JB/T 8053-1996 Direct-acting bistable solenoid valve for refrigeration system
Some standard content:
Mechanical Industry Standard of the People's Republic of China
JB/T 805396
Direct-acting bistable solenoid valve for refrigeration system 1996-09-03 IssuedWww.bzxZ.net
Ministry of Machinery Industry of the People's Republic of China
J997-07-Implementation
J80539
Direct-acting bistable solenoid valve uses dynamic current to realize state change. It has the function of maintaining the original closed point for a long time without external signal.
Compared with the existing standard for monostable solenoid valves (which can be called monostable solenoid valves), this standard not only eliminates the distinction between normally open and normally closed types, but also eliminates the provisions of the maximum valve stop difference, the minimum valve difference, and the allowable change of the rated voltage. This standard has been adjusted and the maximum age of the solenoid valve has been added.
This standard was proposed and approved by the Technical Committee for Standardization of Refrigeration Equipment of the Ministry of Machinery Industry, and the drafting unit of this standard is Zhuhai Bada Electromechanical Co., Ltd. This standard is the first and last edition.
Standard of the Machinery Industry of the People's Republic of China
Dynamic bistable solenoid valve for refrigeration system B/In539
This standard covers the type test, basic warning numbers, technical requirements, test methods, control rules and markings of electromagnetic valves (hereinafter referred to as electric valves), and can also be used for flow control devices such as flow regulating devices.
2 Referenced standards
The following clauses are included in the standard and will become the text of this standard through reference in the standard. When the standard is revised, the versions shown are all in effect. All parties who do not have the standard should explore the possibility of using the latest version of the standard. GT 2424. 3 -81
GR 283R-87
"Definition
City industry application for the following product damage continuous test ship up test (a, constant humidity and heat test method for batch by batch ductility test process and description table (applicable to continuous batch drug inspection station) This standard class uses the following definitions,
3.1 Temperature shift state electric
Scientifically determined by the magnetic field of the magnetic line, which makes the core of the dense material move to the position of the fluid to open and close, and the valve core maintains the same position in both the opening and closing states. Nine oxygen applied energy, 3.2 Dynamic type steady state solenoid valve
Accept the standard of the road, according to the river reading direct variable control, 4 types and basic parameters
4.1 Product type: dynamic type.
4.2 Model: capital Chinese characters and Arabic numerals. The following is the method of expression: DFS
Enterprise closed, month F indicates, otherwise not indicated
Soft seal: Yu R indicates, then indicates
Line diagram DC project ugly: Use numbers to indicate: According to Table 1) Valve nominal diameter: Use numbers to indicate flow, ranr (according to Table 1> Automatic type bistable concept Shentun adjustment code
Model example:
: TF53-20, nominal diameter 3Fm line diagram DC Union 202 US self-acting stable inductor: approved by the Ministry of Machinery Industry on September 3, 1996
implemented in 1997U7-01
JD/T8053
b) DFS68uRF: nominal diameter Tr, line resistance n type sealed umbrella closed automatic double secret state electric question reading 4.3 basic data: specified on the report.
nominal H force
nominal diameter
diagram current
production area retreat degree
s technical requirements
CEI, GE4.4.2
1.,2.2.5.3,3.5:.5,6.8,tu
1.25.2.5.5.10.20,40.80,15c
5.1 The electromagnetic network shall be made in accordance with the provisions of this standard and the drawings and technical documents approved by the specification procedure. 2 The surface of the electrical diagram shall be smooth, and there shall be no hair marks on the surface of the metal brush. The surface shall be slippery: there shall be a vehicle number and a certificate mark: 5.3 The internal body shall contain no more than 0.1mg of impurities 5.4 The pressure shall be not less than 400 gram. The DC resistance shall be not less than 1mV. The withstand voltage shall be 1raim without breakdown and flashover. The line resistance shall be less than 4142 gram. This test shall not be carried out. 5.5 Insulation resistance
The direct current resistance between the electromagnetic coil terminal and the outer shell in cold state should not be less than 20M2. In wet state, it should not be less than 1M. 5.6 Air pressure strength
The insulation resistance between the electromagnetic coil terminal and the outer shell in cold state should not be less than 2M2. In wet state, it should not be less than 211. In wet state, it should not be less than 1M. 5.6 Air pressure strength
The insulation resistance between the electromagnetic coil terminal and the outer shell in cold state should not be less than 211. In wet state, it should not be less than 1M. 5.6 Air pressure strength
The insulation resistance between the electromagnetic coil terminal and the outer shell in cold state should not be less than 211. In wet state, it should not be less than 1M. S.7 Airtightness test 1. Under nominal sub-storage conditions, the external combustion engine supplier shall inspect the leakage. 5. The monthly leakage volume is graded, graded, grade II and alternative grade. Under 0.1MP hydrogen or explosion chamber pressure, the leakage end is not allowed to exceed the following values: grade I, diameter d~c.iml/min; grade II: diameter xlm./aint; grade II: diameter × 1cmT./min: ordinary leakage: determined according to user requirements and actual working conditions 5.9 Opening capacity under quasi-pulse current: U.4MPa: specified standard impulse conditions: pulse width 10ms: pulse current barrel 1: [=3.15/R (—nominal diameter of the chain network.amR—DC reactance of the two groups of reactants,). 5.10 Working life
Under standard pulse condition and normal temperature, the electromagnetic valve should be able to withstand continuous opening and closing test of 100000 times at a rate of 30 times/min. After the test, the working difference and internal leakage of all indicators should meet the requirements. 5.11 Before working, the electromagnetic valve should withstand the positive test of 10Hz and acceleration of 20m/min. After the test, the valve can open and close normally without any change.
JB/T805396
5.12 From the time the valve leaves the factory, if there is any fault in the parts, the manufacturer shall replace it free of charge if the product cannot be used normally within 1 year.
6 Test method
6.1 Test environment
Temperature: 5~25
Relative humidity: 13%--5:
Gas: B6--106kPa
6.2 Instruments and end
Measurement instruments, the specification shall not be less than 117:
Measuring instruments, the precision shall not be less than 1.5 grade. 6.3 Electric strength test
6.3.1 Cold electric strength
The power supply of the test is a sine wave with a frequency of 50H. When testing, the voltage should be opened from 1/3 of the specified test voltage, and the time should be about 5:, and the specified value should be calculated gradually, and then the pressure should be maintained. After the pressure is applied, the sharpness should be avoided. The test results should be light breakdown and mechanical flashover 6.3.2 Tidal electric strength
Carry out limited test on the electromagnetic attachment according to the provisions of G2.1. The test can be 4h when the power source is connected. Immediately after the test, carry out the weather resistance test according to the requirements of 6.3.1. There should be no breakdown. 6.4 Test by electric positive type
64.1 For the electric inspection room with direct current not less than 105, the following provisions shall be followed: (4.1. [cold insulation type
under the test environment, use 50V megohmmeter to measure the insulation of the line and the shell. Type small 10M6.4.1.2 Wet insulation parts
are subjected to the electromagnetic plate specified in GB2423.3 for hot test, without power supply: the test time is 48h. The test piece is immediately tested with 500V batch exchange system. The insulation resistance of the lead wire and the shell should be not less than 1M. 6. +2 For the insulation resistance test of the electric cabinet with a load DC resistance less than 458, the following provisions shall be followed: 6.4.2.1 Cold insulation parts
under the test environment, use 00V megohmmeter to measure the insulation resistance of the line and the shell. Type small 10M6.4.1.2 Wet insulation parts
under the test environment, use 500V megohmmeter to measure the insulation resistance of the lead wire and the shell. Type small 10M6.4.1.3 The insulation resistance between the coil and the external circuit should be less than 2M. 6.4.2.2 Insulation resistance in a state of damp heat test. Do not connect the power supply. The test time is 48h. The tester immediately uses a 50UV megameter to measure the insulation resistance between the coil terminal and the external circuit. It should be not less than 1M. Gas test. Put the coil in an open state. When the outlet is filled with 1.25 times the nominal pressure, the inlet is filled with a combination of gas or a chamber gas to maintain a pressure of 1mm. There should be no hysteresis, deformation, or cracking (safety measures should be taken). 6.6 Leakage test. Put the valve in an open state. The outlet pipe is closed, and the inlet pipe is filled with the nominal pressure test gas or the air under pressure. The body is immersed in water to ensure that there is no leakage source. 0.7 Internal leakage test
Test medium: gas, air.
Internal leakage is determined by the penetration method, the test medium is left in the closed state, the inlet is 1: the test medium is placed in the pipe under pressure. The outlet is connected in the simplest way of drainage, 1r later (the capacity of the relevant body is shown). The result should meet the requirements of 5.8, the addition!: small digging type (1) calculation: one absolute pressure MP:
Calculated working pressure difference, MFa
positive pressure MPa.
JB/r8053-96
6. Opening capacity under standard pulse current The general test method is shown in Figure 1. 1
The working voltage in the figure is 5. The test is carried out for 5 minutes, and the voltage is kept constant at 1°C (the constant output voltage or pulse application degree must be guaranteed). Each time the voltage is turned on, it can be turned on at a minimum MPa error. 6.9. Test method
Under the condition of negative load, the power supply can not start the test. The ICC0000 efficiency of 5.8 and 5.9 should be tested. The internal leakage capacity of the valve should be tested. The test should be carried out at intervals of 25 minutes and 556 minutes. .10 o'clock, make a shaking test
on the vibration path agreed in the diagram, adjust the test frequency to 10Hz, the speed to 20n/\, and make a vibration test on the electromagnetic reading parallel to the core axis. During the test, a load of 0.5% of the nominal force (the original can be empty) can be added. The disk reading needs to be tested under the normal condition. The test results meet the requirements of 11. 6. The content of impurities in the reading is measured by the single point of the insurance, and the pure surface is filled from the population pipe. The 4th of the intelligence is exhausted, the version is wide and beautiful Poppet valve, stay for 1% and then open the valve, wait for alcohol to sweep and weigh the filter paper. The value before and after the test is the calculated value of impurities, which should comply with the provisions of 5.3.
Center 12 Appearance inspection
Inspect under natural light.
School inspection rules
E-commerce ceramics can only be shipped after passing the inspection! , and there are product consultation, product instructions, etc., and the inspection for electronic products is divided into factory inspection and type inspection.
7.1 Export inspection
JB/T 8053-: 06
1. Each solenoid valve shall be inspected. The inspection items are shown in Table 2. Except for the electrical strength and the internal components, the rest are mandatory inspections. The inspection method shall be carried out in accordance with GB2628. The inspection level is specified as the general inspection level 1. The qualified quality is A0L-65, and the normal inspection is adopted. Items
Air tightness
Ground source resistance cold)
Standardized current under the scientific capacity
Contents|| tt||Internal leakage
Technical requirements
7.1.2: The user shall conduct local inspection according to the factory inspection items. We must add other items of this standard 7.2 Type inspection
If any of the following situations does not occur in 2.1, type inspection shall be carried out: a) New products manufactured for trial;
There are major changes in the design, process and sealing materials
) Production is resumed after one year of suspension;
d) Products in continuous production, not less than once every year. Type inspection includes all items specified in the final certification. 7.2.2 Sampling and judgment of western-style inspection
Test method
Three pieces are randomly sampled from the qualified products purchased from the factory. During the inspection, if one item does not meet the standard requirements, double the number of samples should be sampled from the batch of products to repeat the unqualified item. If there is still one unqualified item, the batch of products will be treated as unqualified: 8 Marking, packaging and storage
8! 1 There should be product model, limit door nominal diameter, DC resistance, internal temperature grade mark. 8.2 The following marks should be printed on the outer packaging,
a) Product model and name;
Company trademark
c) Manufacturer's name;
d) Transportation precautions, etc.
8.3 Packaging
The electric valves to be transported in boxes are placed in special shaped foam boxes. Most of the original models are packed in the same packaging. The packaging box should be accompanied by the product address and product manual. 8.4 Storage
The electric valves should be placed in a ventilated warehouse with a relative humidity of no more than %, and there should be no corrosive gas around. 5