title>Sequential sampling procedures and tables for inspection by attributes - GB/T 8051-2002 - Chinese standardNet - bzxz.net
Home > GB > Sequential sampling procedures and tables for inspection by attributes
Sequential sampling procedures and tables for inspection by attributes

Basic Information

Standard ID: GB/T 8051-2002

Standard Name:Sequential sampling procedures and tables for inspection by attributes

Chinese Name: 计数序贯抽样检验程序及表

Standard category:National Standard (GB)

state:Abolished

Date of Release2002-06-13

Date of Implementation:2003-01-01

Date of Expiration:2009-01-01

standard classification number

Standard ICS number:Sociology, Services, Organization and management of companies (enterprises), Administration, Transport>>Quality>>03.120.30 Application of statistical methods

Standard Classification Number:Comprehensive>>Basic Subjects>>A41 Mathematics

associated standards

alternative situation:Replaced GB/T 8051-1987; replaced by GB/T 8051-2008

Procurement status:NEQ ISO 8422:1991

Publication information

publishing house:China Standards Press

ISBN:155066.1-18803

Publication date:2003-01-01

other information

Release date:1987-07-08

Review date:2004-10-14

drafter:Zhang Yuzhu, Cao Shimin, Liu Wen, Ma Yilin, Zhu Huiming, Chang Zhicheng, etc.

Drafting unit:Ordnance Engineering College, China Standards Research Center, Institute of Mathematics and Systems Science, Chinese Academy of Sciences

Focal point unit:National Technical Committee for Application of Statistical Methods and Standardization

Proposing unit:National Technical Committee for Application of Statistical Methods and Standardization

Publishing department:General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

competent authority:National Standardization Administration

Introduction to standards:

This standard specifies the counting sequential sampling inspection plan and procedure for discrete individuals. The plan in the main body of this standard is indexed by the producer's risk point and the user's risk point. As a supplement to the sampling plan system of GB/T 2828 (ISO 2859-1), the counting sequential sampling inspection plan and procedure indexed by the acceptable quality level (AQL) are specified in Appendix A. The purpose of this standard is to provide a sequential assessment procedure for inspection results, which can be used to encourage the producer to provide batches with a high probability of accepting quality by the economic and psychological pressure brought to the producer by rejecting inferior batches. At the same time, an upper limit is set for the probability of accepting inferior batches, so that the user is also protected. The sampling plan specified in this standard can be used for but not limited to the following different inspection occasions, such as: - Final product; - Components and raw materials; - Operation; - Work in progress; - Inventory materials; - Maintenance operations; - Data or records; - Management procedures. Sampling plans in this standard can be used when the degree of nonconformity is expressed as a rate of nonconformity (or percentage of nonconformity) or the number of nonconformities per unit of product (or the number of nonconformities per 100 units of product). Sampling inspection plans are based on the assumption that nonconformities occur randomly and are statistically independent. There may be good reason to suspect that a certain nonconformity in a sample is caused by a condition that may also cause other nonconformities. If so, a better approach is to consider whether the sample is a conforming or nonconforming product and ignore multiple nonconformities. The plans in Appendix A are mainly applicable to the inspection of a series of batches on the same production line. The plans in the main body of this standard can also be used to inspect isolated batches. GB/T 8051-2002 Procedures and tables for sequential sampling inspection by attributes GB/T8051-2002 standard download decompression password: www.bzxz.net
This standard specifies the plans and procedures for sequential sampling inspection by attributes for discrete individuals. The plans in the main body of this standard are indexed by producer risk points and user risk points. As a supplement to the sampling plan system of GB/T 2828 (ISO 2859-1), Appendix A specifies the numbered sequential sampling inspection plan and procedure indexed by the acceptable quality level (AQL). The purpose of this standard is to provide a sequential evaluation procedure for the inspection results, which can be used to encourage the manufacturer to provide batches with a high probability of accepting quality by the economic and psychological pressure brought to the manufacturer by rejecting the inferior batch. At the same time, an upper limit is set for the probability of accepting the inferior batch, so that the user is also protected. The sampling plan specified in this standard can be used for but not limited to the following different inspection occasions, such as: - Final product; - Components and raw materials; - Operation; - Work in progress; - Inventory materials; - Maintenance operations; - Data or records; - Management procedures. The sampling plan of this standard can be used in situations where the degree of non-conformity is expressed by the non-conforming rate (or percentage of non-conforming products) or the number of non-conforming products per unit of product (or the number of non-conforming products per hundred units of product). The sampling inspection plan is based on the assumption that non-conforming products occur randomly and are statistically independent. There may be good reason to suspect that a failure of a sample is due to a condition that may also cause other failures. If so, a better approach is to consider the sample as either a conforming or a rejecting product and ignore multiple failures. The scheme in Annex A is mainly applicable to the inspection of a series of batches on the same production line. The scheme in the main body of this standard can also be used to inspect isolated batches.


Some standard content:

ICS 03.120.35
National Standard of the People's Republic of China
G1T80512002
Generated from G8511987
Sequential sampling procedures and tablesfor inspection by attributes(Is0 8422,I991,Sequential sampling planslor inspection by attributes.NEQ)2002 0613 Issued
National Quality Supervision, Inspection and Quarantine Administration of the People's Republic of China
2003-01-01 Implementation
Normative References
3 Technical Definitions and Line Numbers
3. 1 5.1.2 Selection of sampling plans 5.3.1.3 Sample preparation 5.4.2 Requirements for batch sampling 5.5.3.3 Selection of sampling plans in accordance with G/2928 (S028-1) 5.5.3.4 Utilization rate of two-point requirements 5.6.1.2 Preliminary analysis of the sampling plan 5.7.1.2 Selection of sampling plans 5.8.1.3 Selection of sampling plans 5.9.1.3 Selection of sampling plans 5.10.1.3 Selection of sampling plans 5.11.1.3 Selection of sampling plans 5.12.1.3 Selection of sampling plans 5.13.1.3 Selection of sampling plans 5.14.1.3 Selection of sampling plans 5.15.1.3 Selection of sampling plans 5.16.1.3 Selection of sampling plans 5.17.1.3 Selection of sampling plans 5.18.1.3 Selection of sampling plans 5.19.1.4 Selection of sampling plans 5.20.1.4 Selection of sampling plans 5.21.4.3 Selection of sampling plans 5.22.4.3 Selection of sampling plans 5.23.4.4.5 Selection of sampling plans 5.24.4.5 Selection of sampling plans 5.25.4.5.5.6.6.7 Selection of sampling plans 5.26.4.5.6.7.8 Selection of sampling plans 5.27.4.5.6.7.8.9 Selection of sampling plans 5. 4. 2. 1 Standard process
>. 2.2 Small batch cut
:, the funding provider reaches the agreement to control
5. 4. 3. 1 Stimulation bar
3. 4. 3. 2 External drawing method
Give the ground god plan of the implementation
6.1 The trap of the detailed plan is completed
. 2 section +
5. The sum of the product and
S. "Do not meet the daily score of the product
5.. Each year the number of products that do not meet the standards is tested
. 4 According to the judgment of the acceptance
Invitation to let
. 1. 1
.4.2 Figure
6.3 [By domain and average value
6.6 Validity of approximation
GR/T SJ5-—2002
GR/TB052002
Appendix (Specification 2828:S02%! Sampling method A introduction
A, 5G/T282815028501> The relationship between A-once, once, you change the order of the sample selection 4., the good sampling rate
steam, 2 Determination of acceptability
A.6 Transfer rule
A.7UC: line and average sample pass.
A..1 line--.
A.7.? Detailed description of the flat
Yang record standard record: medical case number determination
15.2 return of the old partner to confirm the compensation
.3 gold situation out of percentage test
.? Each single gold product does not meet the training test
B.=efficiency word accuracy level requirement
Appendix C (regular record) drag stable special production line and the average sample drought calculation goods Kai
2 by or read recent examples
. 2. 1 short medical film similar
.22 a set of after the amount of the flat at the approximate
special note
C.3 average village amount when the near assumption
: 3.1 quality uneven and sample
3.2 general quality level at the average sample size Figure 1 for dry productivity risk =, 0 Use the method of wind test, the sampling plan of the inspection or the control of the small creation of the figure 3, the sample plan of the hall fee, the medical sample plan. The figure is inverted according to the data of the inspection record
G/T8051-202
This standard is consistent with the international standard [822:159 (F 9 is the consistency of the non-process efficiency, the main technical 4 customers and 150122:1931 teaching, the first state-owned teaching standard of my country, this standard is revised after the 5/8U51-127 counting loan inspection and inspection table, this standard replaces GBT 05:11557.
Compared with 81-·17, the technical content of the standard has changed significantly: According to 1.1, the standard text is revised, and the method and sample plan table of [8422-155] are used. The parameters of the original plan are cancelled, and the number of vertical numbers is not included. The judgment number of the cabinet is valid and consistent with the original standard. Once the new parameters are used, the yellow column will be re-judged and the decision will be made. This revision has made some necessary changes to some terms and procedures. Appendix A and Appendix B of the standard and Appendix C are normative appendices. Standard 10 is proposed by the National Statistical Standard Application Technical Committee and is the main body of the standard. The main authors are: College of Automotive Engineering, China Standard Research Center, Chinese Academy of Mathematics and Systems Science, Institute of Standardization of Yunlin Industry Co., Ltd. The main authors are: Zhang Sandu, Dian Shimin, Ke Wen, Ma Yixiao, Wei Huiyong, Chang Zhicheng, etc. The standard was first released in 2011. This standard specifies the counting sequence sampling inspection procedures and tables for individual welding operations. The categories in the standard are based on the risk points and the risk points are used as the criteria for TB/T. R051—2002
is a supplement to G/T2328(S02859-1) in that the sampling plan needs to be systematically standardized. Appendix A specifies the sampling plan and sequence of the samples to be subjected to the quality water (A) index: The purpose of this standard is to provide an assessment procedure for the results of the inspection station - using this procedure, the inspection station can carefully reject the inferior products and avoid the economic and internal pressure on the tertiary industry, and provide the production with a high quality report to the society. When selling, the company shall consider the following restrictions: the acceptance of non-quality machinery in the province, the use of the method of scanning and registering the protection of production, and the use of the following ring wet period sample, can be used for the following different particle inspection sites, for example: the total product and raw materials: the production process; the inventory of the company; the maintenance of bamboo; the validity data or.. record; the order of careful expectation. The sampling plan of this standard can be used to determine the degree of non-conforming quantity (or non-conforming product score) or the unit product that does not meet the specifications or the hundred-order production efficiency request. The above card is a random distribution of qualified products for independent production flow design. There may be real reasons to suspect that the incompleteness of a product is due to other factors that may cause incompleteness. If so, it is better to consider whether the product is not qualified enough and ignore more inappropriate situations. The solution in Appendix A is applicable to the same production line. The solution in this standard is also applicable to the current situation.
2 Normative referenced documents
The following documents shall apply to the specifications of this standard. All documents listed in the standard shall be subject to all modifications! (Normative errors are not included) The revisions are not applicable to this standard. Note: However, it is recommended to check whether the latest version of these documents is used in accordance with the requirements of this standard. For referenced documents without a date, the latest version shall apply to the next standard. H22: Counting sampling inspection type sequence acceptance pressure quantity limit (AQ price to speed inspection bar plan () 2859
G on 351-99 practice accounting terminology Part 1, - General statistical technology GB358.23 accounting inheritance Part 2: Statistical quality control This certificate 1, in the ability! Process (is to (/T2323-187 class inspection gold counting bar process production reform sampling table station! Through full batch inspection responsibility: account 1. Same S2839-1: 1949.
GB/T8051-2002
3 terms, definitions and titles
3-T Terms and Definitions
GB/T:1356.1.GB/T3355.2.GB/2828, IS02859-:3000 and the following terms and definitions shall apply. 3.1.1
Cumulative and cumulative sample size
When performing detailed experience evaluation on a batch, the total number of nonconforming products (non-conforming products) found during the inspection period, from the first unit of the batch to the last unit of the batch.
Cumulative sample sizeWhen performing detailed experience evaluation on a batch, the total number of nonconforming products (non-conforming products) found during the inspection period, from the first unit of the batch to the last unit of the batch.
sequential sampling inspection acceptance value acecevalue farsenuentinlsampling out as the case forget the number and the value obtained by the device, the batch is therefore accepted without comparison according to the case private, and the person who will receive the number of small notes: in the calculation of the effective storage of the west sampling format, the acceptance position is strictly called the acceptance, so a strict verification technique is adopted in this standard, urging listening, 3- 1.4
Sequence fee inspection rejection value rejectivntalueTorsnentialsanpliug The value obtained by the holding force search and the cumulative sum of this disk, whether the batch is rejected or not can be compared with the size of the cumulative process and the stop collection number: Note: In the counting sequence acceptance evaluation, the acceptance is used as a frequency-related number for a relatively rounded, and the technical proof is used in this standard. The following symbols
are the equal signs used in this standard:
corresponds to the acceptance number of the first description case
Sequence fee inspection rejection value
corresponds to the cumulative acceptance effect of the sample wood with the risk pressure or level of the user (without white The cumulative sum
is used to determine the coefficient of the amount of selection according to the result of the acceptance stimulus and the range of the acceptance (the scientific density of the acceptance and discount practice) to discuss the acceptance number of the constant dispersion (connection. The branch line load distance is one: the constant stimulus used to evaluate the rejection number (the rejection cutoff is) corresponds to the sample station
deep base position
ratio or the energy quality level of the gold product is converted into the number of unqualified products per unit of product score or the number of unqualified products per unit multiplied by 0. The risk is the lowest, when = [
makes the risk quality, when one
according to the production period
production market age quality to seek a level with unqualified product scores to express the range of the rapid sampling policy The number
corresponds to the number of rejections or the value of the product under the cumulative evaluation method or the production risk
uses the risk
to calculate the value of the inspection characteristic function under the normal quality improvement point. The basic principle of the sequential sampling plan
GB/T8051—2002
In the counting sequence, the unit products are accepted and the decision is made according to the plan. The cumulative number of unqualified products (or the number of non-conforming products) is calculated. After the inspection of each single product, the system and the acceptance batch can be accepted without any information assessment at the inspection stage. If the cumulative science shows that the acceptance is not satisfactory, then the quality level of the batch is small (the risk of using force is insufficient). , then the acceptance is verified and the inspection is signed.
If the risk of the batch is small enough to reject the batch, the inspection will be continued.
If the department indicates that it cannot make a decision, the unit of product can be inspected until the acceptance or rejection decision can be made.
5 Selection of sampling plan
E.1 Selection of single, double and multiple sampling plans E-1.1 Advantages and disadvantages of sequential sampling plans
For a given level of quality, the average sampling rate is the average number of units to be inspected per batch when starting or accepting the batch. As with the single and multiple sampling plans, the use of single sampling plans can reduce the need for single sampling plans to only one unit per cabinet or county. The above, the use of sequential state scheme, more convenient than the single, multiple sampling scheme cost less. For the ten-quality, the maximum number of samples of the secondary sampling scheme can reach or exceed the sample size of the oil production wood tray. The appendix gives the method for determining the approximate value of the average sample size: see the appendix. For a specific batch of "Rong", when using the ratio, the number of samples for actual inspection may exceed the upper limit of the number of samples specified in the secondary, single scheme! The actual upper limit of the number of samples to be inspected is not limited by the sampling speed. The slow inspection sample size may exceed the translation cost by increasing the number of times. In batches: For this standard full-quality bottle sample plan, the cut-off rule is introduced to limit the number of samples that can be sampled. When the plan uses the word push sample plan, the sample quantity cannot be adjusted in advance, so the edge and actual flow inspection of the sample can be carried out without difficulty. One disadvantage is that compared with a market promotion plan, when the hot sequence Shenzhen report method is used, the number of historical averages is judged by the implementer. When the inspection fee is easy to be held responsible: the general plan has a small sample and a larger sample. The disadvantages of the actual performance are trade-offs. 5.1.2 Note: It is against the rules to re-sample the product twice or more. The sampling plan should be studied before the product is started. If the sampling standard is changed or changed intentionally during the sampling, it may lead to a gradual change in the inspection quality. Therefore, this standard does not allow switching between inspection plans. 5.1.3 The sample size should be sufficient. The sampling plan should be increased compared to the old one. In a commercial sense, it is economical - but when testing a specific batch, it may be exposed due to the exposure of the product. The effectiveness of the protection method is very important. When the quality level of the batch is close, it is impossible to stop accepting or change the related judgment. The decision will be made, and the delay in the implementation of the company will be uncertain. This situation may occur when the quality level of the batch is close. Before you can choose the value of the cumulative sample size, you should set a large limit for the machine. When the cumulative sample size is discussed, the pre-inspection should be stopped: the acceptance of the batch should be strictly followed by the rules set by the sampling code before the start of the sampling, and the production standard risk is almost not affected by this change. In [4.? The numerical rules are given. 5.2 Requirements on batches
This standard is based on the statistical theory of the Lato test. This is generally determined: Now, take a sample, each trained G/T 8051-2002
and the details of the war will be released: if the sample is too severe, the batch is V, "point by point, the use of no back sampling for comfort has an out of the situation, these theories are still effective even when the cumulative cost is greater than N. These theories are close to the system. M, science: the law of safety book color
name of the use of no point oil, in the case of designated production and user risks, in order to make the cut-off sequence re-sampling according to the compensation can be made in batches should be enough, this For the 5.2 printing 5.4.1 requirements of the sequence of the disk group test plan construction should be more than 7 months note: milk music batch and the heart of the full, so that the requirements, the industry to produce and use the force of the risk period will be more than the specified letter. However, the addition of the first selection of the program to the text effect, the actual production of wind energy slightly exceeds the specified, 5.3 is the body bundle annual program selection || tt || 53-1 and G: T2828SO23591 / matching results need to check the line and (H2823 (M) 285S- 1) The oil sample plan of the left rate W can be compared with the method of recording A. Appendix 4 shows the quality level of the product! Q and detailed code of this volume are used to select the sampling rate of the sample. The sample selection method of the sample plan corresponds to the G2528 (2S-1 oil sample plan of the sampling method of the corresponding state line number 4.3.2 of the non-direct certificate plan that meets the requirements of the two points || tt || The method described in the previous 5-3.2 and 5.5.1 can be used to check the performance of the two lines. Points are used as the index of the general trend table. The corresponding point is the risk point of the producer according to the probability of collection, and the other point is used as the risk point. If there is no special provision, the first two points are selected for the design of the fake auction plan: Generally, the production risk point is 15, and the risk point is 410 (see Figure 1). If the production quality plan is required to have similar characteristics to the previous one, the risk points of the producer and the exporter can be obtained from the corresponding chart of the oil price plan. If such a force accumulation does not exist, it can only guarantee the safety of the Sichuan support plan and the risk points of the direct quality rent. 5.4 Preliminary exploration before inspection 5. 4. 1 Get your sensitivity, within and 8 for a price more than some fast reception and production by each teaching, that is, 8 times the value of this reference teaching corresponds to the production side risk "5. User risk", 1, the production and production of the optimal light value of the level of risk experience! Table 1A and Table 1-B give the parameters of the combination of the production and user risk test points, and the corresponding short sequence. The time pressure of the cup is 1 machine. The original sample fire 55 is collected as the second case. The law is to complete the fraud of cattle production. The batch is held. A long test is issued: the planned decision is made before the policy training sequence is thrown out. The fee sequence quality sampling party will be selected with the first sampling factor. The inspection and maintenance of the product center is added to the annual case of the individual area point:
If: the increase in the partner is not controlled by the attached three certificates·receive the reading of the joint request center.9, "also! 1's continuous six make through the same test, the standard exchange index rate is .1 This shows:
)PQ-1:(P-,-..:
CR2-GX.P4
Sequence rejection value The value obtained by the cumulative sum of the rejection and the rejection number is compared with the size of the cumulative number of rejections: Note: In the counting sequence acceptance evaluation, the acceptance is used as a frequency factor to make a relatively rounded number. The symbol
below is the equal sign used in this standard:
corresponds to the acceptance number of the first description case
sequence acceptance number of the group of cases
corresponds to the cumulative acceptance effect or level of the user (expressed as a score) of the cumulative sample quantity. The coefficient of the acceptance and discount rate (the scientific method of acceptance and discount practice) is used to determine the acceptance The number of common dispersion (connection. The load distance of the branch line is one: the common stimulus of the number of rejections (the cut-off value of the rejection sense) corresponds to the sample station of the case. The ratio of the energy quality level to the unqualified product is converted into the number of unqualified products per unit of product or multiplied by 0. The risk is the lowest, when = [
Make the risk quality, when one
According to the production market in the production period
The age of the production is expressed as the unqualified product score. The range of the sequential sampling strategy is expressed as the number of rejections of the collection evaluation or product value. The production risk
Use the risk
Under the normal quality change point, it is used to calculate the rejection value of the inspection characteristic function. The basic principle of the sequential sampling plan is 1 juice
GB/T8051-20 02
During the detailed inspection of the acceptance sequence, the unit products are accepted according to the plan and the decision is made according to the accumulated number of unqualified products (or the number of non-compliant products). After the inspection of each unit product: if there is no information in the inspection stage, the batch can be accepted. If the accumulated information shows that the quality level of the batch is not satisfactory (the risk is small enough), then the acceptance certificate will be signed and the inspection will be stopped.
If the department shows that the decision cannot be made, then continue to inspect the unit product: until the information can make a decision on the acceptance or rejection.
5 Selection of sampling plan
E.1 Warehouse, primary or secondary E-1.1 Advantages and Disadvantages of Sequential Sampling Schemes
For a given property level, the average sampling rate is the average number of items to be inspected per batch when the sampling plan is started or collected. As with the single and multiple sampling plans, the use of sequential sampling plans can reduce the cost of sampling only half of the average items required for the single or multiple sampling plans. However, the cost of using sequential plans is lower than that of single and multiple sampling plans. For a given property level, the maximum sample size of the secondary sampling plan can be as large as the average sample size of the fuel oil pallet. The appendix gives a method for determining the approximate average sample size: see Appendix. For a specific batch, when the comparison is used, the actual number of samples may exceed the sample size of the corresponding plan: the secondary and single sampling plan is selected! The upper limit of the actual number of tests is that there is no such limit in the sampling method. The slow test sample quantity may exceed the batch limit due to the repeated addition of samples. For the full-scale sample scheme, the cut-off rule is introduced to limit the number of samples that can be tested. When the sample is pushed, the sample quantity is not adjusted in advance. Therefore, the upper and lower sample quantities and the actual test performance can be carried out without difficulty. One disadvantage is that when the sample is pushed, the number of samples is judged by the implementer. When the test is easy to be responsible, the plan has the disadvantages of smaller samples and greater performance. The choice of re-sampling is against the standard. 5.1.2 Note: When selecting a second or multiple sampling, the sampling plan should be considered in the work of the sampling plan. And before the product is studied, if the sampling standards are changed or too strong, it may lead to a gradual change in the inspection policy. Therefore, this standard does not allow the conversion between inspection schemes: 5.1.3 The sample size must be sufficient. In the commercial sense, for the economic purpose, but for a certain batch of inspections, the sampling method must be increased compared with the old method. The product may be exposed due to the existence of a direct protection method that is not effective. It is too late to make a judgment, stop acceptance or change the relevant situation, and make a decision. The next step into the city will be delayed. This situation may occur when the quality level of the batch is close to that of the original batch. In this case, a large limit should be set before selecting the value of the original batch. When the cumulative sample size is discussed, the pre-inspection should be stopped: the acceptance and reporting of the batch should be carried out according to the rules set by the sampling code before the start of the sampling, and the production standard risk is almost not affected by this change. In [4.? The numerical rules are given. 5.2 Requirements on batch size
This standard is based on the statistical theory in the Lato test. This is generally determined: Now, take a sample, each trained G/T 8051-2002
and the details of the war will be released: if the sample is too strict, the batch is V, "part of it, use no back-drawing for comfort and safety, these theories are still effective even when the cumulative cost is greater than N. These theories are still effective even when the cumulative cost is greater than N. M, science: the method of safety book color
name adopts no point oiliness, in the case of specified production and user risks, in order to make the cut-off sequence re-sampling according to the compensation should be enough, for this 5.2 printing 5.4.1 requirements for the sequence group test plan construction machine month should be more than 7 Note: Milk Le batch and solid enough, let the requirements, the industry to go and make the risk stage will be more than the specified trust. However, the effect of the additional selection scheme is that the actual production of wind energy slightly exceeds the specified value. 5.3 is the selection of the annual scheme
53-1 and G:T2828SO23591/matching the results need to check the line and (H2823 (M) 285S-1) oil support left rate W of the library phase sampling plan, which can offset the active work of A. Appendix 4 products have been collected with quality level! Q and detailed quantity code in order to obtain the flash sequence scanning efficiency, select the sample sampling plan corresponding to the state line number G2528 (2S-1 oil sample replacement plan 4 non-contact certificate 5.3.2 to meet the two requirements of the program || tt || before the currency 5-3.2 and 5.5.1 described energy point method, we can draw a wide range of simulated trend table with two points on the sampling line as indexes. The corresponding point is the risk point of the production point, and the other point is the risk point. Design the false sampling plan If there is no special provision, please select these two points: Generally, the production side risk is 15, and the risk is 410 (see Figure 1). If the oil quality plan is required to have similar characteristics to the previous one, the risk points of the production side and the exporter can be obtained from the corresponding chart. If such a risk does not exist, it can only guarantee the safety of the plan and the risk point with the lowest quality. 5.4 Preliminary exploration before inspection 5. 4. 1 Get your sensitivity, within and 8
For a price that is indeed some fast receiving and production by each teaching, point, that is, 8 times the remaining value of this reference teaching corresponds to the production side risk "a 5. Use the party risk", 1, the production and production use as the optimal light value of the wind experience! Table 1A and Table 1-B give the parameters of the combination of the production and currency test points, and the short sequence when the record gives the altar. The cup weighs the time pressure as 1 machine average original fast sample fire 55 received as the case into, in order to complete the production fraud except long cattle production batch is to hold, out of a long test limit: the proposed decision before the political training sequence according to the cost of the sampling party will be selected with the one-time sampling factor product center inspection hold the individual area point:
If: the increase in the pool is not controlled by the attached three certificates · receiving the reading of the joint request center. 9, "also! 1's continuous body is tested by the same test, and the intersection rate is .1, which means:
)PQ-1:(P-,-..:
CR2-GX.P4
Sequence rejection value The value obtained by the cumulative sum of the rejection and the rejection number is compared with the size of the cumulative number of rejections: Note: In the counting sequence acceptance evaluation, the acceptance is used as a frequency factor to make a relatively rounded number. The symbol
below is the equal sign used in this standard:
corresponds to the acceptance number of the first description case
sequence acceptance number of the group of cases
corresponds to the cumulative acceptance effect or level of the user (expressed as a score) of the cumulative sample quantity. The coefficient of the acceptance and discount rate (the scientific method of acceptance and discount practice) is used to determine the acceptance The number of common dispersion (connection. The load distance of the branch line is one: the common stimulus of the number of rejections (the cut-off value of the rejection sense) corresponds to the sample station of the case. The ratio of the energy quality level to the unqualified product is converted into the number of unqualified products per unit of product or multiplied by 0. The risk is the lowest, when = [
Make the risk quality, when one
According to the production market in the production period
The age of the production is expressed as the unqualified product score. The range of the sequential sampling strategy is expressed as the number of rejections of the collection evaluation or product value. The production risk
Use the risk
Under the normal quality change point, it is used to calculate the rejection value of the inspection characteristic function. The basic principle of the sequential sampling plan is 1 juice
GB/T8051-20 02
During the detailed inspection of the acceptance sequence, the unit products are accepted according to the plan and the decision is made according to the accumulated number of unqualified products (or the number of non-compliant products). After the inspection of each unit product: if there is no information in the inspection stage, the batch can be accepted. If the accumulated information shows that the quality level of the batch is not satisfactory (the risk is small enough), then the acceptance certificate will be signed and the inspection will be stopped.
If the department shows that the decision cannot be made, then continue to inspect the unit product: until the information can make a decision on the acceptance or rejection.
5 Selection of sampling plan
E.1 Warehouse, primary or secondary E-1.1 Advantages and Disadvantages of Sequential Sampling Schemes
For a given property level, the average sampling rate is the average number of items to be inspected per batch when the sampling plan is started or collected. As with the single and multiple sampling plans, the use of sequential sampling plans can reduce the cost of sampling only half of the average items required for the single or multiple sampling plans. However, the cost of using sequential plans is lower than that of single and multiple sampling plans. For a given property level, the maximum sample size of the secondary sampling plan can be as large as the average sample size of the fuel oil pallet. The appendix gives a method for determining the approximate average sample size: see Appendix. For a specific batch, when the comparison is used, the actual number of samples may exceed the sample size of the corresponding plan: the secondary and single sampling plan is selected! The upper limit of the actual number of tests is that there is no such limit in the sampling method. The slow test sample quantity may exceed the batch limit due to the repeated addition of samples. For the full-scale sample scheme, the cut-off rule is introduced to limit the number of samples that can be tested. When the sample is pushed, the sample quantity is not adjusted in advance. Therefore, the upper and lower sample quantities and the actual test performance can be carried out without difficulty. One disadvantage is that when the sample is pushed, the number of samples is judged by the implementer. When the test is easy to be responsible, the plan has the disadvantages of smaller samples and greater performance. The choice of re-sampling is against the standard. 5.1.2 Note: When selecting a second or multiple sampling, the sampling plan should be considered in the work of the sampling plan. And before the product is studied, if the sampling standards are changed or too strong, it may lead to a gradual change in the inspection policy. Therefore, this standard does not allow the conversion between inspection schemes: 5.1.3 The sample size must be sufficient. In the commercial sense, for the economic purpose, but for a certain batch of inspections, the sampling method must be increased compared with the old method. The product may be exposed due to the existence of a direct protection method that is not effective. It is too late to make a judgment, stop acceptance or change the relevant situation, and make a decision. The next step into the city will be delayed. This situation may occur when the quality level of the batch is close to that of the original batch. In this case, a large limit should be set before selecting the value of the original batch. When the cumulative sample size is discussed, the pre-inspection should be stopped: the acceptance and reporting of the batch should be carried out according to the rules set by the sampling code before the start of the sampling, and the production standard risk is almost not affected by this change. In [4.? The numerical rules are given. 5.2 Requirements on batch size
This standard is based on the statistical theory in the Lato test. This is generally determined: Now, take a sample, each trained G/T 8051-2002
and the details of the war will be released: if the sample is too strict, the batch is V, "part of it, use no back-drawing for comfort and safety, these theories are still effective even when the cumulative cost is greater than N. These theories are still effective even when the cumulative cost is greater than N. M, science: the method of safety book color
name adopts no point oiliness, in the case of specified production and user risks, in order to make the cut-off sequence re-sampling according to the compensation should be enough, for this 5.2 printing 5.4.1 requirements for the sequence group test plan construction machine month should be more than 7 Note: Milk Le batch and solid enough, let the requirements, the industry to go and make the risk stage will be more than the specified trust. However, the effect of the additional selection scheme is that the actual production of wind energy slightly exceeds the specified value. 5.3 is the selection of the annual scheme
53-1 and G:T2828SO23591/matching the results need to check the line and (H2823 (M) 285S-1) oil support left rate W of the library phase sampling plan, which can offset the active work of A. Appendix 4 products have been collected with quality level! Q and detailed quantity code in order to obtain the flash sequence scanning efficiency, select the sample sampling plan corresponding to the state line number G2528 (2S-1 oil sample replacement plan 4 non-contact certificate 5.3.2 to meet the two requirements of the program || tt || before the currency 5-3.2 and 5.5.1 described energy point method, we can draw a wide range of simulated trend table with two points on the sampling line as indexes. The corresponding point is the risk point of the production point, and the other point is the risk point. Design the false sampling plan If there is no special provision, please select these two points: Generally, the production side risk is 15, and the risk is 410 (see Figure 1). If the oil quality plan is required to have similar characteristics to the previous one, the risk points of the production side and the exporter can be obtained from the corresponding chart. If such a risk does not exist, it can only guarantee the safety of the plan and the risk point with the lowest quality. 5.4 Preliminary exploration before inspection 5. 4. 1 Get your sensitivity, within and 8
For a price that is indeed some fast receiving and production by each teaching, point, that is, 8 times the remaining value of this reference teaching corresponds to the production side risk "a 5. Use the party risk", 1, the production and production use as the optimal light value of the wind experience! Table 1A and Table 1-B give the parameters of the combination of the production and currency party risk test points, and the short sequence when the cup is weighed. The original sample fire 55 is used as the case of the first case. The method is to complete the production fraud except for the long cattle production batch. The long test limit is: the planned decision is made before the policy training sequence is thrown according to the cost of the sequence quality sampling party. The selection factor of the product center will be added to the annual case of the individual area degree point:
If: the increase in the pool is not controlled by the attached three certificates·The receiving reading of the joint request center. 9, "also! 1's continuous body is tested by the same test, and the intersection rate is .1, which means:
)PQ-1:(P-,-..:
CR2-GX.PThe load distance of the branch line is one: the constant stimulation of the rejection number (the cut-off value of the rejection feeling) corresponds to the sample station of the first sample case
deep position
ratio or the energy quality level of the unqualified product. The number of unqualified products per unit is converted into the unqualified product score or the number of unqualified products per unit is multiplied by 0. The risk is the lowest, when = [
makes the risk quality, when one
according to the production period
production market age quality level is expressed in the sequence of unqualified product scores. The range of acceptance numbers of sampling strategies
corresponds to the number of rejections of the accumulated evaluation results or product values. The production risk
uses the risk
to calculate the effective value of the inspection characteristic function under the normal quality improvement point. The basic principle of sequential sampling plan
GB/T8051—2002
In the counting sequence, the unit products are accepted according to the plan and the cumulative number of unqualified products (or non-compliant numbers) is used to calculate the number of non-compliant products. After the product inspection, if there is no information in the inspection stage, the batch can be accepted according to the assessment. If the inspection stage shows that the quality level of the batch is not satisfactory (the risk of production capacity is small enough), then the acceptance certificate will be rejected and the inspection will be stopped. If the department indicates that the quality level of the batch is not satisfactory (the risk of production capacity is small enough), then the acceptance certificate will be rejected. If the department indicates that the quality level of the batch is not satisfactory (the risk of production capacity is small enough), then the acceptance certificate will be stopped and the inspection will be stopped. 5. Selection of sampling plan
E.1 Selection of single, double and multiple sampling plans E-1.1 Advantages and disadvantages of sequential sampling plans
For a given level of oxygen in a property, the average sampling rate is the average number of items to be inspected per batch when starting or accepting the property plan. As with single and multiple sampling plans, the use of sequential sampling plans can In order to obtain the characteristics of the industry or the secondary sampling plan, there is a need for a small half-average single unit cost. In the above, the sequential plan is used quickly, which is more convenient than the single sampling plan. The cost of multiple sampling plans is smaller. For the ten-year quality, the maximum sample size of the secondary sampling plan can be transported to the section of the oil production wood tray or the section of the test length that exceeds the test length. The appendix gives the method for determining the approximate value of the sub-sampled wood: see the appendix. For a specific batch of "Rong", when using the comparison, the case will become the world pole force factor, and the actual number of samples may be changed by a relatively strict control. The sample of the case: the text is about the second, single scheme selection! The upper limit of the actual number of tests, the sampling method is appropriate, there is no such limit, the slow test sample quantity may be contributed to the number of batches beyond the limit: for the full character sample scheme, the cut-off rule is introduced to limit the number of samples that can be planned. When the case is pushed by the character sample, the sample quantity is not adjusted in advance, so the actual test can be carried out without difficulty, and a proof is not The disadvantages are: compared with a market promotion plan, when the hot sequence reporting method is implemented, the historical average number is judged by the implementer, and the inspection fee is easy to be held responsible: the general plan has a small sample size and a relatively strong correction ability. The choice of using the sequence re-sampling plan is against the rules. 5.1.2 Note: The selection of the second or multiple times should be considered. The sequence sampling plan should be studied before the product is started. If the sampling standard is changed or the sampling is too strong, It may lead to gradual changes in the policy of inspection. Therefore, this standard does not allow conversion between inspection schemes. The following types of promotion schemes are recommended: 5.1.3 Depending on the sample size, it is necessary to make an additional sampling method than the old one. In the commercial sense, for the economic purpose, but for a specific batch of inspections, the product may be exposed due to the existence of a direct protection method that is very effective. When the protection is too effective, it is impossible to stop accepting or change the relevant judgment at a later time. The next step into the mountain society is uncertain. The delay in the development of the city. This situation may occur when the quality level of the batch is close to that of the original batch. In this case, a large limit should be set before selecting the value of the original batch. When the cumulative sample size is discussed, the pre-inspection should be stopped: the acceptance and reporting of the batch should be carried out according to the rules set by the sampling code before the start of the sampling, and the production standard risk is almost not affected by this change. In [4.? The numerical rules are given. 5.2 Requirements on batch size
This standard is based on the statistical theory in the Lato test. This is generally determined: Now, take a sample, each trained G/T 8051-2002
and the details of the war will be released: if the sample is too strict, the batch is V, "part of it, use no back-drawing for comfort and safety, these theories are still effective even when the cumulative cost is greater than N. These theories are still effective even when the cumulative cost is greater than N. M, science: the method of safety book color
name adopts no point oiliness, in the case of specified production and user risks, in order to make the cut-off sequence re-sampling according to the compensation should be enough, for this 5.2 printing 5.4.1 requirements for the sequence group test plan construction machine month should be more than 7 Note: Milk Le batch and solid enough, let the requirements, the industry to go and make the risk stage will be more than the specified trust. However, the effect of the additional selection scheme is that the actual production of wind energy slightly exceeds the specified value. 5.3 is the selection of the annual scheme
53-1 and G:T2828SO23591/matching the results need to check the line and (H2823 (M) 285S-1) oil support left rate W of the library phase sampling plan, which can offset the active work of A. Appendix 4 products have been collected with quality level! Q and detailed quantity code in order to obtain the flash sequence scanning efficiency, select the sample sampling plan corresponding to the state line number G2528 (2S-1 oil sample replacement plan 4 non-contact certificate 5.3.2 to meet the two requirements of the program || tt || before the currency 5-3.2 and 5.5.1 described energy point method, we can draw a wide range of simulated trend table with two points on the sampling line as indexes. The corresponding point is the risk point of the production point, and the other point is the risk point. Design the false sampling plan If there is no special provision, please select these two points: Generally, the production side risk is 15, and the risk is 410 (see Figure 1). If the oil quality plan is required to have similar characteristics to the previous one, the risk points of the production side and the exporter can be obtained from the corresponding chart. If such a risk does not exist, it can only guarantee the safety of the plan and the risk point with the lowest quality. 5.4 Preliminary exploration before inspection 5. 4. 1 Get your sensitivity, within and 8
For a price that is indeed some fast receiving and production by each teaching, point, that is, 8 times the remaining value of this reference teaching corresponds to the production side risk "a 5. Use the party risk", 1, the production and production use as the optimal light value of the wind experience! Table 1A and Table 1-B give the parameters of the combination of the production and currency party risk test points, and the short sequence when the cup is weighed. The original sample fire 55 is used as the case of the first case. The method is to complete the production fraud except for the long cattle production batch. The long test limit is: the planned decision is made before the policy training sequence is thrown according to the cost of the sequence quality sampling party. The selection factor of the product center will be added to the annual case of the individual area degree point:
If: the increase in the pool is not controlled by the attached three certificates·The receiving reading of the joint request center. 9, "also! 1's continuous body is tested by the same test, and the intersection rate is .1, which means:
)PQ-1:(P-,-..:
CR2-GX.PThe load distance of the branch line is one: the constant stimulation of the rejection number (the cut-off value of the rejection feeling) corresponds to the sample station of the first sample case
deep position
ratio or the energy quality level of the unqualified product. The number of unqualified products per unit is converted into the unqualified product score or the number of unqualified products per unit is multiplied by 0. The risk is the lowest, when = [
make the risk quality, when one
according to the production period
production market age quality level to express the unqualified product score sequence quickly The range of acceptance numbers of sampling strategies
corresponds to the number of rejections of the accumulated evaluation results or product values. The production risk
uses the risk
to calculate the effective value of the inspection characteristic function under the normal quality improvement point. The basic principle of sequential sampling plan
GB/T8051—2002
In the counting sequence, the unit products are accepted according to the plan and the cumulative number of unqualified products (or non-compliant numbers) is used to calculate the number of non-compliant products. After the product inspection, if there is no information in the inspection stage, the batch can be accepted according to the assessment. If the inspection stage shows that the quality level of the batch is not satisfactory (the risk of production capacity is small enough), then the acceptance certificate will be rejected and the inspection will be stopped. If the department indicates that the quality level of the batch is not satisfactory (the risk of production capacity is small enough), then the acceptance certificate will be rejected. If the department indicates that the quality level of the batch is not satisfactory (the risk of production capacity is small enough), then the acceptance certificate will be stopped and the inspection will be stopped. 5. Selection of sampling plan
E.1 Selection of single, double and multiple sampling plans E-1.1 Advantages and disadvantages of sequential sampling plans
For a given level of oxygen in a property, the average sampling rate is the average number of items to be inspected per batch when starting or accepting the property plan. As with single and multiple sampling plans, the use of sequential sampling plans can In order to obtain the characteristics of the industry or the secondary sampling plan, there is a need for a small half-average single unit cost. In the above, the sequential plan is used quickly, which is more convenient than the single sampling plan. The cost of multiple sampling plans is smaller. For the ten-year quality, the maximum sample size of the secondary sampling plan can be transported to the section of the oil production wood tray or the section of the test length that exceeds the test length. The appendix gives the method for determining the approximate value of the sub-sampled wood: see the appendix. For a specific batch of "Rong", when using the comparison, the case will become the world pole force factor, and the actual number of samples may be changed by a relatively strict control. The sample of the case: the text is about the second, single scheme selection! The upper limit of the actual number of tests, the sampling method is appropriate, there is no such limit, the slow test sample quantity may be contributed to the number of batches beyond the limit: for the full character sample scheme, the cut-off rule is introduced to limit the number of samples that can be planned. When the case is pushed by the character sample, the sample quantity is not adjusted in advance, so the actual test can be carried out without difficulty, and a proof is not The disadvantages are: compared with a market promotion plan, when the hot sequence reporting method is implemented, the historical average number is judged by the implementer, and the inspection fee is easy to be held responsible: the general plan has a small sample size and a relatively strong correction ability. The choice of using the sequence re-sampling plan is against the rules. 5.1.2 Note: The selection of the second or multiple times should be considered. The sequence sampling plan should be studied before the product is started. If the sampling standard is changed or the sampling is too strong, It may lead to gradual changes in the policy of inspection. Therefore, this standard does not allow conversion between inspection schemes. The following types of promotion schemes are recommended: 5.1.3 Depending on the sample size, it is necessary to make an additional sampling method than the old one. In the commercial sense, for the economic purpose, but for a specific batch of inspections, the product may be exposed due to the existence of a direct protection method that is very effective. When the protection is too effective, it is impossible to stop accepting or change the relevant judgment at a later time. The next step into the mountain society is uncertain. The delay in the development of the city. This situation may occur when the quality level of the batch is close to that of the original batch. In this case, a large limit should be set before selecting the value of the original batch. When the cumulative sample size is discussed, the pre-inspection should be stopped: the acceptance and reporting of the batch should be carried out according to the rules set by the sampling code before the start of the sampling, and the production standard risk is almost not affected by this change. In [4.? The numerical rules are given. 5.2 Requirements on batch size
This standard is based on the statistical theory in the Lato test. This is generally determined: Now, take a sample, each trained G/T 8051-2002
and the details of the war will be released: if the sample is too strict, the batch is V, "part of it, use no back-drawing for comfort and safety, these theories are still effective even when the cumulative cost is greater than N. These theories are still effective even when the cumulative cost is greater than N. M, science: the method of safety book colorbzxz.net
name adopts no point oiliness, in the case of specified production and user risks, in order to make the cut-off sequence re-sampling according to the compensation should be enough, for this 5.2 printing 5.4.1 requirements for the sequence group test plan construction machine month should be more than 7 Note: Milk Le batch and solid enough, let the requirements, the industry to go and make the risk stage will be more than the specified trust. However, the effect of the first-time selection plan is to increase the actual production of wind energy slightly exceeding the specified level. 5.3 is the selection of the annual plan. The result needs to be checked and the (H2823 (M) 285S-1) oil support rate W library is matched with the sampling plan. It can be offset by the recorded A method. Appendix 4 shows the quality level of the product! Q and detailed quantity code in order to obtain the flash sequence scanning efficiency, select the sample sampling plan corresponding to the state line number G2528 (2S-1 oil sample replacement plan 4 non-contact certificate 5.3.2 to meet the two requirements of the program || tt || before the currency 5-3.2 and 5.5.1 described energy point method, we can draw a wide range of simulated trend table with two points on the sampling line as indexes. The corresponding point is the risk point of the production point, and the other point is the risk point. Design the false sampling plan If there is no special provision, please select these two points: Generally, the production side risk is 15, and the risk is 410 (see Figure 1). If the oil quality plan is required to have similar characteristics to the previous one, the risk points of the production side and the exporter can be obtained from the corresponding chart. If such a force does not exist, it can only guarantee the safety of the plan and the risk point with the lowest quality rent. 5.4 Preliminary exploration before inspection 5. 4. 1 Get your sensitivity, within and 8
For a price that is indeed some fast receiving and production by each teaching, point, that is, 8 times the remaining value of this reference teaching corresponds to the production side risk "a 5. Use the party risk", 1, the production and production use as the optimal light value of the wind experience! Table 1A and Table 1-B give the parameters of the combination of the production and currency test points, and the short sequence when the record gives the altar. The cup weighs the time pressure as 1 machine average original fast sample fire 55 received as the case into, in order to complete the production fraud except long cattle production batch is to hold, out of a long test limit: the proposed decision before the political training sequence according to the cost of the sampling party will be selected with the one-time sampling factor product center inspection hold the individual area point:
If: the increase in the pool is not controlled by the attached three certificates · receiving the reading of the joint request center. 9, "also! 1's continuous body is tested by the same test, and the intersection rate is .1, which means:
)PQ-1:(P-,-..:
CR2-GX.P1 Advantages and Disadvantages of Sequential Sampling Schemes
For a given level of oxygen in a property, the average number of items to be inspected per batch is the highest when the sampling rate is the highest. As with single- and multiple-sampling schemes, using sequential sampling schemes can reduce the average number of items required to be inspected per batch or multiple-sampling scheme. However, using sequential sampling schemes reduces the cost of sampling compared to single- and multiple-sampling schemes. For the quality of the ten batches, the maximum number of samples of the secondary sampling scheme can reach the average sample size of the oil-producing wood. The appendix gives the method for determining the approximate value of the average sample size: see the appendix. For the specific batches of "Rong", when using the ratio, the number of samples for the actual inspection may exceed the upper limit of the number of samples specified in the secondary sampling scheme: the number of samples selected for the secondary sampling scheme is strictly controlled! There is no such limit on the speed of the sampling method. The slow inspection sample size may exceed the upper limit of the actual inspection number. In batches: For this standard full-quality bottle sample plan, the cut-off rule is introduced to limit the number of samples that can be sampled. When the plan uses the word push sample plan, the sample quantity cannot be adjusted in advance, so the edge and actual flow inspection of the sample can be carried out without difficulty. One disadvantage is that compared with a market promotion plan, when the hot sequence Shenzhen report method is used, the number of historical averages is judged by the implementer. When the inspection fee is easy to be held responsible: the general plan has a small sample and a larger sample. The disadvantages of the actual performance are trade-offs. 5.1.2 Note: It is against the rules to re-sample the product twice or more. The sampling plan should be studied before the product is started. If the sampling standard is changed or changed intentionally during the sampling, it may lead to a gradual change in the inspection quality. Therefore, this standard does not allow switching between inspection plans. 5.1.3 The sample size should be sufficient. The sampling plan should be increased compared to the old one. In a commercial sense, it is economical - but when testing a specific batch, it may be exposed due to the exposure of the product. The effectiveness of the protection method is very important. When the quality level of the batch is close, it is impossible to stop accepting or change the related judgment. The decision will be made, and the delay in the implementation of the company will be uncertain. This situation may occur when the quality level of the batch is close. Before you can choose the value of the cumulative sample size, you should set a large limit for the machine. When the cumulative sample size is discussed, the pre-inspection should be stopped: the acceptance of the batch should be strictly followed by the rules set by the sampling code before the start of the sampling, and the production standard risk is almost not affected by this change. In [4.? The numerical rules are given. 5.2 Requirements on batches
This standard is based on the statistical theory of the Lato test. This is generally determined: Now, take a sample, each trained G/T 8051-2002
and the details of the war will be released: if the sample is too severe, the batch is V, "point by point, the use of no back sampling for comfort has an out of the situation, these theories are still effective even when the cumulative cost is greater than N. These theories are close to the system. M, science: the law of safety book color
name of the use of no point oil, in the case of designated production and user risks, in order to make the cut-off sequence re-sampling according to the compensation can be made in batches should be enough, this For the 5.2 printing 5.4.1 requirements of the sequence of the disk group test plan construction should be more than 7 months note: milk music batch and the heart of the full, so that the requirements, the industry to produce and use the force of the risk period will be more than the specified letter. However, the addition of the first selection of the program to the text effect, the actual production of wind energy slightly exceeds the specified, 5.3 is the body bundle annual program selection || tt || 53-1 and G: T2828SO23591 / matching results need to check the line and (H2823 (M) 285S- 1) The oil sample plan of the left rate W can be compared with the method of recording A. Appendix 4 shows the quality level of the product! Q and detailed code of this volume are used to select the sampling rate of the sample. The sample selection method of the sample plan corresponds to the G2528 (2S-1 oil sample plan of the sampling method of the corresponding state line number 4.3.2 of the non-direct certificate plan that meets the requirements of the two points || tt || The method described in the previous 5-3.2 and 5.5.1 can be used to check the performance of the two lines. Points are used as the index of the general trend table. The corresponding point is the risk point of the producer according to the probability of collection, and the other point is used as the risk point. If there is no special provision, the first two points are selected for the design of the fake auction plan: Generally, the production risk point is 15, and the risk point is 410 (see Figure 1). If the production quality plan is required to have similar characteristics to the previous one, the risk points of the producer and the exporter can be obtained from the corresponding chart of the oil price plan. If such a force accumulation does not exist, it can only guarantee the safety of the Sichuan support plan and the risk points of the direct quality rent. 5.4 Preliminary exploration before inspection 5. 4. 1 Get your sensitivity, within and 8 for a price more than some fast reception and production by each teaching, that is, 8 times the value of this reference teaching corresponds to the production side risk "5. User risk", 1, the production and production of the optimal light value of the level of risk experience! Table 1A and Table 1-B give the parameters of the combination of the production and user risk test points, and the corresponding short sequence. The time pressure of the cup is 1 machine. The original sample fire 55 is collected as the second case. The law is to complete the fraud of cattle production. The batch is held. A long test is issued: the planned decision is made before the policy training sequence is thrown out. The fee sequence quality sampling party will be selected with the first sampling factor. The inspection and maintenance of the product center is added to the annual case of the individual area point:
If: the increase in the partner is not controlled by the attached three certificates·receive the reading of the joint request center.9, "also! 1's continuous six make through the same test, the standard exchange index rate is .1 This shows:
)PQ-1:(P-,-..:
CR2-GX.P1 Advantages and Disadvantages of Sequential Sampling Schemes
For a given level of oxygen in a property, the average number of items to be inspected per batch is the highest when the sampling rate is the highest. As with single- and multiple-sampling schemes, using sequential sampling schemes can reduce the average number of items required to be inspected per batch or multiple-sampling scheme. However, using sequential sampling schemes reduces the cost of sampling compared to single- and multiple-sampling schemes. For the quality of the ten batches, the maximum number of samples of the secondary sampling scheme can reach the average sample size of the oiThe user quantity should be used separately, and R=A+1 replaces A and K. Acceptance 5:
For "multiple effects, a 1.70479 sequence selection scheme is used. In the example: in the area 2, the daily increase in the number of collections is effective. Suppose from the whole to the 15 hidden bodies, etc. 3. The 8th, the 11 single 15 purchase bodies cannot be selected from the heart of the station. The result is that the average collection of the male 13 policy recording bodies is not required. When the collection number is reached, it can be judged that it is a pool collection of the whole monitoring batch, and the inspection can be terminated. With the outside, the first 19 bodies that are auctioned in the dynamic push are all compliant with the fee request , when the species is completed 1· the absolute monomer is terminated, I and the second one press the payment,
can establish the first sample before the inspection also this self-stop, the car can inspect the sample, then the final inspection, at this time, the average cumulative recognition profit is more than, if the actual account and for more than 15 blood list cabinet chief inspection, boundary sample
for product age management fruit
hold collection
juice: · small cumulative rate, do not make collection, note": · small cumulative and column book is too small, insufficient double small rejection change to the determination. Figure 4 Example 5 Data Inspection Record
6.4.2 Work Encirclement
will point ...) mark the acceptance chart according to the dirty 5.1.3. Introduction of the method of the comprehensive system. The evil volume is all
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.