National Standard of the People's Republic of China
GB50204—2002
Code for acceptance of constructional quality of concrete structures
2001—03—15 Issued
2002—04—01
Jointly issued by the Ministry of Construction of the People's Republic of China
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Page 1
National Standard of the People's Republic of China
Code for acceptance of constructional quality of concrete structures
50204-2002
Editor: China Academy of Building ResearchApproval department: Ministry of Construction of the People's Republic of ChinaEffective date March 2002
Page 2
Notice on the release of the national standard "Concrete structure engineering construction quality acceptance code" Jianbiao [2002] No. 63
According to the requirements of the Ministry of Construction's "Notice on Issuing the 1998 National Standard Formulation and Revision Plan (Second Batch)" (Jianbiao [1998] No. 244), the China Academy of Building Research, together with relevant units, has revised the "Concrete structure engineering construction quality acceptance code". Our ministry organized relevant departments to review the code and now approved it as a national standard with the code number GB50204-2002, which will be implemented on April 1, 2002. Among them, 4.1.1, 4.1.3, 5.1.1, 5.2.1, 5.2.2, 5.5.1, 6.2.1, 6.3.1, 6.4.4, 7.2.1, 7.2.2, 7.4.1, 8.2.1, 8.3.1, 9.1.1 are mandatory provisions and must be strictly enforced. The original "Concrete Structure Engineering Construction and Acceptance Code" GB50204-92 and "Precast Concrete Component Quality Inspection and Evaluation Standard" GBJ321-90 are abolished at the same time. The Ministry of Construction is responsible for the management and interpretation of the mandatory provisions of this code, the China Academy of Building Research is responsible for the interpretation of the specific technical content, and the Standard and Quota Research Institute of the Ministry of Construction organizes the China Building Industry Press to publish and distribute it. Ministry of Construction of the People's Republic of China
March 15, 2002
Page 3
This specification is based on the requirements of the Ministry of Construction's "Notice on Issuing the 1998 National Standard Formulation and Revision Plan (Second Batch)" (Jianbiao [19981244]), and was revised by the China Academy of Building Research in conjunction with relevant units from Chapter 5 of the "Construction Engineering Quality Inspection and Assessment Standard" GBJ301-88, the "Precast Concrete Component Quality Inspection and Assessment Standard" GBJ321-90, and the "Concrete Structure Engineering Construction and Acceptance Code" GB50204-92.
During the revision process, the compilation team carried out special research and engineering pilot applications, conducted relatively extensive investigations and studies, summarized the practical experience of my country's concrete structure engineering construction quality acceptance, adhered to the guiding principles of "separation of inspection and assessment, strengthening acceptance, improving means, and process control", and widely solicited opinions from relevant units in various ways, and finally finalized after review.
The main contents of this specification are: the acceptance standards, contents and procedures for the construction quality of concrete structure engineering and its sub-projects; the quality management and quality control requirements of the construction site; witnessing and sampling inspection involving structural safety. This specification may need to be partially revised in the future. The information and content of the relevant partial revisions will be published in the "Engineering Construction Standardization" magazine.
The provisions marked with boldface in this specification are mandatory and must be strictly enforced. In order to improve the quality of the specification, all units are requested to pay attention to summarizing experience and accumulating information in the process of implementing this specification, and feedback relevant opinions and suggestions to the China Academy of Building Research (address: No. 30, North Third Ring Road East, Beijing; postal code: 100013; E-mail:
[email protected]) at any time for reference in future revisions. The editorial unit, participating units and main drafters of this specification are as follows: Editorial unit: China Academy of Building Research Participating units: Beijing Construction Engineering Group Co., Ltd. Beijing Urban Construction Group Co., Ltd. Concrete Branch Beijing Construction Engineering Quality Supervision Station
Shanghai First Construction Co., Ltd.
China Construction First Engineering Bureau Fifth Construction Company National Construction Engineering Quality Supervision and Inspection Center Chinese People's Liberation Army Engineering Quality Supervision Station Beijing Municipal Construction Commission Development Office
Main drafters: Xu Youlin Cheng Zhijun Bai Shengxiang Han Sufang Ai Yongxiang Li Dongbin Zhang Yuanbo Lu Laijun Ma Xingbao Gao Xiaowang Page 4
Ma Hongye
Peng Shangyin| |tt||Zhou Leijian
Zhai Chuanming
Page 5
Basic provisions
Formwork sub-project
4.1 General provisions
4.2 Formwork installation..
4.3 Formwork removal..
Reinforcement sub-project
General provisions
Raw materials..
Reinforcement processing
Reinforcement connection,
Reinforcement installation
Prestressed sub-project.
General provisions,
Raw materials..
Manufacturing and installation
Tensile tensioning and tensioning
Grouting and anchoring
Concrete sub-project
General provisions
Raw materials.
Mix ratio design
Concrete construction
8 Cast-in-place structure sub-project,
8.1 General provisions
8.2 Appearance quality
8.3 Dimensional deviation
9 Prefabricated structure sub-project
Page 6
General provisions
Prefabricated components
Structural performance inspection
Prefabricated structure construction
Concrete structure sub-division project,
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Structural entity inspection,
Concrete structure sub-division engineering acceptance
Quality acceptance record
Minimum lap length of longitudinal force reinforcement
Structural performance inspection method of prefabricated components
Strength inspection of test pieces cured under the same conditions for structural entity inspection Inspection of thickness of protective layer of structural reinforcement
Explanation of terms and phrases used in this specification
Page 7
1 General
1.0.1 This specification is formulated to strengthen the quality management of construction projects, unify the acceptance of the construction quality of concrete structure projects, and ensure the quality of projects.
1.0.2 This specification applies to the acceptance of the construction quality of concrete structures in construction projects, and does not apply to the acceptance of the construction quality of special concrete structures.
1.0.3 The requirements for construction quality in the contract and engineering technical documents of concrete structure projects shall not be lower than those specified in this specification.
1.0.4 This code shall be used in conjunction with the national standard "Uniform Standard for Acceptance of Construction Quality of Building Engineering" GB50300-2001.
1.0.5 In addition to implementing this code, the acceptance of the construction quality of concrete structure engineering shall also comply with the provisions of the relevant national standards in force.
Page 8
2 Terms
Concrete structure
concrete structure
Structure made mainly of concrete, including plain concrete structure, reinforced concrete structure and prestressed concrete structure.
2.0.2 Cast-in-situ concrete structure is the abbreviation of cast-in-situ concrete structure, which is a concrete structure that is cast on site and cast as a whole. 2.0.3 Prefabricated structure prefabricated concrete structure is the abbreviation of prefabricated concrete structure, which is a concrete structure that is assembled and connected with prefabricated components as the main load-bearing components.
2.0.4 Defectsdefect
Inspection items or inspection points in the construction quality of construction projects that do not meet the specified requirements can be divided into serious defects and common defects according to their severity.
2.0.5 Serious defectsseriousdefect
Defects that have a decisive impact on the stress performance or installation and use performance of structural components. commondefect
2.0.6 Common defects
Defects that have no decisive impact on the stress performance or installation and use performance of structural components. 2.0.7 Construction joint constructionjoint The joint formed between the concrete poured first and the concrete poured later during the concrete pouring process due to the design requirements or construction needs of the segmented pouring.
2.0.8 Inspection of structural performance Inspection of various indicators such as the bearing capacity, deflection, and crack control performance of structural components. Page 9
3 Basic provisions
3.0.1 The quality management of the concrete structure construction site should have corresponding construction technical standards, a sound quality management system, construction quality control and quality inspection system. Concrete structure construction projects should have construction organization design and construction technical plans, which should be reviewed and approved. 3.0.2 Concrete structure sub-division projects can be divided into two categories according to the construction method of the structure: cast-in-place concrete structure sub-division projects and prefabricated concrete structure sub-division projects: according to the classification of the structure, they can also be divided into reinforced concrete structure sub-division projects and prestressed concrete structure sub-division projects. Concrete structure sub-division projects can be divided into formwork, steel bars, prestressed, concrete, cast-in-place structure and prefabricated structure sub-division projects.
Each sub-project can be divided into several inspection batches according to the principle of being consistent with the construction method and convenient for controlling the construction quality, based on the work shift, floor, structural joint or construction section. 3.0.3 The quality acceptance of the concrete structure sub-division project shall be based on the qualified acceptance of related sub-projects such as steel bars, prestressed concrete, cast-in-place structures or prefabricated structures, and quality control data inspection and visual quality acceptance shall be carried out, and witness inspection or structural entity inspection shall be carried out on the materials, test pieces, construction processes and important parts of the structure involving structural safety.
3.0.4 The quality acceptance of the sub-project shall be based on the qualified acceptance of the inspection batches contained therein, and the quality acceptance record shall be checked.
3.0.5 The quality acceptance of the inspection batch shall include the following contents: 1 Physical inspection shall be carried out in the following manner:
1) The on-site re-inspection of raw materials, components, accessories, appliances and other products shall be carried out according to the sampling inspection plan for the batches and products entering the site;
2) The strength of concrete, structural performance of prefabricated components, etc. shall be carried out according to the sampling inspection plan specified in the current national standards and this code;
3) For items in this code that are inspected by counting, the inspection shall be carried out according to the qualified point rate of the total number of points sampled. 2. Data inspection, including product certificates of raw materials, components and appliances (quality certification documents in Chinese, specifications, models and performance test reports, etc., as well as on-site re-inspection reports, self-inspection and handover inspection records of important processes during construction, sampling inspection reports, witness inspection reports, hidden project acceptance records, etc. 3.0.6 The quality of the inspection batch shall meet the following requirements: 1. The quality of the main control items shall be qualified after sampling inspection; 2. The quality of the general items shall be qualified after sampling inspection; when counting inspection is adopted, unless there are special requirements, the qualified point rate of a general item shall reach 80% or more, and there shall be no serious defects; 3. Have complete construction operation basis and quality acceptance records. For the inspection batch that has passed the acceptance, it is advisable to make a qualified mark. 3.0 .7 The quality acceptance of inspection batches, sub-projects, and concrete structure sub-divisions may be recorded in accordance with Appendix A of this Code. The quality acceptance procedures and organization shall comply with the provisions of the national standard "Uniform Standard for Construction Quality Acceptance of Building Engineering" GB50300-2001
4 Formwork sub-project
4.1 General provisions
4.1.1 The formwork and its support shall be designed according to the conditions such as the project structure form, load size, foundation soil type, construction equipment and material supply. The formwork and its support shall have sufficient bearing capacity, rigidity and stability, and be able to reliably withstand the weight of poured concrete, lateral pressure and construction load. 4.1.2 Before pouring concrete, the formwork project shall be inspected and accepted. When installing the formwork and pouring concrete , the formwork and its support should be observed and maintained. When an abnormal situation occurs, it should be handled in time according to the construction technical plan. 4.1.3 The order and safety measures for removing the formwork and its support should be implemented according to the construction technical plan. 4.2 Formwork installation
Main control items
4.2.1 When installing the upper formwork and its support of the cast-in-place structure, the lower floor slab should have the bearing capacity to withstand the upper load, or additional supports should be added; the columns of the upper and lower supports should be aligned, and pads should be laid. Inspection quantity: full inspection.
Inspection method: Observe against the formwork design documents and construction technical plan 4.2.2 When applying the formwork isolation agent, the steel bars and concrete joints must not be contaminated. Inspection quantity: full inspection.
Inspection method: Observation .
General items
4.2.3 The installation of formwork shall meet the following requirements: 1 The joints of the formwork shall not leak; before pouring concrete, the wooden formwork shall be watered and moistened, but there shall be no water accumulation in the formwork;
2 The contact surface between the formwork and the concrete shall be cleaned and coated with an isolating agent, but an isolating agent that affects the structural performance or hinders the construction of decorative works shall not be used; 3 Before pouring concrete, the debris in the formwork shall be cleaned; 4 For plain concrete projects and decorative concrete projects, formwork that can achieve the designed effect shall be used. Number of inspections: All inspections.
Inspection method: Observation.
4.2.4 The floor, tire formwork, etc. used as formwork shall be flat and smooth, and shall not produce sinking or cracks that affect the quality of the components. Page 121 The formwork and its support should be designed according to the conditions such as the engineering structure, load size, foundation soil type, construction equipment and material supply. The formwork and its support should have sufficient bearing capacity, rigidity and stability, and can reliably bear the weight of poured concrete, lateral pressure and construction load. 4.1.2 Before pouring concrete, the formwork project should be inspected and accepted. When installing the formwork and pouring concrete, the formwork and its support should be observed and maintained. When abnormal conditions occur, they should be handled in time according to the construction technical plan. 4.1.3 The order and safety measures for removing the formwork and its support should be implemented according to the construction technical plan. 4.2 Formwork installation
Main control items
4.2.1 When installing the upper formwork and its support of the cast-in-place structure, the lower floor slab should have the bearing capacity to bear the upper load, or additional supports should be added; the columns of the upper and lower supports should be aligned, and pads should be laid. Inspection quantity: full inspection.
Inspection method: Observe against the template design documents and construction technical plan 4.2.2 When applying the template isolation agent, the steel bars and concrete joints must not be contaminated. Inspection quantity: All inspections.
Inspection method: Observation.
General items
4.2.3 The installation of the template should meet the following requirements: 1 The joints of the template should not leak; before pouring concrete, the wooden template should be watered and moistened, but there should be no water accumulation in the template;
2 The contact surface between the template and the concrete should be cleaned and the isolation agent should be applied, but the isolation agent that affects the structural performance or hinders the construction of the decoration project should not be used; 3 Before pouring concrete, the debris in the template should be cleaned; 4 For the plain concrete project and the decorative concrete project, the template that can achieve the design effect should be used. Inspection quantity: All inspections.
Inspection method: Observation.
4.2.4 The floor and formwork used as templates should be smooth and clean, and should not have sinking or cracks that affect the quality of the components. Page 121 The formwork and its support should be designed according to the conditions such as the engineering structure, load size, foundation soil type, construction equipment and material supply. The formwork and its support should have sufficient bearing capacity, rigidity and stability, and can reliably bear the weight of poured concrete, lateral pressure and construction load. 4.1.2 Before pouring concrete, the formwork project should be inspected and accepted. When installing the formwork and pouring concrete, the formwork and its support should be observed and maintained. When abnormal conditions occur, they should be handled in time according to the construction technical plan. 4.1.3 The order and safety measures for removing the formwork and its support should be implemented according to the construction technical plan. 4.2 Formwork installation
Main control items
4.2.1 When installing the upper formwork and its support of the cast-in-place structure, the lower floor slab should have the bearing capacity to bear the upper load, or additional supports should be added; the columns of the upper and lower supports should be aligned, and pads should be laid. Inspection quantity: full inspection.
Inspection method: Observe against the template design documents and construction technical plan 4.2.2 When applying the template isolation agent, the steel bars and concrete joints must not be contaminated. Inspection quantity: All inspections.
Inspection method: Observation.
General items
bzxZ.net4.2.3 The installation of the template should meet the following requirements: 1 The joints of the template should not leak; before pouring concrete, the wooden template should be watered and moistened, but there should be no water accumulation in the template;
2 The contact surface between the template and the concrete should be cleaned and the isolation agent should be applied, but the isolation agent that affects the structural performance or hinders the construction of the decoration project should not be used; 3 Before pouring concrete, the debris in the template should be cleaned; 4 For the plain concrete project and the decorative concrete project, the template that can achieve the design effect should be used. Inspection quantity: All inspections.
Inspection method: Observation.
4.2.4 The floor and formwork used as templates should be smooth and clean, and should not have sinking or cracks that affect the quality of the components. Page 12