title>HG/T 2004-1991 Paint for cement floor - HG/T 2004-1991 - Chinese standardNet - bzxz.net
Home > HG > HG/T 2004-1991 Paint for cement floor
HG/T 2004-1991 Paint for cement floor

Basic Information

Standard ID: HG/T 2004-1991

Standard Name: Paint for cement floor

Chinese Name: 水泥地板用漆

Standard category:Chemical industry standards (HG)

state:in force

Date of Release1991-06-27

Date of Implementation:1992-02-01

standard classification number

Standard ICS number:Paint and pigment industry >> 87.040 Paints and varnishes

Standard Classification Number:Chemicals>>Coatings, Pigments, Dyes>>G51 Coating

associated standards

Publication information

other information

Introduction to standards:

HG/T 2004-1991 Cement Floor Paint HG/T2004-1991 Standard download decompression password: www.bzxz.net

Some standard content:

Chemical Industry Standard of the People's Republic of China
Paint for cement floor
1 Subject content and scope of application
HG/T 2004 -- 91
This standard specifies the technical requirements, test methods, inspection rules, and marking, packaging, storage, and transportation requirements for paint for cement floor. This standard applies to paint for cement floor with urethane, phenolic or epoxy resin as the base. This paint is mainly used for cement floor, and can also be used for coating wooden floor.
Referenced standards
Determination of hiding power of paints
GB1726
GB 1727
GB 1728
GB 1729
GB 1768
GB 3186
GB6682
GB 6739
GB6740
Paint film - general preparation method
Determination of drying time of paint film and putty film
Determination of color and appearance of paint film
Determination of abrasion resistance of paint film
Sampling of paint products
Specifications of water for laboratory
Determination of hardness of coating film by pencil method
Determination of volatile and non-volatile matters in paint
GB 6753.1
GB 6753. 2
GB 6753.5
GB9266
GB 9271
GB9274
GB9286
GB9750
3Product categories
Determination of grinding fineness of coatings
Surface drying test of coatingsSmall glass ball method
Determination of outflow time of coatingsISO flow cup methodDetermination of flash point of coatings and related productsClosed cup balance methodDetermination of scrubbing resistance of architectural coatings
Standard test panels for paints and varnishes
Determination of resistance to liquid media
Paints and varnishes
Cross-cut test of paint film
Paint product packaging marking
I Type I is polyurethane paint. Type II is phenolic paint and epoxy paint. 4 Technical requirements The product should meet the technical requirements listed in Table 1: Approved by the Ministry of Chemical Industry of the People's Republic of China on June 27, 1991 211 Implemented on February 1, 1992 State in container Brushability Paint film color and appearance Viscosity, s Fineness, μm Drying time, h Adhesion, grade Hiding power, g/m2 Water resistance (Type I 48h, Type I 24h) Abrasion resistance, Washability, times 5 Test methods 5.1 State in container HG/T 2004—91
Not more than
Not more than
Not less than
Not more than
Not more than
Not less than
No lumps after stirringWww.bzxZ.net
No brush marks after brushing, no impact on the substrate
The paint film is flat and smooth
No bubbles or shedding
Open the container and stir with a spatula. Some sediment is allowed at the bottom of the container. When it is easy to mix evenly after stirring, it can be defined as "no lumps after stirring". 5.2 Brushability
Make two pieces of cement (silicate) concrete slabs of 200mm×100mm×30mm and maintain for 7d. Then use 107 glue to make cement viscous and evenly apply it on the cement board. The coating size is 100mm×100mm or 200m×50mm. After drying for 48 hours, brush the cement floor paint. The paint should be evenly distributed on the cement glue and the upper and lower parts of the concrete board. When the extension (penetration) is good, it can be defined as "no brush marks after brushing and no impact on the substrate".
5.3 Paint film color and appearance
According to GB1729.
5.4 Viscosity
According to GB6753.4, use No. 6 cup for testing. 5.5 Fineness
According to GB6753.1, use 0100um fineness meter for testing. 5.6 Drying time
According to GB6753.2 and GB1728, the temperature is 23±2℃ and the humidity is (50±5)%. 5.7 Hardness
According to GB6739.
5.8 Adhesion
According to GB9286, the cutter spacing is 1mm and transparent tape is used for sticking and tearing. 5.9 Hiding power
According to GB1726.
5.10 Water resistance
According to Chapter 5 of GB9274.
5.11 Abrasion resistance
HG/T 2004-91
According to GB1768, add 750g code during the test, and the grinding wheel rotates 300 times in total. 5.12 Scrub resistance
According to GB9266, the scrubbing medium is tap water. 6 Acceptance rules
6.1 All technical requirements listed in this standard are type inspection items. Among them, the viscosity, fineness, drying time, hiding power, color and appearance of the paint film, hardness, adhesion, water resistance and abrasion resistance of the liquid paint are listed as the inspection items for export. In normal production, type inspection is carried out every six months.
6.2 The products in each paint tank are a batch of products. Each batch of products shall be inspected by the inspection department of the manufacturer in accordance with the provisions of this standard, and the manufacturer shall ensure that all products shall meet the technical requirements of this standard. The products shall have a certificate of conformity, and instructions for use and precautions shall be attached when necessary. 6.3 The receiving department has the right to inspect the products in accordance with the provisions of this standard. If the quality is found to be inconsistent with the technical requirements of this standard, the supply and demand parties shall jointly re-sample and re-inspect according to GB3186. If it still does not meet the technical requirements of this standard, the batch of products shall be unqualified and the receiving department shall have the right to return the products.
6.4 The products shall be sampled in accordance with the provisions of GB3186. The samples shall be divided into two parts, one for sealed storage for future reference, and the other for inspection. 6.5 The supplier and the buyer shall check and verify the product packaging, quantity and marking. If the packaging is damaged or leaking, the quantity is inconsistent, or the marking does not meet the requirements, the relevant departments shall be notified in time for handling. 6.6 When there is a dispute between the supplier and the buyer over product quality, the product quality supervision agency shall conduct arbitration inspection. 7 Marking
According to GB9750.
8 Packaging, storage and transportation
8.1 The product shall be stored in a clean, dry and sealed container, and the device shall not exceed 95% of the volume. When storing, the product shall be kept ventilated and dry, prevent direct sunlight, and be isolated from fire and heat sources. 8.2 When transporting, the product shall be protected from rain and sunlight, and shall comply with relevant regulations. 8.3 Under the storage and transportation conditions in accordance with Articles 8.1 and 8.2, the effective storage period of Type I is half a year and that of Type II is one year from the date of production. If the storage period exceeds the storage period, it can be inspected according to the items specified in this standard. If the results meet the requirements, it can still be used. 9 Safety, health and environmental regulations
This paint contains organic solvents such as xylene and 200 solvent oil, which are flammable liquids and have certain toxicity. Attention should be paid to ventilation at the construction site. Take measures such as fire prevention, anti-static and poisoning prevention, and comply with the safe operation procedures and relevant regulations for coating operations. The maximum allowable concentration of toxic substances in the air of the construction site and the fire and explosion prevention parameters are listed in Table 2. Table 2
Xylene
200 solvent oil
Maximum allowable concentration
Maximum explosion pressure
Explosion limit (volume %)
Explosion hazard
Autoignition point
HG/T2004—91
Appendix A
Construction reference
(reference)
This paint is generally applied by brush, and the paint must be stirred evenly before brushing. Ali
A2 cement concrete substrate must be cured for more than 7 days and undergo appropriate surface treatment such as neutralization. Before painting, the moisture content of the substrate should not exceed 10%, the pH value should not exceed 8, and the surface should be clean and free of water, mud and other dirt. When A31 type paint is a two-component paint, it should be prepared as needed, and the amount should be prepared as needed, and it should be used up within the specified application period. Construction tools should be immediately cleaned with specified solvents.
Additional instructions:
This standard was proposed by the Science and Technology Department of the Ministry of Chemical Industry of the People's Republic of China. This standard is under the jurisdiction of the National Technical Committee for Standardization of Paints and Materials. This standard was drafted by Dalian Paint Factory. The main drafters of this standard are Zhang Xiuqing and Gong Shiyan. 211
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.