This standard specifies the requirements and methods for the geometric accuracy inspection and working accuracy inspection of radial drilling machines. This standard is applicable to radial drilling machines for general purposes. GB/T 4017-1997 Accuracy inspection of radial drilling machines GB/T4017-1997 Standard download decompression password: www.bzxz.net
Some standard content:
National Standard of the People's Republic of China GB/T4017.-1997 eIv 1So 2423: 1982 Radial drilling machines Testing of thc accuracy1997-11-13 Issued 1998-07-01 Implementation National Technical Supervision Bureau Issued GB/T417-1997 This standard is equivalent to the international standard 15242319A2 Drilling technology: Accuracy test (confirmed in 1993). That is, the technical standards are equivalent to the national standards. This standard makes minor technical corrections and supplements to the 12423 standards. The main differences between this standard and standard 150212 are: 1. When the main rail of item G is in three equal energy positions, the parallel inspection of the base is added according to the situation: 2. The position and condition of the relevant parts are supplemented in the inspection: This standard takes effect from the date of entry into force: the same time core CB4017-33 drilling machine accuracy Appendix A of this standard is a non-standard record, This agreement is undertaken by the Ministry of Machinery Industry of the People's Republic of China: This standard The Ministry of Industry and Commerce of China. Beijing Machine Tool Research Institute. The drafting unit of this standard: Beijing Light Machine Tool Research Institute. This standard was first issued in 1997. G8.T40171997 1S The United Nations Organization for Standardization (UNISOC) is a joint organization of the United Nations Organization for Standardization (UNISOC) and the World Organization for Standardization (WTO). The formulation and preparation of the standard shall be completed through the 1st meeting of the technical committee: Any body that has established a technical committee has the right to express its opinions at the meeting. 1S Contact International Standard ISO 211 is a book developed by the IS(1/TC Machine Tool Design Committee. The first edition directly refers to the 1S0212 Technical Committee. It is a part of the 1S0212 Technical Committee. It has cancelled or replaced the first part (that is, I502123). 1-1) and approved by the following members: Belgium, France, Germany, Ireland, Italy, Poland, Portugal, Netherlands, Sweden, Switzerland, USA, Russia, the following countries issued this standard for different technical reasons. ! Scope National Standard of the People's Republic of China Radial drillag machlnes Testing of the arcpracyGB/T40111991 qISO 2423:1982 n17-83 This standard specifies the requirements and test methods for the accuracy and effectiveness of data evaluation. This standard is based on the following standards. The following standards are included in the standard. The provisions of this standard are included by citing them in the standard. When this standard is published, the version shown is the effective version. All industries that use this standard should consider using the following standards. The latest version of the standard is available. JH267--82 Metal Cutting Machine Tool Special Control 3-1 Requirements 3.1 Utilization rate standard, especially before the installation of the reference 2670. Precision inspection, the three-axis and its external air operation will still be small and the recommended precision seat of the test tool 3.2 When the measured length is different from the length specified in this standard: fill the difference 1H2570-82 2.≤.1.1 implementation, according to the length that can be measured. When the approximate result is less than 0.01mm, it is still calculated as 0.01mm. 3.3 In the "Inspection Method\" column of the production inspection form of this standard, if the position of the bed is not specified, the bed should be rotated to the lower position parallel to the machine tool. The bed and the upper auxiliary box should be controlled separately. 34. In the order of the layers, the products are arranged according to the limit. The inspection order is unchanged. In order to make the inspection of the installation inspection work more convenient, the inspection can be carried out according to the order of the total delivery. 3.5 According to the agreement between the user and the manufacturer, the inspection items can be increased. 4 Precision inspection 4.1 Precision inspection National Technical Supervision Bureau 1997-11-13 Approved 1998-07-61 Flag GB/T 4017 One-way press Base 1 ix: 1 Working surface From the south! In the 12C0 JB567582 inspection general rules this book's flat research and development and achievement have thought about studying this, level ruler, etc. stipulate that the horizontal position of the working bone and the flatness of the working surface are measured on the west side, and the bridge length —olefin exists blue, gold 1 X:3 peptide suffers from a drop: on the degree, it is the parallel b. 3. 2. 3 5.4.2.2. 2. 2 rule, etc., the working surface is pushed towards my direction, expanding the sunlight. CH/T 4017- 1997 Inspection of optical inspection In Zeyi Device, flat ruler Two on Monitoring setting=, 0.05 Dynamic fierce into China's semi sieve hole curved New 300bZxz.net United. Express insurance # Alliance B issued 0 5. 1 2. 2. 2. 2 Heart device vivid three · physical treatment and other currency depositors, 5 6. 1.2. 3 Kidney pillar help two kinds of finger fire GR/T 4017 Table (finished) Main combination n.20 Pure work Bean square move 5. 1c: West vertical South inner, —% general inspection rules Instructions:, :, 1. 2. 1 and>. b5. 1. 2, *, 2, , the benefits of standing by and then the kidney in turn from the Ding Ding to the upper part, ten : and the part of the straight wide inspection, 5.5.2.2.2 protection, therapeutic nature of the original extraction of the will 4.2T. Quick construction account quick clinical "Another way" GB/T1017--1997 as the role , Feng Du axis practice on the upper part of the work H# according to B2570 inspection pass must receive B5670 gold monitoring delivery|| tt||Wang County. Twist, plan, show sign. Measure in order to catch up with the busy ones, ten women's sales position; my account time product big release position meter on the spot workers text, Si Shi dynamic main sales , the main and auxiliary shrinkage point meter position do not enter the meter station allowed, should use ten installation in the room ~ shoot 1 surface: consumer department's special collection product self-find a display that can be used on the constant axis effect on the platform three degrees as the typical together with the nature, can come 1. as the medium of meter blood deformation. Life can be determined, of course you are determined , you can study more Appendix A + good sub Figure to complete the work or this Should be inspected for 1M Standard car, +% s:n4 H4171997 Jiang's time to 1 Axial force and drilling three-diameter system curve diagram .uu call, of course, the three types 2 tooth line country did not give less request to use the new head enterprise medium material beat position quantity one center time average road Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.