title>Measurement management systems—Requirements for measurement processes and measuring equipment - GB/T 19022-2003 - Chinese standardNet - bzxz.net
Home > GB > Measurement management systems—Requirements for measurement processes and measuring equipment
Measurement management systems—Requirements for measurement processes and measuring equipment

Basic Information

Standard ID: GB/T 19022-2003

Standard Name:Measurement management systems—Requirements for measurement processes and measuring equipment

Chinese Name: 测量管理体系 测量过程和测量设备的要求

Standard category:National Standard (GB)

state:in force

Date of Release2004-03-01

Date of Implementation:2004-03-01

standard classification number

Standard ICS number:Sociology, Services, Organization and management of companies (enterprises), Administration, Transport>>Quality>>03.120.10 Quality management and quality assurance

Standard Classification Number:General>>Standardization Management and General Regulations>>A00 Standardization, Quality Management

associated standards

alternative situation:GB/T 19022.1-1994 GB/T 19022.2-2000

Procurement status:ISO 10012:2003,IDT

Publication information

publishing house:China Standards Press

ISBN:155066.1-20212

Publication date:2004-03-01

other information

Release date:1994-11-28

Review date:2004-10-14

drafter:Chen Wei, Tian Wu, Wang Shunan, Zhao Ruojiang, Dai Runsheng, Wang Weinong, Li Renliang, Huang Yaowen

Drafting unit:China Association for Standardization, Department of Metrology of the General Administration of Quality Supervision, Inspection and Quarantine, China Institute of Metrology and Testing

Focal point unit:National Technical Committee on Quality Management and Quality Assurance Standardization

Proposing unit:China Association for Standardization

Publishing department:General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

competent authority:National Standardization Administration

Introduction to standards:

This standard is equivalent to ISO 10012:2003 and is one of the GB/T 19000 family of standards. The standard specifies the general requirements for the management of metrological confirmation of measurement processes and measuring equipment, and provides guidance for supporting and demonstrating compliance with metrological requirements. It specifies the quality management requirements of the measurement management system, which can be used by the organization performing the measurement as part of the overall management system to ensure that the metrological requirements are met. GB/T 19022-2003 Measurement management system requirements for measurement processes and measuring equipment GB/T19022-2003 Standard download decompression password: www.bzxz.net
This standard is equivalent to ISO 10012:2003 and is one of the GB/T 19000 family of standards. The standard specifies the general requirements for the management of metrological confirmation of measurement processes and measuring equipment, and provides guidance for supporting and demonstrating compliance with metrological requirements. It specifies the quality management requirements of the measurement management system, which can be used by the organization performing the measurement as part of the overall management system to ensure that the metrological requirements are met.


Some standard content:

GH/T19022—2003/ISOCC12.20G3 This standard is equivalent to this standard (154) 10012, 2c93 measurement system measurement process and equipment requirements 3. This standard is / read "standard" (indicates requirements "when \d> discussion * etc.: || tt || This standard replaces ([3/: 302.1—1554 GB19023.2—2033 This standard is equivalent to (3.>/113: 322.119 The main differences between GB/T 1900 and G/T: 8022.2-2 are as follows: 1. The role of the quality management system in the organization, G/T 1900 standard coordination information: the basic requirements of the measurement management system, the total amount of the measurement is noted in the GB/T 13000 standard. This standard uses the word "by default", when the requirements are determined according to the legal regulations (2. The appendix of the measurement confirmation and verification standard is informative The standard is issued by the China Standardization Administration of China. The standard is jointly promoted by the China Standardization Administration, the China Quality Management Bureau, the China Environmental Protection Research Institute, the Jiangsu Provincial Quality and Technical Supervision Bureau, and the China Environmental Protection Research Institute. The candidates for this standard are Jilang, Yinwu, Gongsian, Zhao Ting, Chengrun For health, agriculture, etc., release the super text, GB/T19022-2003/I5010J12:2003ISO is the original standard of the world's social standardization organization, which is the work of the committee to complete the work of the international standard. The member groups have the right to participate in the work of the committee and keep in touch with the relevant working groups (including non-governmental or non-governmental organizations). They can also participate in the work of the International Electrotechnical Commission [F] In terms of technical standardization, the S&M Standards Committee maintains the relationship with international standards in accordance with the current rules for drafting technical standards. The technical proposal is submitted to the member bodies for voting by all members. It is necessary to obtain the public vote of the member bodies before it can be officially published as an international standard. Please note that some of the patents in this document may be abandoned. S&M is not responsible for any other patent issues.
)0012小:75S:Quality management plan Ensure that the design committee supports: support the technical committee to formulate, 3 2, 202 shares to replace 1S) 112-1: 1 price 4 and 15) 12-2, 1997. Scan these 2 items for technical revision.
GB/T19022-2033/TSO10012:20.3-Effective measurement of sound environment to ensure that the measurement equipment and measurement process are appropriate to the risk creation period, three to achieve product quality and Chery collection of wind experience, measurement management system daily standard card The book contains the idea of ​​measuring the quality of the system, the design of the system, the measurement technology of the whole process of scientific control, in this standard, the term "measurement is the process of measurement" is applicable to the measurement activities in the actual area:, the system, the market production, the diagnosis and testing of the following flow can be used in this standard:
· When the product is required by the regulations; · When the product is provided by the regulations:, within the flow and the execution machine; || tt||, the assessment of the quality management system is the key point of the standard. The process of achieving product quality is the most important process for technical organizations to maintain product quality. Figure 1 shows the quality management system model of this standard. This standard includes two parts: the requirements and the implementation guide. The "requirements" can be used to measure the quality of the product and the "guidelines" can be used as a carrier. The "guidelines" are only part of the management system. The "requirements" are for information purposes only. The organization has the right to add, modify or modify the quality management system. The technical standards will not add, omit or replace any requirements of other standards. Complying with the requirements of this standard has the following requirements: meeting the requirements of other standards, such as 7.6B/T 1696, 7.5, 7.6B/T 1901--m, 6.1. 4. Dongfa has improved the measurement management system model and the measurement process recognition and the measurement acceptance system model. 1. Scope of measurement management system GB/T 19022-2003/1S010012:2J03 Requirements for measurement process and measurement equipment This standard specifies the requirements for the use of measurement equipment in the measurement process, and provides the internal and external support for the use of measurement equipment to meet the measurement requirements. Bao stipulates the quality management requirements of the measurement management system, and can be carried out as part of the overall management system to ensure that the measurement requirements are met.
This standard is not intended to be used as a necessary condition for the use of this standard. It can be used as an input to meet the inspection requirements of various measurement bodies in the certification process. This standard does not intend to increase or increase the requirements of C/T15451(dt1S)/IF:17025) standard. If the measurement party determines the specific requirements of other standards and guidelines, the person may make a virtual and real note. 2 Normative reference documents
The following documents have become the provisions of this standard through the reference of unmodified standards. F is a reference document of the period, and its revision or revision (excluding the error) or revision is not used in the technical standard. However, the parties who reach an agreement on the standard can use the latest version of these documents. All the following documents are used. The version is used for this standard. GB/8000·223 Quality Management System Information VIM.1SS3 International General Standards (RIPM.F1HC, SOILPAC, ILFAPMI.3 Terms and Definitions
This standard (15150232000) uses V[M1993 and the following definitions: 3.1
Measurement management system meisuremenlmangementsystem necessary to complete metrological confirmation and continuously control the measurement process · necessary or interacting with each other 3.2
measurement management system
the necessary measurement equipment to complete the measurement process, the standard measurement, the standard sample (reference material) or the combination thereof 3.4
metrological characteristics characieristie maintenance can affect the measurement results. 2. Measurement maintenance must always be in a metrological planning
planning 2: measurement maintenance for the production plan,
planning company to confirm mrirulugituFcunfirmalion to ensure that the measuring equipment for the expected period of use of the book production method::! Measurement confirmation from the package precision, calibration and room certification, all necessary adjustments or maintenance of the subsequent production, equipment service period except the use of the planning company information requirements compared with CB/T 19022-2003/1S ( :0012:20C3 and requirements.
2: There is a heart of equipment to use to confirm the use of the period to request the township delivery point to confirm the realization of each section. LAN: Purchase limit credit system request package discount: H points also thank you! Xu error learning, etc., :: : The product should be determined in the design
: You 2 discuss the price let by nature.
Xu functional helrolngicalfumrtion
The organization is responsible for the end of the real standard measurement of the most standard management attention to the implementation of the teaching to the technology. 4 The total beauty request
The management system point ensures that the specified measurement change request
The specification is the opening of the quantity and safety request from the product requirements, the single design management this registration product must be happy, Aijie shows the ratio of the whole, no allowance is not determined, the price of bacteria is selected, the price is determined, the decomposition of the goods into the building. The technical organization should define the measurement equipment and the requirements of the measurement environment, determine the use and content of the measurement system, and the risks and consequences of ineffectiveness. The measurement system 1 is not designed and controlled by the group, and the measurement equipment is confirmed: see Figure 2 and the necessary technical requirements. The measurement management system must be strengthened and all measurement equipment must be confirmed within the measurement management system. See 7.1: The measurement management system must be organized and controlled. 5.1 The measurement management system must define the measurement functions. The top management of the organization should ensure that the necessary resources are accumulated to develop and maintain the measurement functions, and that the management functions cannot be driven by individual departments or departments at the next level. The measurement of the damage should be established by the management, and the measurement should be reasonable, and the form of the document should be improved to ensure the effectiveness of the transmission and clean system. 5.2 Customer focus
The manager of the measurement function shall ensure:
: Adhere to the requirements of the system: Bi measurement and management of the system is the system of measurement and management of the system requirements:) can prove the compliance with the established requirements of the customer: 5.3 Quality control
The management of the system can measure the quality of the system to the standard. It should define the objective criteria and sequence of its control.
The idea of ​​a clean and not polluted store, this quality standard has - there will be no wind incorrect price change original recent collection of the product station or the effectiveness of the product will be: the effectiveness of the quality type of care found not exceeding the management of the "big: an alliance to start your time research into a business with a certificate of confirmation, the safety of the teaching completion of the brand and other technical film I bring the management film: the effectiveness of the stock service will stop the sand to the new production of the self-division 5.4 management evaluation application
CEB/T19022—2002/1NI)10J12:2003 planning organization The system should be systematically evaluated and measured to ensure that the system is adequate, effective and appropriate for continued operation. The system should also ensure that the necessary resources are measured and the results of the environmental review are sufficient for the operation of the system. The system should also ensure that the necessary resources are measured and the system is adequate for ongoing operation. The system should also ensure that the necessary resources are measured and the results of the environmental review are sufficient for the operation of the system. Responsibilities
The person in charge of the measurement system shall realize the voice of all personnel and form a document
through the use of the actual purchase of the heart and the operation of the guide book or to determine. This standard cannot be used outside the measurement functional department: 6.1.2 Capabilities and training
The person in charge of the measurement function shall have the ability to demonstrate his willingness to perform the assigned tasks and develop the required specialized capabilities: Ensure that training is provided to meet identified needs, maintain records of training activities, and evaluate the effectiveness of training. Responsible persons should also be aware of the impact of their activities on the effectiveness of the system and product quality: this can be demonstrated through the use of data, time and test results, and demonstrated through the use of performance indicators. When employees are involved in training, adequate and appropriate supervision should be provided. 6.2 Information Resources
6. 2.1 The procedures should be documented in detail and updated to ensure that they are implemented quickly and efficiently. New procedures or changes to existing procedures should be approved and updated. The procedures should be effective and efficient, and should be documented in a timely and consistent manner to ensure that the quality of the product is achieved. 6.2, 2 Software
Specific requirements and calculations for new software are documented, identified and approved to ensure continued suitability for use, any modifications are tested and/or confirmed before use, and approved and documented, testing must be performed to ensure the results are valid.
Products may have several forms of integration (within the scope of delivery, the software may be based on the finished product or the finished product). The test points may include potential, pathological production , the market algorithm treatment process is connected, the components of the travel plan must be delivered step by step, the control of the world's expenses must be maintained, the copy of the registration must be complete and there must be, the process of production, etc., the sequence of the parts, etc., the sound of your operation treatment, the most important part of your protection process, to ensure the quality of the long-term good records of the kidney management system, there should be a copy of the file and the sequence to ensure the record! Busy storage, protection, storage period, stock disposal, such as confirmation of diamond color thank you policy, long-term. Dare to work, no problem, customer, continent, information or other blood maintenance process of your collection.
5.2.4 Labels
The various measurement processes in the measurement management system should be clearly identified. They can be individually labeled in the specification. The equipment used in the measurement system should be clearly identified to confirm that the equipment is under control and authorized to use. The equipment used in the measurement system should be distinguished from other equipment. 6.3 Material resources
6.3.1 Measuring equipment
All measuring equipment in the measurement management system should be provided with their labels to meet the specified metrological safety requirements. The measuring equipment should always be in a valid and standard state before it is used. The measuring equipment should be used in a controlled or known environment to ensure that it is effective. How should the measurement equipment be corrected within the measurement system? The measurement requirements of the large and small measurement equipment can be recognized by you through inventory, and the original small process is confirmed in the purchase process. The maximum allowable error of the measurement equipment can be fully specified, certified and confirmed by the market reference requirements or the regulations of the manufacturer of the measurement equipment. Massive equipment calibration and elimination of errors may result in the production of quality assurance agents outside of the metrological function. The management of scientific and technological products should establish, maintain and promote the use of documented procedures to receive, handle, and transport measuring equipment, so as to identify misuse, damage and changes in the true metrological property. The measuring equipment in the measurement acceptance system should have a processing procedure. 6.3.2 Environment
To ensure the effective operation of the system, the environmental conditions required for the effective operation of the system must be recorded and documented. The image of the system is formed by recording and using the work to thank the quality of the components, the quality of the surface source of the inductor, the condition of the black bad point, the humidity, the pain, the condensation, the shearing, the customary method, the half-capacity, the sand treatment, the inductance research, the real his responsibilities: the equipment is prepared before the quality of each point, usually the equipment specification gives the maximum quality of the measurement range, the opening of the pond, the distance and resistance of the components, etc. 6.4 The external supplier before the management of the joint partner makes the system propose the following requirements to prevent the formation of a document, and the external supply end is the document that stipulates the requirements of the non-power to negotiate and select it. The quality regulations are selected, and the obstacles to the supervision and evaluation are formed into documents, annual heart records and evaluation stations. The records of the external product or service providers should be kept, and the foreign suppliers should provide the products and services for the purpose of verification and certification. The foreign suppliers should provide the products and services for the purpose of verification or certification. 7. Metrological confirmation 7.1.1 General provisions G1/1 790223/1510012:2003
should be equipped with a real rate metrology pass this with Figure 2 and record) to ensure that the measurement equipment service metrology characteristics meet the measurement requirements of the measurement certificate. The non-single-name recognition has been passed. The measurement equipment is finally verified. Li Nan
The new car is in the teaching I feel, the city institute, in order to promote your academic progress and reduce the measurement requirements) to read the measurement equipment materials and provide the measurement equipment for the selected measurement equipment to obtain a measurement seat equipment measurement connection recognition status information examination loan interest, there are also restrictions and quick and comfortable enjoyment requirements, the measurement equipment has no book characteristics suitable for its focus version of the promise, the index
thank you for the wide color implementation of the equipment service:
measurement country.
Five safety
secret determination section:
Fen salary method:
Shenlan:
Effective batch modification of the product's internal information to determine the quantity of the determined quantity through direct comparison with the actual expected quantity requirements to confirm the expected quantity
Dragon should avoid the qualitative and characteristic requirements of the sliding equipment 7,1. 2 The design risk is happy to recognize the weak time
Ding determines or receives the change of the design after the two methods of accounting for the description of the clothing: measurement confirmation read the development of the virtual market, it is necessary to reverse the account adjustment in time to confirm the compliance with the requirements of the plan. help south || tt || benefit with previously confirmed receipt of dynamic data new prediction light into the East knowledge research technology micro determination or micro recognition question, reward determination is the capital you in the confirmation still pass, the use of the invitation needs to pass the system piece control generation of the record to always have the hanging of the inspection flow high travel can be calculated or the lake system to see the heat then 0) each time for the warehouse format of the test mouse talk about the model slow, adjust the format or can receive, the bed city design guide welcome recognition time trap 7.1.3 set temporary adjustment control || tt || a system test of the system ...2003 Guidelines
and should not be applicable to the external objects of the user's installation, this most frost road user or stock production license should be the state of the collection of technical protection should be improved step by step special social point in the public design I am the same sequence, through the necessary understanding and, such as you through, I material, complex season through the Chinese propaganda remote with enough to give staff job fat extension, the design of the most functional in the long run 9 procedures should be with the shadow of the broken file. No effective test equipment needs to be sealed. 7.1.2 Metrology confirmation process records
appropriate daily benefit confirmation of the main record should be noted during the period of time by the authorized person to verify the validity of the product and can be obtained from the record,
active record of the most provisions of the protection in the still heard the law color use request, suitable for learning reform fee request legal fee request standard still create outstanding responsibility: the storage of the beauty idea of ​​the actual standard tour range may need to be kept confidential. Metrological confirmation is a process of scientifically verifying that each equipment meets the metrological requirements of the regulations. The following points should be taken into consideration during the operation: a) The manufacturer's identification and identification of the equipment, model, serial number, etc.; h) The results of the metrological confirmation; i) The identification of the metrological confirmation sequence (Section 6.3.1); the maximum allowable error specified in the relevant environmental conditions; i) The uncertainty of the equipment calibration; j) The detailed information of the calibration personnel, such as training, modification, etc., used Restrictions:
The person who executes the verification is responsible for identification:
The person who is responsible for the correctness of the overall specification is identified: t)
The only thing that can be done with the valid certificate and other documents (such as scanning and proofreading) is the evidence of the maintenance and testing:
Annual fee for expected use:
Two complete inspections and requirements for the results, quick delivery of the repair results, and the results you get before the repair are subject to the huge number of limitations, and can the mutual quality of the station be restored under the conditions of technical quality
In this situation at the table? ,The certificate or report contains the appropriateness of the test, which can be used to replace the specified requirements (not specified in the cold reduction), and the product can be printed or compiled in full format. The metering station shall have authorized personnel to modify the user card and model insurance records, and shall formulate a reliable measurement plan, confirm, implement, document and control it as a component of the measurement management system. 3. Identify the measured images, GR/T19022-2003/1NO:0012:20J3 Each measurement shall be completed with all relevant equipment identification, test procedures, test software, operating conditions, other factors that may affect the measurement results. The process of establishing a space system should be completed according to the actual needs of the environment. 7.2.2 The design process should be based on the customer's, the customer's and the customer's requirements. The measurement process designed to meet this requirement should be documented and validated, where necessary, to ensure that the measurement process meets the requirements and controls, factors and control limits, and the risks associated with not meeting the requirements. This includes the operator, equipment, environment, and the impact of the method on the initial use. You must: Ensure product quality, ensure that the process is effective, that the process is designed to meet the requirements, and that the measurement process is effective. When errors occur, the measurement results can be verified by analogy with other measurement methods or through the process design, and ensure that the problems can be solved in a timely manner.
In the process of quality control, the quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. The quality of the product will be improved or the quality of the system will not be increased. Determine the performance requirements of the internal process for the purpose of use. For example, the process includes:
Read the quality and do not determine the performance:
Follow the light:
Point effect:
Ranger:
Other special processes:
GB/1:19022-2CC3/ISO10312:20037.2.3 Implementation of special processes
The planned process should be carried out under the designed controlled conditions to meet the requirements. The controlled conditions should include:
! B: effective measurement; use the required environmental conditions to obtain the required sales materials; use the personnel with the required equipment; report the results in the appropriate form: monitor according to the regulations. Records of the measurement process: record the records of the machine side integration requirements, including 1! The actual measurement of the original light will be transported: the station can be used for all the required sound! Adjustment such as the difference between the current quantity setting or verification of the standard and the village data:
) from other quantity process control data, including relevant quantity uncertainty information: the measurement results of the reduction of the effect of the measure; c
) the date of the annual planned quantity control activity: the identification of the relevant verification partner:
the identification of the person responsible for providing peace of mind:
) the person is able to (only the required and actual reduction). Ruinan www.bzxz.net
remembers the spirit oil, for the consumable items in the disk, the record requirement is enough. The design or accounting should ensure that only authorized people can make changes, make mistakes and take risks. ,3 Distinguish uncertainty and source
7.3.1 Measurement uncertainty
Each measurement system shall be evaluated through the evaluation of measurement uncertainty (see 5.1). The uncertainty that does not need to be determined shall be recorded or eliminated. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. The measurement uncertainty distribution of the measurement equipment and the measurement process must be completed before the validity is completed. This is the decision table for the research. In all these cases, the uncertainty of the use of the quantity and the effect of the energy on the product's performance is the best. The fourth study is to determine the effectiveness of the product: the uncertainty of the operation of the single design is the only way to achieve the desired effect. The selected small design should be carefully controlled and the small design should be carefully controlled. The total effect of the product should be evaluated by statistical techniques based on the results of the calibration and verification of the results. 7. 3. 2 Traceability The metrological function should ensure that all measurement results can be traced back to the source unit. 6
GD/T *9022—2CC3/[50 130'2:2003 The reference to SI units shall be realized through scientific standards or natural constants. The relationship between the units of natural constants and S1 units is oral and is recognized by the international community. The reference to SI units is only used for small units or natural constants. The reference to SI units is only used for small units or natural constants. The reference to SI units is only used for small units or natural constants. The reference to SI units is only used for small units or natural constants. The reference to SI units is only used for small units or natural constants. The reference to SI units is only used for small units or natural constants. The existing status of the research flow. The measurement results can still be sent to the country to study the tax source of the excess quantity. The source of the standard test results should be recorded with the report of the product (what is the standard material? The standard material can be recorded every year. The key points of the quality increase should be recorded. The original customer should be within the legal and regulatory requirements. The management system should analyze and improve the system from day to day.
8.1 General
Design information and implement the new measurement system to meet the needs of the measurement system, and make progress in order to: ensure that the measurement system is in line with the basic standards: maintain the improvement of the measurement system.
8.2 Audit and monitoring
8.2.1 Overall plan
: job fluent in the audit, monitor other applicable exchanges to determine the suitability and effectiveness of the measurement management system: 5. 2. 2. Customer status
a job to continue to meet the needs of customers in the test to meet the overall information, should be required to grasp the flood of information
9,2.3 Most of the management system audit
should be carefully planned and conducted to ensure that the measurement management system is effectively implemented and meets the requirements, the audit of the system will be affected by the overall impact. You should record the results of the system and the history of the collection, to ensure that the lack of funds to be taken to eliminate the lack of enterprise training and the original
measurement management system to the market to the point of the audit branch. 0! The first research and development of your ticket can be statistically verified, and the second party personnel will be responsible for the cost of the goods.
8.2.4 The monitoring of the management system is required
In the process of the whole test and management system, the monitoring is carried out according to the process and the correct time interval of the release of cattle.
The monitoring type is determined by the method used to determine the best technology and their use. By ensuring that the test can be obtained in time, the test product system should be able to prevent the risk of changes and adverse flows caused by the requirements of the requirements, eliminate the risk of sweeping the distribution flux and confirming the monitoring results and adopting the correct situation of the plan or document to prove the requirements of the plan:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.