Some standard content:
1 heart_25.080.99
National Standard of the People's Republic of China
GB/T80641998
eqy1so6545:1992
Acccptance conditions for gear hobbing machines-Testing of theaccuracy
1998- 11- 18 Issued
1999-09-01 Implementation
Issued by the State Quality and Technical Bureau
FA/T8064-1598
This standard is based on GB/T 6545:19924 Acceptance Conditions for Roller Stepper Machines (October 3, 1992), the first edition of which is equivalent to the original international standard in terms of technical content. This standard is based on the provisions of GB/11.1-1993, and has added corresponding modifications to the specifications, references, terminology, transmission precision inspection, working condition inspection, etc. in the foreword, and has made corrections to the author's incorrect scientific expressions. The above standard is abbreviated in the form of format and text, and the inspection items are supplemented by the British standard. From the implementation of this standard, the replacement of G915-37 roll step.2B158-88.J6005-9/66-93 is proposed by the Ministry of Industry. This standard is drafted by the following units: Mao Qingtuan Mang Gear Machine Research Institute, Heavy Machine Tool Research Institute, Shaanxi First Machine Tool Factory, Shaanxi First Machine Tool Factory, Shaanxi First Instrument Research Institute, and the main drafters of this standard are Zhang Xiandeng, Zuo Hongbin, Zhang Xiachun, Kehu Yan, Qian Wenming, Shanhai Shun G8.T 80641995
IS Foreword
The International Organization for Standardization is the only international organization for standardization in the world. Its work is completed through technical committees. Each member organization with an interest in a topic has the right to express its own opinion on the technical committee established by the International Organization for Standardization. International organizations with related or non-international relations may also participate in this work. The European Commission has close cooperation with the International Commission on Safety of Standardization (IEC) on all aspects of the work of the International Organization for Standardization. The committee accepts the international standard proposal, and solicits opinions from members in the winter. The publication of the standard requires that at least 5 members be brought to the appropriate level. The international standard S0654 is 130TC:39. The scope of the machine tool technical committee is the SC general gold sales plan. The machine tool control test conditions are formulated by the product committee. The national standard of the People's Republic of China is the precision inspection of gear hobbing machines. GR/T8064—1998 ... GR/T817 1987 Digital Connection Rules wwW.bzxz.Net
GB10095—1988 Gradually Well Diagram Machine Tool C Wheel CB/109311--General Rules for Machine Tool Inspection Part 1: Machine Tool Inspection under No-load Finishing Conditions 3.3.3.4.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1.1 3.4 The inspection date specified in this standard does not need to be inspected all the time. Users can consult with the manufacturer to determine the inspection date of the items in the book according to their needs, but they must pay the required amount.
3.5 The precision inspection of this precision rolling is suitable for the precision rolling. The front speed of the suction feed during the flow is determined by the manufacturer according to the use requirements of the machine: 3.6 When the actual length is different from the visual determination in this standard, the difference between the determinations shall be in accordance with 2.3.1.1 of H10931.1-1S98. The minimum conversion difference is 00: m3.7. The difference calculation result is the optional revision of GTB170, which is refined to 0.001m. Approved by the State Quality and Technical Supervision Bureau on November 18, 1998 and implemented on September 1, 1999. 4 Terminology. Small building material. External support plan. T. Parts spindle. Change requirements. 5 Symbols. 5.1 Reference work. Free document corresponding department. Work stac.y rr:lumn
Work st-eriy alrrveny
Work atrndy
Worketbor
Axdl sdcway
Axial gldo
Tagt:sl y.ic.e
: Chutbuar. beerir.
Teaching examination on the dangerous river division state-owned light
GB/TB054-998
The main independent
Rotary axis
Division frequency specification
Division rod
Support deep moist version
Deep careful class
English support corresponding pollution
Ax of rorica
L.ve 1.ob spindid
Reiesene sitelt
Wuk-lab.e
Wurkpince
I:ul-x wulu wl:eel
Idex wuai
Wirk-stedly slile
Hnl:arbuc
5.2 Test piece
Image T. Parts and mold number:
Reference D number of teeth
Parts customer consideration drawing diameter:
Reference T including end mold effect;
Reference and other work stop 2 number of teeth.
Parts certificate indexing rigidity;
Test piece to the module;
Trial production Jiang gear teaching
Certificate width:
Wu Niu Xue indexing group diameter:
n..Test piece to the mold
Test door customer combustion rotation:
Turn dense gear research:
Test number of teeth.
5.3 Machine supply consultation
Machine tool measurement workpiece diameter;
Machine tool maximum mold teaching.
The low-frequency part of the machine tool precision test piece end speed
and speed transmission speed difference:
The high-frequency part of the speed transmission difference:
GB/T 8064—1998
The part proportional to the surface effect of the workpiece or the test piece
The part proportional to the end effect of the reference workpiece or the end face of the product
The low-frequency part of the tangential linear transmission error;-The western part of the tangential load characteristic error
The low-frequency part of the linear transmission error: The commercial part of the axial cutting error
The cumulative error of the ten teeth
The accumulated error of the pitch!
The slope error of the helix.
6 Geometric accuracy inspection
Upper table diameter
GHT S0EA
0.00, pstm
T. Accurate plane 9-n. 6X
On or four
-teaching axis otv society
Inter-industry
Workbench
Inspection method
General use GB/T: n932.: 1998
Test tools
Special in the relevant text
Extrusion type flat ruler 5.2
Disable the indicator
Big recorder set
Keep secret instructions to allow dangerous work.
T production is small T and so on T
In the real
Lightly press the real code
Hang the diameter of the big 1-:X:uu, 6. Bed
Each of them,
Beijing still shows the most visible number
T head folding display 5. 6. 1. 2. The steel ball of the instrument is set at 19% of the temporary control period, and the two indicators are set to measure the detection and the bracket, so that the indicator can measure the change of the number of layers in a rotation. The difference is calculated to indicate the actual difference position and the available price can be used to correct the total risk of the trip. 5. 6. 2. 2
Flat head indication
0.66 academic sales ball special
indicator Germany's actual work on the fence
month support
in the rotary risk item
adjusted the corresponding ball,
the workbench rotates on both sides
to perform the people,
the difference is calculated by the effective amount
large difference
external frame model work indicator stroke, product
GBT 8064
Working white
surface
external support
movement
working white
white can be pushed
line strict implementation
inspection single local history
inspection single core diagram G310931.1199%
relevant provisions
[Head fat R. 3. 3
3
Use the probe of this instrument and its working
to verify the most selective
check and adjust the position, the right and the same
), the grid point and its
equivalent point or the limit 1
to make two
measurements, and ensure that the indicator
number of the quantity is large
according to the version
car
out of the state
to||the main axis
axis section
ball head indication 5. 4. 2. 2. 3
Station inspection and selection
On the outer branch, draw a few
long stations near the stent through the surface, and lengthen them to the actual
) two levels of Lan A# and
according to the inspection rate, adjust the inspection and selection to the new level sequence position during pregnancy
.
Working rack club work itinerary
,"!, two face certificates
fast inspection, there is a fire mechanism: then
clamp the external light rack through the capital.
flat and flashing instructions love element style difference
self-work platform Sichuan medicine time practice
record only now record, out
outside branch generation tour two Heng to when the itinerary
at the beginning,! Each)
two flat and internal display of the selected number
all detect. Mistakenly in
it all benefit let
CD/T 8064-1998
Quality test·Intersection
External support bottle
Work platform with multiple support railings platform city large two work height, uu
Two-face inner distance, am
; shaft diameter, mn
External frame
Trend method
Month 31[-
There are requests
Ball head indication[5. 2. 2. 2
2 Method Point: The inspection cannot be carried out. Then the frame
is in operation G5.3. The current inspection
is carried out on the upper working table using a fixed indicator
and the type of support is: the optical probe is at the
maximum working height of the frame
planted 1
through the outer support hole
and the lower 1, two
places are made to turn
and the protection inspection is carried out, and the tight gear
is equipped with an external fireproof device. The bracket is measured by Lianda, the asset is to indicate this whole difference (not calculated by the method of multiple activities, the art is to check and adjust at 12 places, 2 for the year of lubrication of the axis outer bracket, the convex machine end is not regretful compared with the item of tire, the steam head cloth is required: .4.1, the tool inspection and monitoring is required according to the standard tool inspection and monitoring, the center can be special axis, push line, my, use + belt, fire north V
Align and cross!
Quality point rate is allowed when the center is actually m
indicating the measuring head in the north one standard white
(b two oil and glue
correct are all returned to the matter L, for a piece of point
to the work table hit this high.
In each continent six continent can be inspected
monitored to H empty to the hospital moving light position
, so that more·wen tea medical tight profit retreat again grab
test selection in 2) 5 for the place to carry out then| |tt||When there is a relative, it is necessary to take out the tight external
support the Xian measurement and reception reading
medical difference outside the support dyeing test
heart time indicator test number to beat the anti-counterfeiting meter
stop can be divided into 1 work and delivered in three times
product when the external support is tight and welcome
to age, the workbench will be transferred
1), 1) two small reading policies
warm Wudao head self-indicator source waste money charge
alliance report local product
GA/T B064—199B
According to the inspection method
of the external support
of each hole and the workbench
of the machine tool with extraction
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
of the machine tool
Only the main direction cannot be avoided (6. 1 item inspection and measurement are allowed. 1 point is set at 1 place on the electrical workbench, so that the probe is adjusted and tested quickly and accurately. L is the measuring point and the working point. The surface of the test piece is extended in each direction until the measurement is strictly averaged. The external points are inspected and adjusted by the probe at the network points respectively. If there is any case analysis, the external tester will be responsible for the teaching.
In addition to the error, the indicator reading at the time of the reverse inspection is calculated by adding the distance between the axis number and the reading. This measurement is also carried out on the workbench.
The head indicates 4.9..3.
According to the empty space, the instrument is selected to check the workbench rotation for half a month, and the safety limit is 0. R -/E.
This use area is 0. 4 -/ E. When the tunnel is moving at any distance, the compensation difference of 0.3,3 should be measured as the overcharge difference. The indicator should be fixed on the tool holder plate, and the measuring instrument should be adjusted to the radial direction of the test! The moving average should also be left, and the channel board should be averaged in all directions to ensure the trend. On the gear machine with group progress, the guide rail should be adjusted to the whole number of the selected indicator on the flat surface.
can be used when rotating between tables.
indication is used only for this measurement: the measurement is for the static and dynamic travel of the sliding frame in two directions, and the error of the indicator is measured in two planes for each 4 revolutions. a) The error of the indicator is measured in two planes:
GB/1 8064—1998
0. fiml rm
The tool spindle is equipped with a hole.
Strong heartbeat: 2)
Akirahahama
lead+absolute tour 25
2) An'
Ten finger department
heartbeat
confirmation method
$use R10x1.1199
call test tool
related documents
ball head indication 5.6--2
push to
device control purchase:
reverse trade, in the same direction of two entries
1 send out heat test ground transfer amount
yang entry, technical concentration check these three times
6 excellent difference plan, actual reference to
head shot indication 5.6.2.2
The maximum loss number of the equipment inspection and maintenance
anti-bed period
,
determines the real
total test peak center hole master training doctor.
Too small by the city! Determine
in two rivers and conduct tests
depth difference to indicate the six difference survival of the equipment solution.
design, main shaft auxiliary bearing existence time I
! + teaching sometimes does not exist through force
GD/T 8064—1998
movable support
donkey two feet
cross method
heart 1U93t.—998
about the year
ball meaning grab 5..1
device according to the monitoring
spindle axis default.8V inspection spot mixing
of the same degree
me, mm
a filling difference
only allowed to deviate forward:
worker's heart
to the thick knife ten
touch the same sleeve
line I parallel
shelf book maximum line management.mm||t t||At the same time, the rock is indicated by the foot, so that the measuring head can be as close to the movable text girl as possible and check the integrity. A small positive drawing line is set in each measuring direction to ensure the vertical position of the empty space and adjust it to the average position of its diameter. When the hole is opened, the worker can quickly collect the holes and check the integrity of the three auxiliary pressure tools on the foundation. The half of the rat can be rotated between the tool axis and the work quantity when the ball head indicates! 5.,2,2.5
medical indicator, make the head of the operation body,
point to the inside and check
standard, in each direction of measurement training these structures
check its diameter moving average
surface liquid
line to adjust to the weight vertical position,
if the rolling cut frame should be
solid bag. List the actual shape
read the effect.
plan light division state (:9) b)
surface indicator this number you plan
operation measurement
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.