title>Packaging - Basic tests for transport packages - Part 9:Water spray test - GB/T 4857.9-2008 - Chinese standardNet - bzxz.net
Home > GB > Packaging - Basic tests for transport packages - Part 9:Water spray test
Packaging - Basic tests for transport packages - Part 9:Water spray test

Basic Information

Standard ID: GB/T 4857.9-2008

Standard Name:Packaging - Basic tests for transport packages - Part 9:Water spray test

Chinese Name: 包装 运输包装件基本试验 第9部分:喷淋试验方法

Standard category:National Standard (GB)

state:in force

Date of Release2008-05-27

Date of Implementation:2009-01-01

standard classification number

Standard ICS number:ICS Packaging and transportation of goods >> 55.020 Packaging and transportation of goods

Standard Classification Number:Comprehensive>>Marking, packaging, transportation, storage>>A80 Marking, packaging, transportation, storage Comprehensive

associated standards

alternative situation:Replaces GB/T 4857.9-1992

Procurement status:IDT ISO 2875:2000

Publication information

publishing house:China Standards Press

ISBN:155066·1-32383

Plan number:20061403-T-469

Publication date:2008-08-01

other information

Release date:1986-02-13

drafter:Lan Shumei, Zhang Jin, Zhao Hua, Bai Zhigang, Su Xuefeng

Drafting unit:Railway Ministry Standards and Metrology Research Institute

Focal point unit:National Packaging Standardization Technical Committee (SAC/TC 49)

Proposing unit:National Packaging Standardization Technical Committee (SAC/TC 49)

Publishing department:General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China Standardization Administration of China

competent authority:National Standardization Administration

Introduction to standards:

GB/T 4857 "Basic Tests for Packaging and Transport Packages" is divided into 23 parts, and this part is the 9th part of GB/T 4857. This part is equivalent to ISO 2875:2000 "Spray Test for Complete and Fully Packed Transport Packages and Unit Cargo". This part replaces GB/T 4857.9-1992 "Spray Test Method for Packaging and Transport Packages". This part of GB/T 4857 specifies the main performance requirements, test procedures and test report contents of the test equipment used in the spray test of transport packages and single cargo. It can also be used as a pretreatment method before other tests on packages to study the reduction of package strength caused by water spray. This part is applicable to the assessment of the anti-unloading performance of transport packages and single cargoes against rain and the protection ability of packaging to the contents. It can be used as a single test or as a component of a series of tests. The main changes of this part compared with GB/T 4857.9-1992 are as follows: - The scope was changed from only applicable to transport packages to applicable to transport packages and unit cargo; - A chapter on terms and definitions was added, and the term "test sample" was added; - Continuous and intermittent spraying were added to Chapter 4 Test Principles; - Method A and Method B were added to 5.2; - 6.1 to 6.3 (1992 edition) were cancelled; - Chapter 6 was added; - 5.3 Water spray system was added; - 5.4 Schematic diagram of spraying device and Figure 1 were added; - Chapter 5 (1992 edition) was modified to 7.1 (this edition); - The content of the test report was modified. GB/T 4857.9-2008 Basic tests for packaging and transport packages Part 9: Spray test method GB/T4857.9-2008 standard download decompression password: www.bzxz.net
This part of GB/T4857 specifies the main performance requirements, test procedures and test report contents of the test equipment used in the spray test of transport packages and unit cargo. It can also be used as a pretreatment method before other tests on packages to study the reduction of package strength caused by water spray. This part is suitable for evaluating the unloading resistance of transport packages and unit cargo to rain and the protection ability of packaging to the contents. It can be used as a single test or as part of a series of tests.
GB/T4857 "Basic tests for packaging and transport packages" is divided into the following parts:
--- Part 1: Marking method of various parts during the test;
--- Part 2: Temperature and humidity conditioning treatment;
--- Part 3: Static load stacking test method;
--- Part 4: Compression and stacking test method using a pressure testing machine;
--- Part 5: Drop test method;
--- Part 6: Rolling test method;
--- Part 7: Sinusoidal fixed frequency vibration test method;
--- Part 9: Spray test method;
--- Part 10: Sinusoidal variable frequency vibration test method;
--- Part 11: Horizontal impact test method;
--- Part 12: Immersion test method;
---Part 13: Low pressure test method;
---Part 14: Overturn test method;
---Part 15: Controlled horizontal impact test method;
---Part 17: General principles for preparing performance test outlines;
---Part 18: Quantitative data for preparing performance test outlines;
---Part 19: Circulation test information record;
---Part 20: Impact test method;
---Part 21: Mildew resistance test method;
---Part 22: Unit load stability test method;
---Part 23: Random vibration test method. This part
is Part 9 of GB/T 4857.
This part is equivalent to ISO 2875:2000 "Spray test for complete and fully packed transport packages and unit loads".
This part replaces GB/T 4857.9-1992 “Spray test method for packaging and transport packages”.
Compared with GB/T 4857.9-1992, the main changes of this part are as follows:
--- The scope was changed from only applicable to transport packages to applicable to transport packages and unit cargo;
--- A chapter on terms and definitions was added, and the terms of test samples were added;
--- Continuous and intermittent spraying were added to Chapter 4 Test Principles;
--- Method A and Method B were added to 5.2;
--- 6.1 to 6.3 (1992 edition) were cancelled;
--- Chapter 6 was added;
--- 5.3 Water spray system was added;
--- 5.4 Schematic diagram of spraying device and Figure 1 were added;
--- Chapter 5 (1992 edition) was changed to 7.1 (this edition) after being modified;
--- The content of the test report was modified.
This part is proposed and managed by the National Technical Committee for Packaging Standardization (SAC/TC49).
The drafting unit of this part: Standard and Metrology Research Institute of the Ministry of Railways.
The main drafters of this part: Lan Shumei, Zhang Jin, Zhao Hua, Bai Zhigang, Su Xuefeng.
The previous versions of the standards replaced by this part are:
---GB4857.9-1986; GB/T4857.9-1992.
The clauses in the following documents become the clauses of this part through reference in this part of GB/T4857. For all dated referenced documents, all subsequent amendments (excluding errata) or revisions are not applicable to this part. However, the parties to the agreement based on this part are encouraged to study whether the latest versions of these documents can be used. For all undated referenced documents, the latest versions are applicable to this part.
GB/T4857.1 Method of marking various parts during testing of packaging and transport packages (GB/T 4857.1-1992, ISO2206:1987, MOD)
GB/T4857.2 Temperature and humidity adjustment treatment of packaging and transport packages (GB/T4857.2-2005, ISO2233:2000, MOD)

Some standard content:

ICS55.020
National Standard of the People's Republic of China
GB/T4857.9—2008/IS02875:2000 replaces GB/T4857.9—1992
Basic tests for transport packages
Part 9: Water spray test
PackagingBasic tests for transport packages-Part 9:Water spray test
(ISO 2875:2000,Packaging—Complete, filled transport packages andunitloads-Water-spraytest,IDT)2008-05-27 issue
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China Standardization Administration of China
2009-01-01 implementation
GB/T4857 "Basic tests for packaging and transport packages" is divided into the following parts: Part 1: Marking method of various parts during the test; Part 2: Temperature and humidity adjustment treatment;
-Part 3: Static load stacking test method;-Part 4: Compression and stacking test method using a pressure testing machine; Part 5: Drop test method;
Part 6: Rolling test method;
Part 7: Sine Constant frequency vibration test method; Part 9: Spray test method; Part 10: Sine variable frequency vibration test method; Part 11: Horizontal impact test method; Part 12: Immersion test method; Part 13: Low pressure test method; Part 14: Overturning test method; Part 15: Controlled horizontal impact test method; Part 17: General principles for preparing performance test outlines; Part 18: Quantitative data for preparing performance test outlines; Part 19: Circulation test information record; Part 20: Collision test method; Part 21: Rainproof test method; Part 22: Unit cargo stability test method; Part 23: Random vibration test method. This part is Part 9 of GB/T4857.
GB/T4857.9—2008/IS02875:2000 This part is equivalent to ISO2875:2000 "Spray test for complete and fully packed transport packages and unit cargo". This part replaces GB/T4857.9—1992 "Spray test method for packaging and transport packages". Compared with GB/T4857.9-1992, the main changes of this part are as follows: the original scope was changed from only applicable to transport packages to applicable to transport packages and unit cargo; a chapter on terms and definitions was added, and the term "test sample" was added; continuous and intermittent spraying were added to Chapter 4 Test Principle; Method A and Method B were added to 5.2;
- Cancelled 6.1 to 6.3 (1992 edition); added Chapter 6;
Added 5.3 Water spray system;
Added 5.4 Schematic diagram of spraying device and Figure 1; Modified Chapter 5 (1992 edition) and changed to 7.1 (this edition); Modified the content of the test report.
This part was proposed and managed by the National Technical Committee for Packaging Standardization (SAC/TC49). GB/T4857.9-2008/1S02875:2000 Drafting unit of this part: Standard Metrology Institute of the Ministry of Railways. The main drafters of this part: Lan Shumei, Zhang Jin, Zhao Hua, Bai Zhigang, Su Xuefeng The previous versions of the standards replaced by this part are: -GB4857.9-1986; GB/T4857.9-1992. H
1 Scope
GB/T4857.9--2008/IS02875:2000 Basic tests for packaging and transport packages
Part 9: Spray test method
This part of GB/T4857 specifies the main performance requirements, test procedures and test report contents of the test equipment used in the spray test of transport packages and unit cargo. It can also be used as a pretreatment method before other tests on the package to study the reduction of the strength of the package caused by water spray.
This part is applicable to the assessment of the anti-unloading performance of transport packages and unit cargo against rain and the protection ability of the packaging to the contents. It can be used as a single test or as part of a series of tests. 2 Normative references
The clauses in the following documents become clauses of this part through reference in this part of GB/T 4857. For dated references, all subsequent amendments (excluding errata) or revisions are not applicable to this part. However, parties to agreements based on this part are encouraged to study whether the latest versions of these documents can be used. For undated references, the latest versions apply to this part.
GB/T 4857.1 Method of marking various parts during testing of packaging and transport packages (GB/T 4857.1-1992 ISO 2206: 1987, MOD)
GB/T 4857.2 Temperature and humidity conditioning treatment of packaging and transport packages (GB/T 4857.2-2005, ISO 2233: 2000, MOD)
3 Terms and definitions
The following terms and definitions apply to this part of GB/T 4857. 3.1
Test samplestestspecimen
Completely filled transport packages and unit cargo. 4 Test principle
Place the test sample on the test site and spray the surface of the test sample with water at a certain temperature at a predetermined time and rate. The spraying method is divided into continuous (method A) and intermittent (method B). 5 Test equipment and conditions
5.1 Test sitebzxz.net
The test site should meet the following requirements:
-Insulation and heating: If it is necessary to control the temperature of the test site, the site can be insulated or heated. The ground of the site should be equipped with a 1
GB/T4857.9--2008/IS02875:2000 grid floor and a drainage port of sufficient capacity so that the sprayed water can be automatically drained away and the test sample will not be soaked in water. The striped floor should have a certain hardness, and the spacing between the strips should not be too wide to prevent deformation of the test sample; Height: The height of the test site should be appropriate, so that the distance between the water nozzle and the top of the test sample is at least 2m, which can ensure that the water can spray vertically. The area of ​​the test site should be at least 50% larger than the bottom area of ​​the test sample, so that the test sample is within the spray area.
5.2 Spraying device
The spraying device should meet the water spraying rate of 100L/(m2,h) ± 20L/(m2·h). The sprayed water should be fully even, and the height of the nozzle should be adjustable to keep a distance of at least 2m between the water nozzle and the top of the test sample, which should meet the requirements of Chapter 7. The installation requirements for methods A and B are as follows:
Method A (continuous spray): the nozzles are arranged neatly and fixed above the test sample, and the height can be adjusted; Method B (intermittent spray): one or several rows of nozzles are arranged along the width direction of the test sample, and the nozzles are moved along a direction greater than the length of the test sample, which should meet the requirements of Chapter 7, and the continuous spraying interval time is not more than 30s. 5.3 Water supply system
Supply water at 5℃~30℃ at the rate and pressure required by 5.2. 5.4 Spraying device
See Figure 1 for a schematic diagram of the spraying device.
Unit: mm
Figure 1 Schematic diagram of the spray test device
Overflow;
Height adjustment;
Test sample:
Circulating pump or mesh system;
Grid plate;
Drainage outlet;
7 Range of movement of the nozzle;
Dimensions of the test sample.
6 Preparation of test samples
Figure 1 (continued)
GB/T4857.9—2008/IS02875:2000Put the pre-filled contents into the test sample and seal the package according to the normal sealing procedure for shipment. Note 1: If simulated contents are used, their dimensions and physical properties should be as close as possible to those of the pre-filled contents. Similarly, the sealing method should be the same as that used for shipment.
Note 2: Select a condition according to the requirements of GB/T4857.2 to pre-treat the test sample with temperature and humidity. 7 Test procedure
7.1 Calibration
7.1.1 Install the nozzle 2m above the grid floor surface, and the nozzle should be vertically downward. 7.1.2 Place several identical top-opening containers evenly on the floor, requiring that they should cover at least 25% of the floor area. The top opening area of ​​each container should be between 0.25m~0.50m2. Its height should be between 0.25m and 0.50m. 7.1.3 Then turn on the nozzle and measure the time it takes for the first container and the last container to be filled with water. 7.1.4 The time required for the first container to be filled with water shall not be less than the time required for spraying water at a rate of 120L/(m·h); the time required for the last container to be filled with water shall not be more than the time required for spraying water at a rate of 80L/(m2·h). 7.2 Test steps
7.2.1 Adjust the height of the nozzle so that the distance between the nozzle and the nearest point on the top of the test sample is at least 2m. Turn on the nozzle until the entire system reaches a state of equilibrium. Unless otherwise specified, the temperature of the sprayed water and the temperature of the test site shall be between 5℃ and 30℃. GB/T4857.9—2008/IS02875:20007.2.2 Place the test sample at the test site, at the predetermined position and temperature, so that water can fall on the test sample according to the calibration standard and spray continuously for a predetermined time. 7.2.3 Check the test sample and its contents to see if there is any degradation of waterproof performance or water seepage. 8 Test report
The test report shall include the following contents:
a) Description of the test being carried out in accordance with this part;
b) Name and address of the laboratory, name and address of the customer: unique mark of the report;
Date of receipt of the test article and date and number of days of completion of the test: name, position and signature of the person in charge;
Description of the test results only valid for the test sample;
Without laboratory certification, the copy of the partial report is invalid: number of test articles;
Detailed description: name, size, structure and material specifications of the packaging container, cushioning, support, fixing method, sealing, bundling status)
and other protective measures, total weight of the package and net weight of the contents, in kilograms (kg); name, specification, model, quantity, etc. of the contents. If simulated contents are used, detailed description shall be given;
Pretreatment temperature, relative humidity and time. The temperature and relative humidity of the test site during the test and whether these values ​​comply with the provisions of GB/T4857.2;
Use method A or method B:
m) Use the marking method specified in GB/T4857.1 to describe the state of the test sample during the test; the temperature of the test site and the temperature of the water during the test; n
Test duration;
Describe the differences between the test method used and this part; p)
q) Record of test results and any observed phenomena that can help correctly interpret the test results. Copyright exclusive infringement must be investigated
Book number: 155066: 1-32383
GB/T4857.9-2008
Pricing:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.