Basic Information

Standard ID: JB/T 5122-1991

Standard Name: ZG1 series single-acting plunger hydraulic cylinder

Chinese Name: ZG1系列单作用柱塞式液压缸

Standard category:Machinery Industry Standard (JB)

state:in force

Date of Release1991-05-18

Date of Implementation:1992-01-01

standard classification number

Standard Classification Number:Machinery>>General Parts>>J20 Hydraulic and Pneumatic Devices

associated standards

alternative situation:NJ 148-79

Publication information

other information

Focal point unit:Chinese Academy of Agricultural Mechanization Sciences

Publishing department:Chinese Academy of Agricultural Mechanization Sciences

Introduction to standards:

This standard specifies the type, basic parameters, connection dimensions and technical conditions of ZG1 series single-acting plunger hydraulic cylinders. This standard applies to plunger cylinders used in hydraulic transmission of agricultural machinery, and also to plunger cylinders used in hydraulic transmission of other machinery. JB/T 5122-1991 ZG1 series single-acting plunger hydraulic cylinders JB/T5122-1991 Standard download decompression password: www.bzxz.net

Some standard content:

Mechanical Industry Standard of the People's Republic of China
JB 5122—91
ZG1 Series Single-Acting Plunger Hydraulic Cylinder
Published on 1991-05-18
Published by the Ministry of Machinery and Electronics Industry of the People's Republic of China
Implemented on 1992-01-01
Mechanical Industry Standard of the People's Republic of China
G1 Series Single-Acting Plunger Hydraulic Cylinder
Subject Content and Scope of Application
JB5122
This standard specifies the specifications, basic parameters, connection dimensions and technical conditions of 2G1 series single-acting plunger hydraulic cylinders (hereinafter referred to as plungers).
This standard is mainly applicable to agricultural machinery, and also to other mechanical transmission pistons. 2 Reference standard G1282 Batch inspection counting sampling process: card and table (for continuous batches) 3 Type. Basic integers and dimensions 3.1 Working pressure: 16MPa, 2C MPa 3.2 The diameter and stroke of the saddle should be consistent with Table 1. Table 3.3 The connection type of the red body end and the saddle end is single three-ring type and single earring type. Single earring approved by the Ministry of Machinery and Electronics Industry on May 18, 1991. The connection dimensions shall conform to the requirements of Figure 1 and Table 2. The earring shall be implemented in 1992-61-C1. B5122-91. 3.4 The installation dimensions of the oil port screw and the plunger cylinder shall conform to the requirements of Figure 2 and Table 3. 2. :215
Note: Use the combined length and fastener,
3.5Product model code
JB5122-91
20-0X0-日
Column end connection type code
Single earring-omitted
Single fastener-E
Cylinder connection type code
Single earring-omitted
Stroke, ar
True diameter of plug, mm
Rated force is IGMP
Series No.
:ZG1--E6GX500
Single-acting plug-type hydraulic pressure
Indicates rated force is 6MPa, plug diameter is 50mm, stroke is 500mm, single-acting hydraulic pressure ... 4.3.1 The minimum starting force shall not exceed 100 μm, 4.3.2 The plunger shall not leak when in a static state; 4.3.3 Pressure resistance: Under the action of 1.5 times the rated load, the external slip and water leakage are not allowed; 4.3.4 Durability: Under the action of the new pressure, the plug speed shall not be less than 10 μm/%, and the running comfort shall not be less than 9% of the rated value. After 10,000 times, the external penetration test shall be carried out again, and the external penetration shall not exceed the specified value. 1.4 The external surface must be plated to prevent the coating from slipping and scratching. 4.5 New parts must be inspected with a certificate of conformity. 5. The parts must be cleaned and lubricated before assembly.
2. The parts such as the guide and the parts must not be damaged by scratches, collisions, or other mechanical problems. After assembly, the parts must be free of jams, and the labels must be clear and firmly placed. 4.7 The new parts must be painted with a clean surface. 5. Test methods and inspection rules
5. Each plug cylinder must be tested before leaving the factory. 5.2 If any of the following conditions are met, a product type test must be carried out. The number of products for type test is set at one unit. One unit is tested for full performance, and the rest are tested for performance. bZxz.net
Product finalization (including product transfer)
When there are major changes in design, design or materials used that affect product performance; h.
Perform quality improvement!
JB5122--91
When the results of the rigorous test and the previous type test show an unacceptable difference, 5.3 Standard cylinder test pressure change system principle is shown in Figure AI in Appendix A (reference parts), and the commercial pressure system of the type test ensures that the pressure and time of the tested product conform to Figure A2 in Appendix A.
E. Inspection parts
5.4.: Levitra thickness
Output test 1.5 level
Type test [level
5. 4. 2 Hygrometer thickness
Type test [level
5. 4. 3 Circumference gauge thickness
Output test 1.5 short
Type test [level
5.4.4 Leakage viscosity
50 when 27-3)x[3-m/s
5.4.5 The measuring range of the measuring instrument should be greater than 2 of the maximum test signal. 5. 4. 5 Oil group
Factory test 50
Type test 5012:
Testing!
High humidity test is not more than 90 yuan
5.4.7 Clean and empty, the test pressure should not be higher than the pollution level: 19/16, 5. 5
Test items, methods and test requirements are shown in Table 4, Table
Test category
H is determined by formal test
Test force
Load efficiency
Pressure!
In the whole bank
European clinical method
Under the condition of no load, the bank manager is required! tt||, and then adjust the pressure inside the test cylinder to 1.5% of the new set pressure. , factory test 2min
and all temporary positions, special test points of the whole journey
not to charge the province outside the night pumping, lifting the line and other positive
negative efficiency
1. No external certificate
2, all seasonal stop are not understood there is no hydrological empty
the whole line of the long Tang difference library will make a request
test category
factory test
external attention
electric welcome
: line can be more
durability
I go on the test
JF 5:22--91
Continued Table 1
Test method
See durability test control
Product test only do the visual operation reversing 20 times, then the auxiliary quantity at the rod is checked and the oil is reduced by 90 times until the operation is more than 1
The bottle is under the specified force and the length is lower than
1C0mm/, and the full stroke is no longer small
3C% of the full stroke. The time between 2 times of the center quantity H is reduced by the full quantity
See the matching large test
0. 026 nd.
This is normal
or filter. After 25 times of use, the diameter of the 65rl rod is 50mm, the external weight is 4.05 when the external weight is 45 n T,. The external weight is ≤1.r1×4. 5.B The test results are recorded in the test record table. Each factory-made product certificate and the test results should be reported by the technical inspection department to issue a certificate. 6 Product clocks. The ordering unit has the right to re-inspect the product inventory according to the factory test requirements to see if it meets the requirements of this standard. 7 Marks and packages. 7! Each product is designed and operated according to the regulations, the lines and characters are clear and neat, and the self-made product license plate is issued according to the regulations. The content is clear and neat, and the product name and type are: Main technical data: Factory number: d.H factory date:
name of manufacturer,
2 rod sleeve test note: should be correct, the original model should be correct, the original model should be correct, the surface should be painted to prevent rust, the design and manufacture should be guaranteed to be in the correct state, and the vehicle will not be damaged under the following conditions: 7. The packaging must be firm, free of charge, and the packaging should be marked with the following information: 8
name of the investment unit, location:
product name, model, number, total quantity: b.
manufacturer new
[date and edition].
7.4 The following technical documents are included in the packing box: packing list, b. product quality inspection certificate:
c. product instruction manual,
All documents should be packed in the packing box,
JB5122-97
Attachment A
Principle diagram of hydraulic system for plunger cylinder test
(Dream test cow》
1-Variable system:-Send shock 3-Reverse 14-One-way shock 5-Key test year: 6-Add 17-Pressure gauge 8-Pressure 9-Direction: 10-Temperature: 11-Energy selector; 12-Pressure relief net 13-Motor 1-Dynamometer
Principle diagram of hydraulic system for plunger cylinder test
Nanjing A2 Power time waveform
Additional instructions:
JB 5122--91
This standard is proposed and regulated by the China Agricultural Mechanization Science Research Institute. This standard was drafted by the China Agricultural Mechanization Science Research Institute, and the main drafter of the standard is Zhou Zeming.
This standard is effective from the date of implementation. N514B-79ZG1 series single-acting column type pressure reducing cylinder for clothing machines