title>SY 4032.5-1993 Petroleum Construction Project Quality Inspection and Assessment Standard Communication Engineering (Long Distance Telephone Exchange Equipment Installation Engineering) - SY 4032.5-1993 - Chinese standardNet - bzxz.net
Home > SY > SY 4032.5-1993 Petroleum Construction Project Quality Inspection and Assessment Standard Communication Engineering (Long Distance Telephone Exchange Equipment Installation Engineering)
SY 4032.5-1993 Petroleum Construction Project Quality Inspection and Assessment Standard Communication Engineering (Long Distance Telephone Exchange Equipment Installation Engineering)
Basic Information
Standard ID:
SY 4032.5-1993
Standard Name: Petroleum Construction Project Quality Inspection and Assessment Standard Communication Engineering (Long Distance Telephone Exchange Equipment Installation Engineering)
SY 4032.5-1993 Petroleum Construction Project Quality Inspection and Assessment Standard Telecommunication Engineering (Long Distance Telephone Exchange Equipment Installation Engineering) SY4032.5-1993 Standard Download Decompression Password: www.bzxz.net
Some standard content:
Standard for Quality Inspection and Evaluation of Petrolem Construction EngineeringTelecommunication Engineering(Toll Transit Switching EquipmentInstalling Engineering) $Y 4032.5—93 Editing department: China National Oil and Gas Corporation Infrastructure Engineering BureauApproving department: China National Petroleum CorporationImplementation date: May 1, 1994 Petroleum Industry Press 1994·Beijing Inspection before construction Iron frame processing project Self-guided Manual machine room frame installation project Coding equipment iron frame installation project Cable walkway installation project Cable trough installation project Long-distance large industrial switching equipment rack installation project -... Coding long-distance automatic switching equipment rack installation project switchboard. Business station security project Number system installation project Equipment marking project...· Cable bundling project, Welding cable core wire project Welding jumper wire project Main feeder line installation project In-row feeder line installation project: Rack lighting installation project Signal system debugging project Long-distance manual equipment testing project· Long-distance coding equipment testing project Other testing projects Appendix A Appendix B Quality assurance data for long-distance communication telephone exchange equipment installation project.|| tt||Quality inspection of long-distance telephone exchange equipment installers 1 (6) Appendix C Apparatus table· Explanation of terms used in this standard Additional explanation· Document of China National Petroleum Corporation (93) CNPC Technical No. 764 Notice on the approval and release of thirteen oil and gas industry standards including "Specifications for Construction and Acceptance of Natural Gas Gathering and Transmission Pipelines" To all relevant units: The draft of thirteen standards including "Specifications for Construction and Acceptance of Natural Gas Gathering and Transmission Pipelines" has been reviewed and approved, and is now approved as oil and gas industry standards and is hereby released. The bid numbers and names are as follows: SY 4066--93 SY/T 4067-93 SY/T4072—93 SY4032.1-93 5 SY 4032.2-93 6SY4032.3--93 Specification for construction and acceptance of natural gas gathering and transmission pipelinesSpecification for construction and acceptance of process pipelines in natural gas gathering and transmission stationsAsphalt expanded perlite anti-corrosion and thermal insulation steel pipe Standard for quality inspection and assessment of petroleum construction projectsCommunication projects (long-distance communication open line projects) (Replacement of SYJn4032—88) Standard for quality inspection and assessment of petroleum construction projects Program (urban telephone line projects) (Replacement of SYJn 4032—88) Communication Engineering Petroleum Construction Engineering Quality Inspection and Assessment Standard Communication Engineeringbzxz.net Engineering (Communication Pipeline Engineering) (Replace SYJn4032—88) 7 SY 4032.4-93 8 SY 4032.5-93 9 SY 4032.6--93 10 S 4032.7-93 11 SY 4032.8--93 12SY 4032.9—93 13 $Y 4032.10—93 Petroleum Construction Engineering Quality Inspection and Assessment Standard Communication Engineering (Long-distance Communication Open-line Carrier Telephone Installation Engineering) (Replace SYJn 4032-88) Petroleum construction project quality inspection and assessment standard Communication engineering (long-distance communication telephone exchange equipment installation project) (replaces SYJn4032-88) Petroleum construction project quality inspection and assessment standard Communication engineering (city telephone exchange equipment installation project) (replaces SYJn4032-88) Petroleum construction project quality inspection and assessment standard Communication engineering (city telephone program-controlled exchange equipment installation project) (replaces SYJn 4032-88) Petroleum Construction Project Quality Inspection and Assessment Standard Communication Engineering (Telecommunication Network Optical Fiber Digital Transmission System Engineering) (Replacing SYJn4032-88) Petroleum Construction Project Quality Inspection and Assessment Standard Communication Engineering (Digital Microwave Communication Engineering) (Replacing SYJn4032-88) Petroleum Construction Project Quality Inspection and Assessment Standard Communication Engineering (Communication Power Equipment Installation Engineering) (Replacing SYJm 4032-88) Five standards were promoted and implemented from May 1, 1994. China National Petroleum and Natural Gas Corporation November 26, 1993 1.0, 1 This standard applies to the quality inspection and assessment of the installation engineering of long-distance communication power switching equipment for new, built and rebuilt petroleum construction projects. Names of sub-items, sections and unit projects of long-distance telephone exchange equipment installation project Names of sub-items of long-distance telephone exchange equipment installation project Construction, material inspection Iron parts processing, racks, walkways and trough installation work Rack and equipment installation work Cable laying, binding and welding engineering Power line installation engineering Electrical performance commissioning engineering Names of sub-items Pre-construction inspection Iron parts processing engineering Manual machine room rack installation engineering Coding equipment rack installation engineering Cable walkway installation engineering Cable trough installation engineering Long-distance manual exchange equipment rack installation engineering Coding system Long-distance automatic exchange equipment rack installation Installation engineering switchboard: service station installation project signal system installation project equipment sign project micro-bundling cable project braiding and welding cable core wire project welding jumper project main feeder line installation project in-row feeder line installation project row rack lighting installation project signal system communication test project long-distance manual equipment test project long-distance coding equipment test project other test projects 1.0.2 The division of sub-items, sections and unit projects of long-distance communication telephone exchange equipment installation project shall comply with the provisions of SY4024-93 "General Rules for Quality Inspection and Assessment of Oil Construction Projects", and the names of sub-items, sections and unit projects shall comply with the provisions of Table 1.0.2. 1.0.3 While implementing this standard, the provisions of SY4024-193 "General Standards for Quality Inspection and Assessment of Petroleum Construction Projects" shall also be observed. 1.0.4 The main quality indicators and requirements of this standard are based on YDI41-86 "Technical Specifications for Construction and Acceptance of Long-distance Telephone Exchange Equipment Installation Projects" (hereinafter referred to as the specifications). 1.0.5 The quality assurance data for long-distance telephone exchange equipment installation projects shall comply with the provisions of Appendix A of this standard. 1.0.6 The measuring instruments and meters used in the inspection and assessment shall be within the validity period of the calibration. The names, specifications and models of the tools and meters shall comply with the provisions of Appendix B of this standard. 2 Pre-construction inspection 2.1 Basic items 2.1.1 The quality requirements for the construction conditions of the machine room and the exchange room, as well as their inspection methods and specified scores shall comply with Table 2.1.1. Quality requirements and inspection methods and specified scores for the construction conditions of the machine room and the exchange room The construction of the machine room and the exchange room should be completed, the paint and plastering should be completed, and the decoration should be completed The floor of the machine room should be flat and smooth, and the number and position of the reserved holes should meet the design requirements The size of the ground should meet the design requirements, the cover should be tight, and the power supply conditions exposed by the construction of the station room should have suitable ventilation, heating or air conditioning equipment for the room Note: This is the main item, the same below. Should be installed Inspect the quantity and inspect all. Inspection method Observation inspection Horizontal layer, tape measure Design verification Observation inspection Observation and Electrical inspection Table 2.1.1 Specified score 21.2 The quality requirements of main equipment and their inspection methods and specified score should comply with the provisions of Table 2.1.2. Inspection quantity, all inspections. Quality requirements of main equipment and their inspection methods and specified scores The number of groups, number of roots, wire diameters and quality of cable cores in the bureau should meet the design requirements The cable should not be broken or mixed, and the plastic sheath and core wire should be free of degradation, deformation, twisting and wrinkling The insulation resistance of the cable core should not be less than 20M per kilometer. The specifications of terminal boards and welding wire plugs should meet the design requirements, and the tin plating should be intact. The insulation resistance between relative terminals should not be less than 200M. Equipment and instruments with unqualified quality shall not be used in the project. Inspection method Inspect and check Use a meter! And observation and inspection 250V insulation: table Observation and inspection Use insulation resistance meter Check factory specifications Certification records 2.2 Pre-construction inspection sub-project quality inspection and evaluation table Table 2.1.2 Specified scores The pre-construction inspection sub-project quality inspection and evaluation table should comply with the unified format of Table 2.2.1. Wang Yanyou 1 Machine Exchange Main equipment 3 Iron frame processing engineering 3.1 Basic items Quality requirements for iron frame processing and its inspection quantity, inspection methods and specified points 3.1.1 The quality requirements for iron frame processing and its inspection quantity, inspection methods and specified points Quality requirements After processing, the iron parts must be straight, smooth, evenly painted, and the color must be consistent. For example, the size of the workpiece should meet the design requirements. The short bend and twisted iron parts should be free of cracks, and the curvature should meet the requirements of the construction drawings The eyelets should be straight, tapped and cut, Screws and threads should be inspected Number of inspections Inspection 10%, but less than 5 Random inspection 10%, but not required to be more than 3 Random inspection 10%, not less than 3 Inspection method Observation inspection Observation inspection Check drawings Observation inspection 3.2 Ironwork processing sub-item quality inspection and evaluation table 3.2.1 Format. Specified The ironwork processing sub-item quality inspection and evaluation table should comply with the unified standard in Table 3.2.1 Model rating -4 rht 一"*装 章玉持鞋 评价级 检验结果 Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.