1CS 65.060.99
Machinery Industry Standard of the People's Republic of China
JB10267—2001
Rabber roll hasker
2001-06-04 Issued
China Machinery Industry Federation
2001-10-01 Implementation
JB/T10267-2001
This standard is proposed and managed by the China Machinery Standardization Technical Committee. The responsible drafting units of this standard are: Shandong Agricultural Machinery Science Research Institute, Shandong Wenshang Jingliang Machinery Co., Ltd. The main drafters of this standard are: Wang Dongyue, Han Hongmei, Sun Xisheng. This standard was first issued in June 2001.
Machinery Industry Standard of the People's Republic of China
Rubber roll husker
Rubber roll husker
JB/T10267—2001
This standard specifies the technical requirements, test methods, inspection rules and marking, packaging, transportation and storage of rubber roll husker. This standard applies to rubber roll husker (hereinafter referred to as rubber roll husker). Referenced Standards
The provisions contained in the following standards shall constitute the provisions of the standard cited in this standard. When this standard is published, the versions shown are valid. All standards will be subscribed to by you. Parties using this standard should explore the possibility of using the following standards to see the new version of the wood GB1350-1999
GB/T28281987
GB/T 376B..-1996
GB 5491.--1985
GE5495--1985
CE/T9239-198
GE133061991
JB.T56731991
3 Technical requirements
3. 1. Technical requirements
Batch inspection Count sampling procedures and sampling tables (applicable to the inspection of vehicle batches) Acoustic pressure method to determine the power level of the source Simple method of measuring the surface by using the envelope above the reflective surface
Grain and oil inspection, sampling and sampling method
Grain and oil inspection Rice roughness inspection method Rigid rotor balance item Determination of allowable imbalance Label
General technical requirements for agricultural and forestry tractors and machinery 3.1.1 The tractor should meet the requirements of the standard and be in accordance with the drawings and technical specifications approved by the prescribed procedures. 3.1.2 All parts and accessories must be inspected and qualified: purchased parts must have qualified certification documents before they can be assembled. 3.1.3 The joints of each component should be flat and neat, without obvious misalignment. 3..4 Castings shall not have obvious defects such as cold shut, sand eyes, shrinkage holes, cracks and looseness. 3.1.5 The welded parts shall be firmly connected, and there shall be no welding or burning through. 3.1. The coating of the steel parts and galvanized parts shall be smooth, the color shall be uniform and the surface quality of the machine shall not be lower than the requirements of the weather-resistant coating in R5673. 3.1. The adhesive material must be non-toxic and shall not cause pollution to the rice. 3.1.9 The rubber consumption of the rubber of the glutinous machine shall be no less than 25kg. 3.1.10 After the glutinous machine is assembled, it shall be operated at no more than 20min at the set speed and shall meet the following requirements: a) All rotating parts shall operate smoothly without abnormal movement and noise, and without jamming. Approved by China Machinery Industry Federation on June 4, 2001, implemented on October 1, 2001.
JB/T1+267—2001
b) All accumulators and connectors shall be firmly connected and not loose. 3.1.11 There shall be no leakage between the gear box and the cover, the bearing seats and the bearings, and other pin-jointing surfaces. 3.1.12 Head of the glutinous machine: There shall be no leakage of sample or rice at the separation box, sugar discharger and other places. 3.1.13 The fan impeller shall be tested for balance, and its accuracy shall not be lower than the requirements of G16 in AB9239. 3.2 Performance requirements
When the processed rice meets the requirements of GB135U for the third-grade rice, its performance index shall meet the requirements of Class 1. Table 1 Performance index of rice harvester bzxz.net
Hulling rate
Electricity consumption per ton of material
Content of rice husk
Glue content
Finished product
Dust concentration
Evening rice
Evening rice consumption
Rice
Name of rice
Note: For the machine without shell separation, there are no two indicators: the content of rice in the mixture and the number of rice in the shell. When the performance is measured, one of the early, late and late rice is selected.
3.3 Reliability
The effectiveness of the whole machine shall not be less than 2%,
3.4 Safety requirements
The outer cover transmission belt shall be equipped with a protective cover,
The instructions for installing full protection shall be included in the product manual. 4 Test methods
4.1 Test equipment and requirements
4.1.1 There shall be a site that meets the requirements and equipped with skilled test personnel. 4.1.2 The test prototype shall have a quality certificate and instructions for use. In the entire test room, except for the belt maintenance and aging as specified in the instructions for use, no other adjustments and maintenance are allowed. J8/10267-2006
4.1.3 The pressure of the test belt shall comply with the third grade specified in A1350 and shall be treated to remove iron. 4.1.4 The test instruments, meters, measuring tools and weighing tools shall be within the validity period of the verification. 4.1.5 The test voltage should be within the range of 3V and the deviation should not exceed ±5%. The motor load during the test shall not exceed 10% of the rated power. 4.2 Performance test
4.2.1 Test requirements
The performance test is carried out under the pure working hour productivity, and the deviation should be controlled within the range of ±10%. A pre-test is allowed before the formal test, and the pre-test time shall not exceed 20min. The test shall be carried out twice, and the time of each test shall not exceed 30min. The arithmetic mean of the two test data shall be taken as the measured value.
If any of the following situations occurs, the test shall be repeated: a) The invisible loss exceeds 1%; b) The weight of the machine material exceeds the weight of the feed material;
) The test is interrupted due to power failure or other reasons. During the formal measurement, the accurately weighed frost is added into the hopper, the prototype is started to run idle for 1-2min, and then the feed gate is opened to start feeding. At the same time, start timing and record the initial reading of the electric meter. The operator should operate slowly (no more than 2 seconds) to make each discharge port meet the specified requirements. At the moment when the rice grains in the hopper pass through the feed gate, close the feed gate, and at the same time, stop timing and record the reading of the electric meter. Stop the machine after each discharge port stops discharging. 4.2.2 Sampling method and sample processing
8) The sampling method and sample processing shall be carried out in accordance with the relevant provisions of G5491. b) Samples are collected once at the rice outlet and rice husk outlet for each test. Each time, samples are collected 5 minutes after the start of the test, and once every 10 minutes thereafter. Two samples are collected continuously each time, and the weight of each sample is not less than 1kg. One is the original sample and the other is the final sample. The two original samples are mixed and become the original samples of the test. The three parallel samples shall not be mixed and shall be separated and kept for future reference. After the test is completed and verified, they can be processed. Various samples shall be clearly marked and shall not be leaked or mixed. 4.2.3 Determination and calculation of several indicators
a) Pure working hour productivity
Where: E——pure working hour productivity, kg/h; 2 Processing box rice mass, kg;
——Test time, h,
b) Nominal unit power productivity:
Formula: E Nominal unit power productivity, kg (wh): P Nominal power of matching motor,.
C) Hulling rate, crushing rate, rice husk content in rice mixture: E
The original sample received from the brown rice outlet is separated into about 100 pieces according to the sample separation method specified in GB5491. After removing impurities, the rice and rice husks are weighed separately. The rice is weighed again and the rice is separated and weighed. Calculate the food according to the following formula: 3
Where: &——hulling rate, %;
Source quality, kg
Unhulled box mass, k:
——marrow extraction rate, %,
JB jin 10267—2061
Note: The marrow extraction rate is the percentage of the grain (calculated at half the rate without tax). The determination and calculation method shall be in accordance with the provisions of GB5495, where: 4-
Broken rice mass, kg; 1) Broken rice mass in rice mixture, %; 2) Broken rice mass in rice mixture, kg; 3) Frost content in rice mixture, kg; 4) Measured grain content in rice filling: Weigh the original sample taken from the outlet of the circulating filling, and count the number of full grains, which is the total husk content. 5) Power consumption per ton of material: 9-
Power consumption per ton of material, kw+ul; 1) Power consumption per ton of material, kw·h.
Product temperature rise:
Before the test, use a point thermometer to measure the temperature change of the frost valley, and measure the finished product temperature in the finished product 30min after the test begins. The difference between the two is taken as the measured value.
g) Noise:
The noise is measured in accordance with the provisions of GB/T 3763. The measuring points are located at the front, rear, east and west four points 1m from the machine surface and 15m from the ground. The average value is taken as the noise value. h) Dust concentration:
The measurement is carried out indoors. Ten minutes after the test begins, use a dust sampler to sample in the front and rear of the machine. The auxiliary points are 1m from the machine surface and 1.5m from the ground. The average value is taken. 4. 2. 4 Paint quality
The paint removal quality is checked in accordance with the relevant provisions of GB/T 5673. 4.3 Production trial adjustment
4. 3. The reliability, durability, adaptability and performance stability of the product under actual production conditions shall be assessed every month, as well as the durability and serviceability of key components and wearing parts. 4.3.2 Test time The production test shift time shall not be less than 300 hours. 4.3.3 Test items and methods JB/T10267—2001 4.3.3.1 For the approved parts, before and after the test, the parts shall be tested at different locations to verify the service time and total processing weight of the parts. If necessary, take photos of the damaged parts and attach drawings for illustration. 4.3.3.2 When the main damaged parts in the test are replaced, their pure work weight shall be calculated statistically. 4.3.3.3 During the production test, the performance of the prototype shall be measured at least three times at the beginning, middle and end of the test. The method shall be in accordance with the provisions of 4.2. 4.3.3.4 The prototype shall be tested for at least three consecutive production shifts. The operating time of each test shall not be less than 6 hours. 4.3.3.5 During the test, the following test conditions shall be observed and recorded: a) shift operating time, sample power, number and time of adjustment or failure troubleshooting methods; 6. Operating conditions, parts and components damaged and deformed parts and their causes, causes of failure and troubleshooting methods; quality assurance of reliability, suitability and finished product quality. 4.3.4 Calculation of technical and economic indicators
a) shift hour production Rate:
In the formula: -
One-hour productivity, kg/l1:
9--Shift output (raw grain) during the production assessment period, kg:--Non-shift time during the production assessment period, h.
b) Effectiveness:
Wu:
Effectiveness, %.
T--Operation time during the production test period, :
T--Fault elimination time during the production test period, h. c) Glue consumption:
In the formula, -Glue consumption, kgg
Quantity of rubber parts before use, g:
Description--Quality of rubber parts after use, g:
5 Inspection rules
5. The grain machine must be inspected and qualified by the factory quality inspection department, and attached The product can only be issued after the product has obtained the qualified certificate. (·8
5.2 The device quality and appearance quality of each product shall be checked before leaving the factory, and shall meet the requirements of 3.1.1, 3.1.7, 3.1.10 and 3.1.11. 5.3 The newly designed or rebuilt integrated milling machine shall be subject to performance test and type inspection including production test. 5.1 For the milling machines produced in normal batches, at least two units shall be sampled for performance inspection every year, and the results shall comply with the provisions of this standard. 5
JB/T1026+-2001
5.5 The ordering unit may conduct random inspection on the products leaving the factory according to the provisions of GB/T2828. The type, batch and AQL value of the random inspection shall be determined by negotiation between the ordering unit and the manufacturer.
6 Labeling, packaging, transport and storage
6.1.1 Product labels should be fixed on obvious positions of the machine. The product labels should comply with the provisions of GB/T 13306 and should include: a) product model and name b) matching power e) fast and slow speed d) net working hour productivity e) factory number and date d) gross mass 6.1.2 The following marks shall be made on the outer packaging: a) product name and model b) factory number and date d) manufacturer name d) packaging box dimensions e) net mass and gross mass e) symbols such as “anti-isolation” and “upward”. 1,3 When the user has special requirements, the marking can be executed according to the contract, (2 Packaging
6.2.1 Product packaging must be error-proof and must comply with transportation requirements and relevant regulations, and should ensure that the machine's text, spare parts and accessories are not lost. Export products are packaged according to the requirements of the foreign trade department, 6. 2.2 Random documents and spare parts
a) Instruction manual:
b) Inspection certificate:
e) Packing list:
) Spare parts and accessories (provided according to the provisions of the instruction manual 6.3 Transportation
Precautions should be taken during transportation, and the product should not be weighed and should be avoided from major impact. 6 4 Storage
The machine should be stored in a ventilated, dry warehouse without corrosive media, and should be protected from moisture and rust.2 When the main parts are damaged and replaced during the test, their working time shall be calculated and their deformation or damage shall be recorded. 4.3.3.3 During the production test, the performance of the prototype shall be measured at least three times at the beginning, middle and end of the test. The method shall be in accordance with the provisions of 4.2. 4.3.3.4 The prototype shall be tested for at least three consecutive production shifts. The working time of each test shall not be less than 6 hours. 4.3.3.5 During the test, the following test conditions shall be observed and recorded: a) shift working time, sample power, number and time of adjustment or failure; 6. Operating conditions, parts and parts damage deformation location and cause, fault cause and solution; quality of the product reliability, suitability and product quality. 4.3.4 Calculation of technical and economic indicators
a) Shift hourly productivity:
Where:
One-hour productivity, kg/l1:
9--shift output (raw grain) during the production assessment period, kg:
Non-shift time during the production assessment period, h.
b) Effectiveness:
Where:
Effectiveness, %.
T--operation time during the production test period, :
T--fault elimination time during the production test period, h. c) Glue consumption:
Where:
-Glue consumption, kgg
Quantity of rubber parts before use, g:
-Quality of rubber parts after use, g:
5 Inspection rules
5. The grain machine must be inspected and qualified by the factory quality inspection department, and can be shipped after the product qualification certificate is attached. (·8
5.2 Before the product leaves the factory, the device quality and appearance quality shall be checked one by one, and shall meet the requirements of 3.1.1, 3.1.7, 3.1.10 and 3.1.11. 5.3 The newly designed or rebuilt integrated milling machine shall be subject to performance test and type inspection including production test. 5.1 For the milling machines produced in normal batches, at least two units shall be sampled for performance inspection every year, and the results shall comply with the provisions of this standard. 5
JB/T1026+-2001
5.5 The ordering unit may conduct random inspection on the products leaving the factory according to the provisions of GB/T2828. The type, batch and AQL value of the random inspection shall be determined by negotiation between the ordering unit and the manufacturer.
6 6.1.1 Product labels should be fixed on obvious positions of the machine. The product labels should comply with the provisions of GB/T 13306 and should include: a) product model and name b) matching power e) fast and slow speed d) net working hour productivity e) factory number and date d) total mass 6.1.2 The following marks should be made on the outer packaging: a) product name and model b) factory number and date d) manufacturer name d) packaging box dimensions e) net mass and total mass e) symbols such as "anti-isolation" and "upward". 1,3 When the user has special requirements, the marking can be executed according to the contract, (2 Packaging
6.2.1 Product packaging must be error-proof and must comply with transportation requirements and relevant regulations, and should ensure that the machine's text, spare parts and accessories are not lost. Export products are packaged according to the requirements of the foreign trade department, 6. 2.2 Random documents and spare parts
a) Instruction manual:
b) Inspection certificate:
e) Packing list:
) Spare parts and accessories (provided according to the provisions of the instruction manual 6.3 Transportation
Precautions should be taken during transportation, and the product should not be weighed and should be avoided from major impact. 6 4 Storage
The machine should be stored in a ventilated, dry warehouse without corrosive media, and should be protected from moisture and rust.2 When the main parts are damaged and replaced during the test, their working time shall be calculated and their deformation or damage shall be recorded. 4.3.3.3 During the production test, the performance of the prototype shall be measured at least three times at the beginning, middle and end of the test. The method shall be in accordance with the provisions of 4.2. 4.3.3.4 The prototype shall be tested for at least three consecutive production shifts. The working time of each test shall not be less than 6 hours. 4.3.3.5 During the test, the following test conditions shall be observed and recorded: a) shift working time, sample power, number and time of adjustment or failure; 6. Operating conditions, parts and parts damage deformation location and cause, fault cause and solution; quality of the product reliability, suitability and product quality. 4.3.4 Calculation of technical and economic indicators
a) Shift hourly productivity:
Where:
One-hour productivity, kg/l1:
9--shift output (raw grain) during the production assessment period, kg:
Non-shift time during the production assessment period, h.
b) Effectiveness:
Where:
Effectiveness, %.
T--operation time during the production test period, :
T--fault elimination time during the production test period, h. c) Glue consumption:
Where:
-Glue consumption, kgg
Quantity of rubber parts before use, g:
-Quality of rubber parts after use, g:
5 Inspection rules
5. The grain machine must be inspected and qualified by the factory quality inspection department, and can be shipped after the product qualification certificate is attached. (·8
5.2 Before the product leaves the factory, the device quality and appearance quality shall be checked one by one, and shall meet the requirements of 3.1.1, 3.1.7, 3.1.10 and 3.1.11. 5.3 The newly designed or rebuilt integrated milling machine shall be subject to performance test and type inspection including production test. 5.1 For the milling machines produced in normal batches, at least two units shall be sampled for performance inspection every year, and the results shall comply with the provisions of this standard. 5
JB/T1026+-2001
5.5 The ordering unit may conduct random inspection on the products leaving the factory according to the provisions of GB/T2828. The type, batch and AQL value of the random inspection shall be determined by negotiation between the ordering unit and the manufacturer.
6 6.1.1 Product labels should be fixed on obvious positions of the machine. The product labels should comply with the provisions of GB/T 13306 and should include: a) product model and name b) matching power e) fast and slow speed d) net working hour productivity e) factory number and date d) total mass 6.1.2 The following marks should be made on the outer packaging: a) product name and model b) factory number and date d) manufacturer name d) packaging box dimensions e) net mass and total mass e) symbols such as "anti-isolation" and "upward". 1,3 When the user has special requirements, the marking can be executed according to the contract, (2 Packaging
6.2.1 Product packaging must be error-proof and must comply with transportation requirements and relevant regulations, and should ensure that the machine's text, spare parts and accessories are not lost. Export products are packaged according to the requirements of the foreign trade department, 6. 2.2 Random documents and spare parts
a) Instruction manual:
b) Inspection certificate:
e) Packing list:
) Spare parts and accessories (provided according to the provisions of the instruction manual 6.3 Transportation
Precautions should be taken during transportation, and the product should not be weighed and should be avoided from major impact. 6 4 Storage
The machine should be stored in a ventilated, dry warehouse without corrosive media, and should be protected from moisture and rust.