected and accepted before entering the factory. See Table 3 for details.
3.4.3 Carry out good warehouse management, store the purchased and outsourced raw and auxiliary materials and parts according to the specified requirements, and strictly implement the distribution system.
3.5 Strengthen process control, adhere to prevention as the main approach, and implement an effective combination of quality control and quality supervision. 3.5.1 The processes should be graded according to their importance, and the quality characteristics of the process products should be strictly monitored. The quality engineering management of the manufacturing process should be specifically in accordance with Table 4. Factor management shall be carried out for all key processes or important processes that need to establish process control points. Specifically, the cause analysis of quality problems caused by the process should be carried out around the product quality characteristics of the process, and corresponding inspection and control specifications should be formulated for the dominant factors (causes), and the responsible persons should be identified and form 5 should be filled in. 3.5.2 Inspection activities shall be carried out for production equipment in key processes such as cathode powder spraying, precipitation, electron gun mounting, core column manufacturing, and exhaust. The equipment management department of the enterprise shall work with the user department to fill in the inspection requirements according to form 6 and issue them for execution, and set up an inspection record sheet. The operators shall record the inspections truthfully after regular inspections. If there are quantitative contents, specific data shall be recorded. The equipment management department shall strengthen the spot check supervision on the effectiveness of the inspection work. The equipment inspection rate of key processes and the intact rate of key equipment should reach 100%. 3.5.3 Enterprises shall fill in the calibration requirements for key test equipment and measuring instruments used for production line and finished product testing according to form 7 and manage them.
3.5.4 The environmental requirements for key and some important process processing areas shall be in accordance with form 8. 3.6 Strictly inspect finished products and carry out failure analysis. 3.6.1 The enterprise shall fill in the calibration requirements of various analytical equipment according to Table 7 and manage them. When a product fails, an analysis shall be conducted. Specifically, the work can be carried out according to the failure analysis flow chart in Figure 1: 3.6.2 The finished product inspection items, contents, sampling methods, testing procedures, etc. shall be filled in according to Table 9. 3.7 Regularly carry out education and training activities to continuously improve the quality of personnel. The training requirements for special staff shall be in accordance with Table 10. Operators of important processes and other special workers shall be certified before they can take up their posts. 3.8 For abnormal quality information of the product, fill in the quality information card in time according to the type of problem, transmit and feedback to the relevant units, solve quality problems, and form a closed-loop management of quality information. 3.9 Regular process quality audits and product quality audits shall be conducted, and process quality audit record cards and product quality audit record cards (see Table 11, Table 12) shall be filled in in time, and rectification work shall be carried out. 3.10 Control shall be implemented over product delivery, packaging, storage, and transportation, and product after-sales service shall be carried out. 3.11 The enterprise shall establish corresponding rules and regulations for various quality activities and make good implementation. 2www.bzxz.net
Design content
Design polarization
Scale form
Electrode support method
Lead wire lead method
Mechanical deviation of light spot
Non-working durability
Cathode and hot wire leakage current
Design name
Design stage
File type
SJ/T1046793
Production report
Pre-approval report
Confirmation of the description, evaluation and assessment of the material results|| tt||Design content
Design classification
Scale form
Electrode support method
Lead wire lead method
Internal leakage
Ray series
Mechanical offset of light spot
Non-working kitchen
Leakage current of hot wire
Design name
Design stage
File type
Full Mongolian Art
SJ/T10467-93
Fine product#
Limited to inspection
Production in Han|| tt||Trial products
According to and determined by production
Requirements for capital
Zhengsheng 2 Ji Er Class Theory
Design trial production stage
Production trial production stage
Design improvement
SJ/T1046793
Main outsourcing, outsourcing raw and auxiliary materials and parts supplier list and their control requirements Main outsourcing, outsourcing raw and auxiliary materials
Material and parts name
Nickel tungsten magnesium strip
Stainless steel strip
Stainless steel pipe
Elastic alloy strip|| tt||Insulator
Porcelain tube or slope rod
Cathode carbonate
Corundum powder
Phosphor
Colloidal graphite emulsion
Potassium silicate
Chromium trioxide
Nitrocellulose
Butyl acetate
Organic film
Evaporation
Barium nitrate
Explosion-proof steel belt
Qualified supplier
Certification or certification unit
Monitoring measures
SJ/T10467-93||tt| |Inspection method
Importance classification
Gas cross
Mechanical deviation of light spot
Working durability
Auxiliary parts
Original name
SJ/T10467-93
Rust machine
Inspection method
Importance classification
Gas cross
Mechanical deviation of light spot
High car inspection
Original name
Executor
Process classification
Hot wire electric| |tt||Body cross
SJ/T10467-
Mechanical displacement of light spot
Name of work
Emulsion water
Heat, etc.
Self-inspection
Wire aluminum, etc.
Heating quantity
Welding degree adjustment
oloool
Earth all sub-device
Inspection work
Number or level
Reading mirror day
Self-inspection special inspection
Energy placement
Example response
Observation quality||tt ||Gift block welding
Outer dimension surface+
Alignment degree, etc.
Rice frame light
Xiaomotai School
Executor
Process classification
SJ/T10467-93
Furnace machine socks
Material mat
Acid, etc.
Polyester two acid, fatty acid, etc.
I-shaped classification
Gas cross
Mechanical displacement of light spot
Three separations, etc.
Glue oxygen
SJ/T10467-
New stop "sweeping
sealing pipes, etc.
inspection work
explosion work
recording table area control chart
leakage test
high inspection air test
self inspection special inspection
furnace clamp
joining length wrinkle
welding pipe and shaft
number of vehicles
pipe solder
pulling instrument
inspection work
yaoren risk
full inspection and random inspection
self inspection special inspection
SJ/T10467-93
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.