GB/Z 18727-2002 Implementation Specification for Enterprise Application Product Data Management (PDM)
Some standard content:
ICS 25.(2U
National Standardization Guiding Technical Documents of the People's Republic of China GB/18727—2002
Enterprise Application Product Data Management (PDM)
Implementation Specifications
Enterprise application PDM implementing specifications2002-05 20 Released
People's Republic of China and
General Administration of Quality Supervision, Inspection and Quarantine
2002-12-01 implementation
GB/Z 13727--2002
Text and data warehouse
Product configuration management
Workflow management
Production management
Project management
Inspection and parts warehouse
Order and graphic services
Electronic collaboration
Online integration
Communication and notification services||tt t||Data base and data translation
Enterprise PIM requirements analysis
Determine the scope of enterprise implementation
Analyze the enterprise's desired end-user requirements
What applications can be applied and how to apply them? Study the enterprise's expected user interface
System medication and operating environment selection requirements, and clarify the system connection scenarios
Required Vertical tools and procedures
Carefully analyze the types and data to be managed1.8
Divide the types of data required for the transfer of costs4.
Enterprise listening to the technical guidance and warning service
Analyze the enterprise research and development standards that must be met..PIM system selection and pricing method
Wash the source
a.2PI14 system selection steps
6 Enterprise application M implementation methods and steps
6.1 Pre-implementation documents preparation
6.2 Business cost requirements to ensure that the enterprise implements M.3PIM product selection and installation-
Business effect collection and external analysis
Conduct situation reversal
Development station
Use Guangzheng Xinlizhou integration
.......
T KANm KAca
GBz13/272002
In today's information age, the application of information technology for enterprise technology innovation is an important stage. In the future, the application of information technology in enterprises will be the basic platform for the overall implementation of enterprise information technology. Therefore, the application of PIM technology has raised the urgent need of enterprises at home and abroad: 1DM should include a wide range of information points and data required by the entire life cycle of enterprise products. It is a technology that is used to manage all information related to products. In recent years, PDM is the technology that has been developed and applied the fastest and has become a hot spot for enterprises to pay attention to and use. In the international market, quite a number of companies have proposed PDM solutions. In this regard, many enterprises have adopted PDM. Although the development of IDM technology in China started relatively late, it has been very fast. Enterprises also need to implement a standard in DM. There is no unified standard or specification for fire prevention before. For the North, the standard is suitable for the implementation of PDM in Chinese enterprises: it can refer to the development, promotion and application of PDM by enterprises, consulting and service units and enterprises to improve the effectiveness and success rate of FDM in enterprises. This guiding technical document is for reference only. The relevant departments of the Ministry of Standardization of the People's Republic of China provide this guiding technical document.
This guiding technical document will be implemented on December 1, 202. This guiding technical document is proposed by the China Federation of Machinery Industry. This book is a guiding technical document and is under the jurisdiction of the National Standardization Technical Committee of the Industrial Automation System. This guiding technical document is issued by the Shandong Institute of Automation of the Industry. The main content of this guiding technical document is: 1. Standardization of the People's Republic of China National Standardization Guiding Technical Document Enterprise Application Product Data Management (M) Implementation Specification Enterprise application PliMi implemenilng specificationGR/7.18727—2002
This technical guide is for enterprises to apply technology and provide implementation specifications: This technical guide is used by enterprise M system development units, M consulting service units and units that provide DM technical support. 2 Definitions
This technical guide adopts the following definitions: 2.1 Product Data Management (PLM): The database management function is used to record all product-related points including parts information, matching, implementation, CA, cleanliness, authority information, etc. and all product-related processes (including process definition and management). 2.2 Database database vault
DM's compensation data (element data and index data of different products) are composed of files, which can be used to mine the data between the external environment and the system flow. 23
Construction service product material list. 2-4 production management prodicenfigirationraagemt is based on the supply warehouse as the support, with the bill of materials as the group to guard the final product's engineering data and documents, and to protect the objects and their mutual systems. 2.5 product construction time ree afrncictsturc
The final result of the product is that it must be installed in the system after the product is shipped out, and the product parts must be detailed (including spare parts, standard work, white supply, solid materials, etc.).
2.6 Work management wurlwumnagtann
The soil data is sufficient to realize the product design and modification process follow-up and control, including the submission and adjustment of work limit settings, operation supervision, document management control, user dynamic extension, etc.:
3PDM function
3.1 Document management and data including military
3. 1. 1 The supporting documents include: 1. The starting point includes the contract, product design tasks and feasibility study report, product design specifications and other documents. 2. The information includes engineering design and analysis data, part of which is the current specifications and specifications of the project and the technical parameters of the product, and the other part is the effect generated during the improvement process. In addition, there are product models, product parts, and test reports, acceptance standards, and other CNC codes. GA/7.18727—2002
) Process Index (AP) is a data used in the process of system process design, which is divided into two categories: static process efficiency and dynamic process efficiency. The data is based on the above three standardized process indicators and standard process indicators, etc. The dynamic process indicators are used in the process of process planning to estimate the relevant information, provide the rules required for process dynamics, and the process knowledge is mainly divided into two categories: selection and decision-making rules.
! Production data training 2 production The data can be divided into two categories: basic effect, which is related to the stability of the overall teaching effect. This effect is relatively unique and has some influence on the existence of other new effects: maintenance and repair documents, non-documents such as records and user manuals, and special documents for different professions, such as electrical schematics, circuit board diagrams, and parts diagrams in the electronics industry.
3.1.7 This type of effect
IT A) Graphic file (.A) Select the geometric figure of the system product, and select the text file of the product or parts. () Digital file In order to quantify the design of the parts, the finite element analysis, machine motion simulation, test and other product types of data files:
table text related to the product definition information of the parts and components, the product structure and related information, the basic data characteristic parameters of the product. Give The relationship between the product index and the parts is low, e) the multiple parts are in the same format, the dynamic flow tax and parts points are added under the technical guidance, and the audio is recorded, and the multimedia files are exchanged. 3.1.3 The virtual data warehouse is the core of TTM. It is generally based on the relational database system, and it mainly guarantees the security and integrity of the data. It is responsible for the query and price of the service (see 2.2) 32 product matching management
3.21 Product placement: routine production data preparation and management system-- product life cycle management department for the effectiveness of the enterprise. ) Various parts of the material replacement (BM) inactivation of the product data grasp the chaos of the school, after transportation to the most necessary number of cattle, etc. 3.2.2 Product follow-up purchase
In the product classification, the demand for quality parts of the product is different, the product demand for military life is summarized in the table. If the demand is met, the product parts tree is used. The product structure is described in a nucleus-shaped diagram, with nodes as finished products and leaf nodes as small parts. The product assembly system diagram (including the title, standard parts, raw materials, etc.) is used to describe the product structure. The product tree reflects the relationship between the product, accessories, and the components. The product tree should be based on the industry model and the overall management of the product. The product structure tree should be based on the overall management of the product. The promise, analysis results, collection of technical statements, 1 art pieces, etc., are all product system establishment system, so that the upper and lower can make the authentic dishes - the item changes caused by the continuous impact of the color of the product station structure product world principle out of the travel choice, you can return the heart product version in the line work status to the statutory 3.31 work flow pregnancy general management || tt || 3.3.1 batch flow management || tt || state song self-teacher meeting way Liu Wen mother class line exchange city batch development teaching development case a boundary consultation feather consulting party related leadership welcome line film, open in the certificate record way water big insurance Li city batch 3.3.7 General management of process reform
GBV18727—2002
The process reform is essentially a special case of single process analysis. The management of the board generation approval process is similar to the management of the board generation approval process. 3.4 No code
3.4.1 Some general inspection needs
The FIM system has accelerated the rapid reversal of the analysis technology: using intelligent zero-cow sequence 7, succession investment technology, search/inspection technology, shared document library technology, etc. ||t t||3.1.2 Part Abbreviation
Part abbreviation is a string of characters, each character represents a code position. PM system improves the performance of the program, 3.5 Project Consulting
Prediction management is to realize the planning and management of the project, personnel change the relevant data and configuration, conduct the daily operation status monitoring, complete the flow of the project, provide the management personnel with the summary of the work, and provide the users with the ability to calculate the loss of resources. | |tt||Lanzhou must support the electric one-stop approval process
This plan can be signed by the user before the production is completed, and the design graphics, images, etc., the user can match the text and drawings, etc.:
3.7 Design review and word search: Color master
The design of the parts library is to maximize the use of original design resources to create a new product standard for the design, which can fully utilize the design personnel's existing experience and intelligence to accelerate product development. The design inspection can be done through a variety of signatures: for example, the company can classify the parts with the same or similar characteristics according to the product structure, the core can classify the parts according to the product code data, etc. Each warehouse can classify the parts with the same or similar characteristics so that they can be used at any time in the design:
3.3 Scanning and image absorption service
It can convert engineering drawings or microfilm files into images and manage them with other PM systems: 3.9 Electric
It can integrate the work of the main cost of the country to support the international products of the automobile industry. Under the current people's different working methods, such as electronic conferences, multi-person review and participation in meetings, etc.,
3.10 and centralized management
environment, in order to quickly share information between systems and to manage the data generated by the production system, it is necessary to install this piece of equipment in the M system [M various systems supply (installation foreman 3.11 Runli Di advertising stock service
system communication) to provide the ability to send and receive data between different internal systems. This internal system includes the FDM system and the external systems that make up the 1DM system, such as the sales completion/collection service-MAII Niu home and marketing direct distribution department consumption order, monitoring H period, etc.
3.12 Transmission and data transmission rate
Data transmission can enable the end user to obtain product information without having to physically store the information in a physical location or in a French language. The purpose of this data is to translate the information generated by the different sequences and to make it effective in the application. The book only involves the interface between the film and the interface and plays a very important role in the application. 4 Enterprise Application PI>M Demand Analysis
When designing 1M application, the enterprise must effectively bridge the relevant data flow of the enterprise between the business processing gates, clearly define the enterprise's demand for M, and conduct industry standards for M. It is necessary to give the enterprise a detailed demand specification in order to evaluate the enterprise's pricing, supply and FM system models, and use it as the basis for industry screening P1. The first system enterprise P emperor said the standard is as follows:
4.1 branch office business enterprise implementation of the light film
-TKoNm KAa-
branch enterprise according to the actual tax and profit needs to determine: GB/Z18727·2302
:) the class fixed HI>M implementation of the organization pool day is for project correction, compensation for individual enterprises and cross-enterprises and cross-regional; 6) determine the standard use: is to the medical document management design system data, but also a wider range of time or! The time of the actual distance is whether it is a one-time reduction or a staged completion: 4.2 Guarding the average success rate of the village enterprise entrepreneurship assistance
) and the user education volume, the initial performance period: 5) the operation and change of the product, technical account user) PDM user management position distribution
4.3 The price of the expected service and the function of the user
a) The user needs a more function when the user needs it;) The mail collection function must be able to steal!
:) For the industry, implement 1LM professional enterprise management and reorganization of the inspection, 4.4 Guarding the enterprise period of the correct user connection
! You need to work this month's more:
point to cut their own user interface.
4.5 System structure and requirements description of the selected equipment and service unit:
E) The practical and strong hard configuration required for the implementation of FDM: The net construction required by the following procedures
4.6 Analysis and interface with the three systems and the results
) The MRPII ERT system or CAI/CAPPCAM system of the other party must be integrated with PIM according to the scheme:) The existing data must be! F[M has an interface or more information:, analyze and (AD/:A11/CAM integrated application. The required information and program of Shenzhen workers and beds) is the need for multi-level practical management programs, such as system return and user level; above) new management only benefits integrated practical program! The practicality of the industry E can do all the management and integration work. The period of some benefits consultation. Some need to improve the efficiency of the industry needs to change the type and quantity of the film industry
! Neutron radiation, quality or other quality data
I:) CAI/CAPP/CAM, MRTTI/FRP, etc.: The data to be managed by each customer is small, how much is the market/long-term data?) Whether the supplier has sufficient management and management strategy for the industry. 4.9 Analyze the type and amount of data that need to be transferred, and what type of data/scientific data needs to be transferred from the application system? Including the widely used paper medicine, H and other suitable data CADCAPAVMRRERP, etc., the data required to be transferred to the most recent period of time, and the data of the people's livelihood: 4.10 The enterprise hopes to support the internal technical guidance and consulting services to determine the business product with experience in standardization and the enterprise's technical personnel to achieve the self-control and self-certification of the automotive M system: b Whether the supplier is willing to cooperate with the enterprise's technical personnel to implement the enterprise's PEM system; e Whether the enterprise is affected by the dream of quality pool and service innovation, 41 The external industry needs to avoid the total introduction and 1 industry to prove that the enterprise has the necessary standards:
HZ18727-20C2
b) The enterprise has no data library management system (D13MS standard) must be considered when implementing 1M: 5PIM1 system selection and evaluation method
Based on the "Enterprise Quantity Voice [D Demand Analysis" see Chapter 1 as a deduction, car 5.1 Selection principles
E.1.1 PIM system applicability
M system applicability should meet the needs of enterprises, regardless of the production method, production model, and product type. When entering the industry, it is necessary to meet the needs of enterprises. 1: The actual ability of your organization is a level, the entire enterprise level baking gold industry level) P heat must be used to meet the needs of the company's semi-art management, the difference between the system management, to a wider range of areas 5.1.2P1.V system's advanced features
: The system must be able to shine and meet the needs of the industry (1.3: M system more advanced! Or there are advanced development tools
) FTM system used by the internal database management system, Shen sent: 5.1.3P11M system state release software
) support multiple breaking platforms
5) support multiple data operations:
) special and various network processing proposals, TC/SPXPx, etc.: multiple support
" advanced technology, w-njcct-:nted, etc.: 5.1.4P system integration
a, CAxVRPI.ERP, A car H pool is your case) P system as a whole to meet the machine and its total industry standard (gram 4.: eDM system provided by the expanded judgment tool;
Small: TM system is the supplier of the factory, and the brand size of the month user requirements (. 5.1.5M system's degree of customization and the overall effect of the system) PIM system two products must be completed: 5) the sales training on the special product practical user volume: ) M more than the return of the version of the promotion and penetration
5.1.5 [DV system supplier's medical, letter and support services such as the system supply tax can be determined, the bone high
uP [system should have a rich teaching net power to meet the requirements of the enterprise and the basic guidance and consulting services 1 first. 5.1.7 social difference price good
5.1. Daily use of the open can protect / all resources 5.2M system selection + music
According to the Beijing play, the market number of this merchant proposed M into the light: 5.2-! PI1 system enters public price
) The glue M system quickly measures its energy output rate and cuts through the verification: h conducts customer survey:, Youzhou film source:
c! Research and test the system:-3 T KAN KAca
5.2.2 Operation energy output test
G/z 18/272C02
! Prepare the report form based on the needs of the enterprise, focus on the special requirements of the enterprise;) Know the PI supplier to jointly conduct energy testing, inspect the degree of health protection, and discuss the solutions to the problems in operation. 5.2.3 Consult and evaluate the solution for the enterprise b) The enterprise still needs (see Chapter 1) to provide PDM suppliers b) Each PIM supplier will conduct an analysis based on the enterprise's needs. Provide the enterprise with a solution text for applying PLM; H) Enterprise response personnel, PM consulting experts, analyze and listen to the solutions of various PLM suppliers, conduct evaluation 4) Comprehensively expand the evaluation results,
5.2.4 Comprehensively evaluate and determine the selected model
6. Enterprise PDM implementation methods and steps
Enterprise PDM implementation involves many departments and existing application systems. Therefore, in the implementation of PDM, it is necessary to have a reasonable methodology from the perspective of the system. This main methodology has the following contents: 6.1 Preparation before implementation
6.1.1 Project establishment and decision making
Enterprise PDM implementation methods and steps
Enterprise PDM implementation methods and steps
The main leaders of the enterprise should participate in and directly seek the support of the project establishment and legal policy, and try to get the full support of the enterprise's commitment departments, especially the support of the process, logic, information flow and management departments, because they are the basis for successful implementation.
5.1.2 It is necessary to form a large PTIM implementation team in the enterprise, including the leaders of the application enterprise, systems, electronics, analysis, manufacturing and other departments, as well as the PLM supplier support personnel: clear division of labor 1 Table 1 Table 21PLM implementation personnel post responsibilities and responsibilities set 4 comprehensive ethics and ethics production 4 buildings (P implementation personnel post use urgent requirements M company enterprise employment guidance, enterprise limit Ning PI and company implementation company, enterprise net income department) tax repayment department business west is, the United States young and old senior technology base must be fast enough certification process mountain personnel! Work. Two senior women in office.
Monitor the receipt of sales orders according to the plan, measure the progress of the project, determine the scope of the implementation of the production team, coordinate the business relationship between the next department personnel. Maintain the consensus with the company's personnel during the implementation process, measure the skills of the personnel in the normal process, determine the number of project personnel, monitor the progress of the project, and evaluate the performance of the implementation personnel.
The person in charge of the average item on the month shall entrust the second work to send the feeling record this work summary order
Item Sichuan has established
Service door PDM
Item 4 person in charge,
Producing department
GB/Z 1B727.--2002
Table is finished)
IV Implementation of A civil post supervision responsibilities
Sang you require
Company, enterprise water department technology) special communication department business flow management. Technical personnel
hl have a certain foundation of their machine technology,
【The personnel work,
[d" work carefully, the machine is highly certified,
electric" also cover the old conservative for the enterprise.
Company, professional technicians
) take over the business process of the cloud department, the wide
FDM company, the industry application
main security
file number
engineer machine knowledge,
h) responsible for work production, high image.
) Be honest and cautious about the enterprise,
special job,
b) "understand the computer test.
<) Responsible for work production, active and high,
) Enterprises are honest in their duties.
Year
Job responsibilities
Guide the work tasks of other departments to ensure the benefits of the plan.
Is the whole process of product implementation and PT reflection through neutral time verification
Responsible for maintaining the normal operation of the system, guiding the overall work of the personnel involved in the project plan implementation.
Carry out data collection and product demand analysis, and create a system operation.
Collect the following pictures: Complete product "national dispatch" documents: organization structure, personnel role table, authority allocation table, etc.
Process description: the design of the process and the product design can be determined in two aspects,
PDM implementation requirements
The practical personnel
Le Aijing
The technical experts and engineers of the department must have a regular knowledge of the product design (more than three years of work experience in the product design department, and must be familiar with the technical effects of the product).
1The production certificate must be issued to the company,
The company can obtain the approval of the company,
The process and tooling
The production policy
The business plan
The business plan
The process and tooling
The production plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan www.bzxz.net
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
The business plan
Shaomen's technical products are hot descriptions of the enterprise's standard changes, the enterprise's technical documents and practice specifications. The number of departments that undertake the work of the wood department, that is, the work schedule, the work schedule, the standardization of the various management year, month, date, and the preparation of the complete work of the Korean industry products, the common industry technical plan and information, understand the enterprise's data scanning regulations! Each department has more than one technical personnel, and the technical personnel must be equipped with 1 month of work quality assurance personnel and other related PM training plans. 5.3 Pre-implementation training
G/.18727—2002
In the preparation work for M model, PM training shall be carried out on the business backbones of all departments of the enterprise so that they can have a deep understanding of the frequency of M and the full benefits of M. The enterprise shall jointly implement the M, and the enterprise shall hand over the implementation of M to the first management. It is necessary for the enterprise to recognize the important work of PM training in the implementation of M, and the technical personnel of the second process shall cooperate with the management:
E.2 According to the enterprise's production requirements, determine the enterprise's implementation of PTM planning and make preparations for the work. Analyze the enterprise's needs and make the enterprise's actual planning plan. The planning rules are: E.7.1 The overall plan is implemented in the process of implementation. The PM system can be implemented in the process of implementation. The implementation of the plan must be carried out in the form of a large-scale promotion. It is necessary to plan the overall plan and the actual situation. A: According to the industry process, the overall use of the yuan is very important. The first step is to check the changes in the formulation stage. Gradually take the results of the stage: 6.2.2.2.3. Determine the cost and budget of the project, and formulate a specific cost control plan for the project. E.2.4. Determine the overall progress and schedule of the project, and formulate a human resource demand plan for the implementation process, including the supply chain of enterprises, suppliers and technical personnel. Make specific arrangements to ensure the smooth implementation time. E.2.5. Determine the prevention and control policies for risks. Evaluate the risks of implementing the project, and take measures to prevent and control the major risks. E.3.1. Product selection and installation E.3. 12 Product selection See Chapter 5
6.3.2 FIV. System installation
Enterprise installation DM system must be carried out when the enterprise H group of internal resources · in the installation process of the relevant M should be trained and maintained by the personnel
6.4 Enterprise data collection 1 public standard
Requirements clearly understand the content of the extension and the beauty of the local area, that is, the personnel, such as business flow, data and data: 1) Research and development personnel at the level of the red H research and development H proofreading: 6 Analyze the business flow and make corrections, determine the new steps and specifications of the business process, 2) clarify the data generated by the process of each activity or process point, d) define the PDM dynamics, the data must be organized and scientific. e! Clarify the information infrastructure of the enterprise.
6.5 Carry out the user-friendly
Build the P system structure of the enterprise application system based on the collected data in 4 to establish a data model, define the process model, and set up the user interface of the system. Then AAMMRIER, etc.! 6.6 DM system innovation
Combined with the needs of the enterprise, the user development platform of the DM system is provided by the factory. 1. First, through micro-development, establish a PM system with special features, and realize the various management models and data models in the system, and simulate the operation. And carry out comprehensive corrections. 6. Use the information collected by the enterprise to evaluate, assess and make adjustments: According to the evaluation of the original design, the next round of implementation will be carried out. According to the needs and functions of the PM system, new content will be continuously added:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.