title>Gas-filled microwave switching tubes,Type RX-7 - SJ 2245-1982 - Chinese standardNet - bzxz.net
Home > SJ > Gas-filled microwave switching tubes,Type RX-7
Gas-filled microwave switching tubes,Type RX-7

Basic Information

Standard ID: SJ 2245-1982

Standard Name:Gas-filled microwave switching tubes,Type RX-7

Chinese Name: RX-7型微波气体放电管

Standard category:Electronic Industry Standard (SJ)

state:in force

Date of Release1982-12-26

Date of Implementation:1983-07-01

Date of Expiration:2010-01-20

standard classification number

Standard Classification Number:General>>Standardization Management and General Provisions>>A01 Technical Management

associated standards

Publication information

other information

Introduction to standards:

SJ 2245-1982 RX-7 type microwave gas discharge tube SJ2245-1982 standard download decompression password: www.bzxz.net



Some standard content:

Ministry of Electronics Industry of the People's Republic of China Standard SJ2245-82
RX-7 type microwave gas discharge tube
1982-12-22 Issued
1983-07-01 Implementation
Ministry of Electronics Industry of the People's Republic of China
Ministry of Electronics Industry of the People's Republic of China Standard RX-7 type microwave gas discharge tube
SJ2245-—82
This standard applies to RX-7 type microwave gas discharge tube (hereinafter referred to as "switch tube"), which belongs to the external cavity type high Q adjustable frequency receiving protection switch tube. With different cavities, it can be used in radar equipment in S~L bands. This standard is a supplement to the general technical conditions for microwave gas discharge tubes (SJ34373) (hereinafter referred to as "general technology"). Except for the contents specified in this standard, the rest shall be implemented in accordance with the relevant provisions of the general technology. 1. Dimensions
The dimensions of the switch tube shall comply with the provisions of Figure 1. 2 Parameter specification
The parameters of the switch tube shall comply with the provisions of the parameter specification table. 3 Glass and metal sealing test
Take 10 switch tubes (it is allowed to take tubes with some items of the same process that are unqualified, but the ignition current must be qualified) for a single glass and metal sealing test. The switch tube does not have a dedicated cavity during the test. After the test, no more than 1 unqualified switch tube is qualified. Otherwise, double the number of switch tubes should be taken for retest, and no more than 1 unqualified switch tube is qualified. When all the switch tubes are qualified in the first quarterly (or three consecutive months) test, the test will not be carried out again this year. Otherwise, it shall be carried out according to the general technical.
4 Impact test
The acceleration is 5g, the impact frequency is 50-70 times/min, and the impact is 500 times in the vertical and horizontal directions. 5 Low temperature test under working state
Under the condition of ambient temperature of -55±2℃, after maintaining for 30 minutes, add ignition voltage and high power to measure the amplitude recovery time.
6 High temperature test under working condition
After maintaining the ambient temperature at 70±2°C for 30 minutes, add the ignition voltage and high power to measure the wave tip energy.
7 Amplitude recovery time
7.1 The amplitude recovery time is calculated based on the attenuation of the receiving signal by the switch tube as 3dB. Ministry of Electronics Industry of the People's Republic of China issued on December 22, 1982 and implemented on July 1, 1983
SJ2245-—82
72 The frequency of the detection signal is the center frequency of the tested switch tube. 8 Relaxation oscillation
When the ignition current is greater than 4euA, no harmful relaxation oscillation with an amplitude reaching the zero line should be observed on the oscilloscope (see Figure 2).
9 Tuning times test
The switch tube should be able to withstand 12 tunings. According to the mechanical position, one from one extreme to the other is one time. Electrical parameter test chamber of switch tube
When the switch is tested in electrical parameters, the chamber shall be selected according to the provisions of Appendix A. The rated current range shall be selected from the chamber of Yanglu A (!). The no-load quality factor shall be selected from the chamber of Appendix A (1). The frequency coefficient shall be selected from the chamber of Appendix A (1). The total leakage power shall be selected from the chamber of Appendix A (2). The peak energy test shall be selected from the chamber of Yinlu A (2). The amplitude recovery time shall be selected from the chamber of Appendix A (2). 11 When the output of switch tube is less than 100 pieces per quarter (or for 3 consecutive months), the routine test shall be carried out once every half year (or for 6 consecutive months). The test shall be carried out in accordance with Articles 17, 18, and 19 of the General Technical Specification (SJ343-73) and Article 3 of this standard.
12 When the output of switch tube is less than 100 pieces per quarter (or for 3 consecutive months), the life test shall be carried out once every half year (or for 6 consecutive months). The test is carried out in accordance with Article 22 and Article 23 of the General Technical Specification (SJ343-73). 13 Life test of switch tube
131 The life test of switch tube is a static life test. 13.2 During the life test, the standard life parameters are tested at 200, 267, 320, 360 and 400 hours respectively.
SJ2245-82
13.3 See Appendix B (Supplement) for the principle diagram of life test. 14
Tube weight
The weight of switch tube is inspected once a year.
15 After the switch tube is packaged and transported and bumped, the ignition current and frequency tuning range shall comply with the provisions of the parameter specification table.
16 Article 5, paragraph (2) of the General Technical Specification (SJ343--73) is not applicable to this standard. 590420
Steam quality dream
¥268+02
Appearance drawing
SJ2245-82
Appendix A
Cavity diagram
(supplement)
++*0+89\81.0+zS
Equipment system and limit#
Parameters and test name
External dimensions
Energy Time
Ignition phone
Full range of events
Total equipment performance
Individual report
Number of quality medical data
Resolution recovery time
Crest energy plate
Morning temperature collection data
Exploration test and qualitative test
Flame battery
Instrument intensity test
Flame battery
Impact test|| tt||Burning current
Low-temperature test
Total full load motor vehicle
Lubrication test
Total lubrication rate
SJ2245--82
RX-7 type micro-liquid gas fault tube parameter combustion model test
Joint impact protection technique
Repetitive frequency
30005001003
350±30
500~ 500
Ye Kuansheng
350±351±0,1
500~800
350±351±0,1
3000500800
350±351±0.1
3900(500~600,350±$51±0,1
Maintaining power station
#Cheng battery
Yu Ran Electric
Shuangli Pipe State ElectricwwW.bzxz.Net
EL-PErs
Test acceptance regulations
Parameters and test names
Low-power commissioning under soft working state
Extreme recovery time
High-power test under winning working state
Spike energy
Full-time test
Ignition battery
Tube base rate national test||tt ||Our project and the national sealing test
Ignition test
Life test
Life test standard
Total device overload
SJ2245-82
RX-7 type wave gas failure tube parameter version table continued installation
Wangshen chicken car
Re-send network half
500800$50±35
509~800.350 ±35
00050000250±35
Use limit value
Limit reserve
Mondamee
Most Miss
10001000120
Medical Chongyi Seat
#Installation and delivery
UMC Medical
Hand welding electrical appliances
Micro tube standard
Et-srirs
Test Yanfangda
Yan Acquisition
307(2)
8:15
Chengyanzhi
SJ2245-82
Appendix B
Static Life Test Schematic Diagram
(Supplement)
Note, ① The current limiting resistor R1 is 47MQ, the current limiting resistor value R is 510kQ, the negative voltage is 800V to 1000V, and the current is 120μA. K
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.