title>GB/T 11606.5-1989 Environmental test methods for analytical instruments - Temperature change test - GB/T 11606.5-1989 - Chinese standardNet - bzxz.net
Home > GB > GB/T 11606.5-1989 Environmental test methods for analytical instruments - Temperature change test
GB/T 11606.5-1989 Environmental test methods for analytical instruments - Temperature change test
Basic Information
Standard ID:
GB/T 11606.5-1989
Standard Name: Environmental test methods for analytical instruments - Temperature change test
Standard ICS number:Test >> 19.040 Environmental Test
Standard Classification Number:Instruments and meters>>Material composition analysis instruments and environmental monitoring instruments>>N50 Material composition analysis instruments and environmental monitoring instruments comprehensive
GB/T 11606.5-1989 Environmental test methods for analytical instruments Temperature change test GB/T11606.5-1989 Standard download decompression password: www.bzxz.net
Some standard content:
National Standard of the People's Republic of China Environmental test method for analytical instruments Temperature change test The method of environmental test for analytical instrumentsChange of tcmperature test Subject content and scope of application GB11606.5—89 This standard specifies the grouping, test conditions and test methods of temperature change test for analytical instruments (hereinafter referred to as instruments). This standard is applicable to industrial process instruments or instruments used under harsh environmental conditions. 2 Temperature change test grouping 3 Test conditions 3.1 Requirements for test chambers (rooms) 3.1.1 The test chamber (room) should be able to provide the temperature specified in Chapter 2, with an allowable error of ±2°C. At the same time, the instrument should not be directly radiated by any heating and cooling elements. 3.1.2 The volume of the test box (room) should be three times the volume of the instrument. 3.2 Requirements for instruments When the working space of the test box (room) is not enough for the whole machine test, if the instrument allows, it can be connected to the whole machine in the form of a sub-unit to form a system for separate tests. bzxZ.net 4 Test method 4.1 Pretreatment Place the instrument under normal (or reference) environmental conditions to allow it to reach temperature equilibrium. 4.2 Initial inspection Inspect the instrument in accordance with the relevant standards. 4.3 Test 4.3.1 The instrument is placed in the test box (room). After the instrument works normally, it begins to cool down to the specified value (the cooling rate is less than 1℃/min). If there are no special requirements, it can also be heated first and then cooled down. 4.3.2 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. The temperature of the test box (room) is heated to the specified value (the average heating rate is less than 1℃/min). 4.3.3 4.3.4 After the instrument reaches the test duration, immediately inspect the instrument at this temperature. 4.3.5 The test duration should be selected from the following times: 2, 4, 8h. If there is no separate provision, it is 2h. 4.3.6 Temperature change test timing chart Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on March 25, 1989 and implemented on March 1, 1990 4.4 Recovery Normal temperature GB 11606.5-89 After the test, the instrument is placed in normal (or reference) environmental conditions to recover and reach temperature equilibrium. Final inspection Inspect the instrument in accordance with the provisions of the relevant standards. 5 Details to be specified when citing this standard Pretreatment; Items and requirements for initial inspection; Test duration: Special requirements for the sequence of temperature increase and decrease; Items and requirements for final inspection. Amendment No. 1 to GB/T11606.5-1989 "Temperature Change Test for Environmental Test Methods of Analytical Instruments" This amendment was approved and issued by the State Administration of Quality and Technical Supervision on July 19, 2000, and will be implemented from December 1, 2000. Published in the 9th issue of "China Standardization" in 2000. 1. Article 3.1.2 is revised as follows: "The volume of the test box (room) should be greater than 3 times the volume of the instrument." 10 Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.