This standard specifies the safety requirements for the classification of hoisting operations and the management of hoisting safety operation certificates. This standard applies to hoisting operations within the production area of chemical enterprises. HG 23015-1999 Safety regulations for hoisting operations in factory areas HG23015-1999 Standard download decompression password: www.bzxz.net
Some standard content:
Chemical Industry Standard of the People's Republic of China HG23011~23018—1999 Safety Regulations for Factory Operations in Chemical Enterprises Published on September 29, 1999 Implementation on March 1, 2000 Published by the State Administration of Petroleum and Chemical Industry Registration No.: 41131999 HC23015—1999 This standard is formulated based on the safety requirements for the hoisting industry in the production area of chemical enterprises. The appendix of this standard is the standard requirements, which is published by the Ministry of Chemical Industry of the People's Republic of China. This standard was issued by the Chemical Safety Professional Committee of the China Chemical Industry and was approved by the Technical Committee of the Standard. The responsible person for the development of this standard is Panneng Liaohe Co., Ltd. The main contributors of this standard are Gao Peifu and Bao Mianliang. This standard is entrusted to the Chinese Society of Chemical Industry to be issued by the whole professional committee for interpretation. 1 Scope Chemical Industry Standard of the People's Republic of China Safety Code for Hoisting Operations in Factory AreasbZxz.net The Safety Code for E.iftiag in Workpluce HG23015—1999 This standard specifies the classification and classification of hoisting operations, operation safety requirements and the management of hoisting safety operation certificates. This standard applies to hoisting operations in the production area of chemical enterprises. 2 Referenced Standards The supplements contained in the following standards constitute the provisions of this standard through reference in this standard. When this standard was published, the versions shown were valid. All standards were revised by consensus. Parties using this standard should consider the possibility of using the latest versions of the following standards. GR28:1—89 Safety margin GR5CR2—3 Lifting and pushing low HG/T23C0日92化T. Inspection and management inspection standard HG230141999" Area height operation safety regulations HG23011-1999J Area hot work safety regulations 3 Definition This standard adopts the following definitions: Lifting operation The process of lifting heavy objects and changing the position of the heavy objects using various machines and tools. 4. Classification and classification of lifting operations 4.1 Classification of lifting operations Lifting operations are divided into three categories according to the quality of the lifting objects: when the quality of the lifting objects is less than or equal to 4Ct, it is a Class I lifting operation; when the quality of the lifting objects is less than 4Ct, it is a Class III lifting operation. 4.2 Classification of lifting operations Lifting operations are divided into three categories according to the level of lifting operations: Class I lifting operations are large lifting operations; Class II lifting operations are small lifting operations; and Class III lifting operations are general lifting operations. 5 Safety requirements for hoisting operations 5.1 Hoisting operators must hold a special type of work permit. Objects with a mass greater than 14t must obtain a hoisting safety operation permit: State Petroleum and Chemical Industry Bureau 1999-09-29 Issued 2000-03-01 Implementation HG230151999 For the format of the safety operation permit, see Appendix A. 5.2 For objects with a mass greater than 401, a hoisting construction plan should be prepared. For objects with a mass less than 401 but with complex shapes, small diameters, and flat surfaces, and special working conditions, a hoisting construction plan should be prepared. If the construction plan is not completed, it shall be implemented after being reviewed by the competent department and the safety and technical department and reported to the factory or the chief engineer for approval. 5.3 Before lifting operations, safety supervision signs should be set up at the lifting site and special personnel should be assigned to supervise. Non-construction personnel are prohibited from entering the site. 5. During lifting operations, there should be sufficient lighting. When working outdoors, it should be stopped when it rains heavily or more than six boards at night. 5.5 During the lifting operation, personnel must take safety precautions and comply with the provisions of (B2811. When working at height, they should avoid the provisions of "T23014". 5.6 Before the lifting operation, the lifting equipment, hook wire, breeze rope, prohibition bar, hanging and other machines and tools should be checked and ensured to be reliable. The use of sexually transmitted diseases is not allowed. 5.7 During the lifting operation, the positions must be clearly divided and adhered to: and the path finding signals and screening indicators of (5082) must be followed. 5.8 It is forbidden to use pipelines, poles, electromechanical equipment, etc. as lifting anchor points. The construction department shall apply for the calculation of the new and special buildings. Buildings and sexual buildings shall not be used as endpoints. 5.9 During the lifting operation, the remote parts of each and every lifting machinery must be checked for safety and Detailed safety instructions shall be given to the hoisting equipment and rigging. The safety equipment after installation shall be reliable. Before installation, a test lift shall be conducted to confirm that there is no setback before operation. 5.0 No one shall accompany the lifting of objects or lifting machines. Under special circumstances, if dangerous lifting is necessary, appropriate safety measures shall be taken and approved by the personnel in charge: 5.1 When the lifting operation site needs to be operated, the provisions of 11G23011 shall be followed: The ground cables, high-frequency electricity, and high-frequency power cables at the lifting operation site shall be avoided, and the product shall be kept at a high level. 5.12 When using standard lifting machinery (such as tire cranes, bridge cranes, etc.), in addition to complying with the wooden standards, the operating regulations of the special machinery shall also be followed. E.13 When installing, the installation shall be carried out in accordance with the regulations and the equipment shall be of good quality. , only use after calculation, and it is strictly forbidden to operate with overload. When the lifting capacity of the object is determined by the certificate or the board, the actuator should be checked, and the old low-degree and short-stroke test currency should be carried out. 5.14 Personnel are prohibited from standing under the object, and 5.15 Personnel are prohibited from lifting during work. The following situations shall not be allowed: a. The command letter card is technical, The state is still carrying or the object is unknown "Newly pulled creature: ! Insufficient, chaotic objects: or people standing under the object: 1 Heavy objects 1! In the underground Flat objects are not firm, mixed and tangled, and not evenly filtered: h The school has no discussion of the situation; Heavy people cloud: The whole world is full of spirit 5.16 In addition, the whole length of the installation must be in accordance with the book The contents of the operation permit shall be strictly followed, and the contents of the operation shall be strictly collected and transferred, and the scope of the operation shall be expanded. 5.17 If the lifting fee is not reviewed continuously, the safety instructions are not implemented, and the working environment does not meet the safety requirements, the operating personnel have the right to point out the existence of the business 63 Management of the network installation safety certificate 5 Lifting safety "business or department, quality management, 30 HG230151999 6.2 After the person in charge of the project unit receives the installation safety operation permit from the mobile department, he shall carefully write down all the contents and submit it to the person in charge of the construction unit for approval. For the lifting operations specified in 5.2 of this standard, a lifting plan must be signed, and the completed lifting safety operation permit and the lifting plan shall be submitted to the person in charge of the mobile department for approval. 6.3 The person in charge of the project shall hand over the lifting safety operation certificate to the operating personnel. The operating personnel shall check the lifting safety operation certificate and confirm that it is correct before operating. 31 Hoisting personnel Working time Different contents Safety system: Responsible person of the safety department: (Signature) Responsible person of the construction department: Signed the approval opinion of the mobile department H Xin 23015-1999 Time Sang A (Appendix of the standard) Hoisting safety operation certificate Table 41 Hoisting safety operation certificate Tool name Standard commander (personnel voice) Item one-line person in charge: (words) Implementation one-line person in charge: (Signature) Mobile department person in charge: (words)) Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.