Petroleum and Natural Gas Industry Standard of the People's Republic of China General Principles for Quality Inspection and Evaluation of Petroleum Construction Engineering
Standard for Quality Inspection and Evaluation of Petroleum Construction EngineeringGeneral Principles
SY4024—93
Editor: China National Petroleum Corporation Capital Construction Engineering BureauApproving department: China National Petroleum CorporationImplementation date: March 1994
Petroleum Industry Press
1993·Beijing
Classification of quality inspection and evaluation projects
Classification principles
2.2 Classification of projects
3 Grades of quality inspection and evaluation
3 .1 General provisions
Quality grade of sub-project
Quality grade of section project
Quality grade of unit project
Quality grade of unqualified sub-project after rework and redoing Procedures and organization of quality inspection and assessment
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Appendix!
Unit engineering division table
Scores of each quality file of basic project sub-itemsSub-project quality inspection and evaluation table (for engineering)Sub-project quality inspection and evaluation table (for prefabricated products)Sub-project quality evaluation table:
Sub-project quality grade summary table
Quality assurance data verification table·
Unit engineering quality comprehensive evaluation table
Terms used in this standard
Additional explanation·
(15)
Document of China National Petroleum Corporation
(93) Zhongyoujizi No. 598
Notice on the approval and release of "Regulations for the Preparation of Petroleum Surface Engineering Design Documents" and other 27 petroleum and natural gas industry standards
All relevant units, relevant petroleum professional standardization technical committees! The draft of 27 standards including "Regulations for the Preparation of Petroleum Surface Engineering Design Documents" has been reviewed and approved and is now approved as petroleum and natural gas industry standards. The numbers and names of each standard are as follows,
15Y 0009--93
2 SY0055--93
SY 0072—93
SY 0073--93
SY 0074—93
SY/T 0076—93
SY/T 0077—93
SY/T 0523-93bzxz.net
SY 4024—93
10SY4025--93
Petroleum surface engineering design document reduction specification (replaces SY9—83)
Long distance gas transmission and extraction pipeline base measurement specification
(replaces SYJ55—-83)
High temperature cathodic peeling test method for pipeline anticorrosion coating Standard test method for pipeline anticorrosion coating patch material Standard test method for insulation and sealing of pipeline anticorrosion coating patch
Natural gas degassing design specification
Natural gas condensate recovery design specification
Oilfield water treatment filter·
:. General rules for quality inspection and assessment of petroleum construction projects (replaces SYJn4024—88)
Petroleum construction project quality inspection and assessment standard Construction engineering (replaces 5YJm4025—88)
11 SY 4026--93
12 SY 4027—93
13 SY 4028—93
14 SY4029-93
4030.1—93
16 SY 4030.2—93
17 SY 4031--93
18SY4033--93
19SY4034--93
20 SY403593
21 SY 4037--93
22 SY 403893
23 SY 4053--93
Petroleum construction project quality inspection and assessment standard Ya storage tank engineering (replace SYJn4026--88)
Petroleum construction project quality inspection and assessment standard Station steel process road installation engineering (replace SYJⅡ4027--88)
Petroleum construction project quality inspection and assessment standard Equipment installation engineering replace SYJn4028--88)
Shidu construction project quality inspection and assessment standard
Pipeline line engineering (replace SYJm4029--88) Petroleum construction project quality inspection and assessment standard Electrical
Engineering (overhead power line engineering)
(replace SYJn4030--88)
Petroleum construction project quality inspection and assessment standard Electrical engineering (electrical installation worker) (replace SYJⅡ4030--88)
Petroleum construction engineering Quality inspection and assessment standards Baodong instrument installation project (replace SYJn4031-88)
Quality inspection and assessment standards for petroleum construction projects Road
Engineering (replace SYJ4033--88)
Quality inspection and assessment standards for petroleum construction projects Bridge engineering (replace SYJn4034-88)
Quality inspection and assessment standards for petroleum construction projects Heating, ventilation, water supply and drainage installation engineering
(replace SYJn403588)
Quality inspection and assessment standards for petroleum construction projects Refinery construction project (replace SYJ4037-89) Quality inspection and assessment standards for petroleum construction projects Gas field
Construction project (replace SY4038--92)
Quality inspection and assessment standards for petroleum construction projects Oilfield
24SY/T4068-93
25 SY/T 4069--93
26 SY 4070--93
27 SY/T 4071--93
Gathering and transportation pipeline engineering (replacing SY4053--92) Quality inspection and assessment standard for petroleum construction projects Production of anticorrosion and heat-insulated steel pipes
Quality inspection and assessment standard for petroleum construction projects Production of steel containers
Construction and acceptance specifications for petroleum and natural gas pipeline crossing projects
Pipeline downward welding process specifications
The above standards shall be implemented on March 1, 1994. China National Petroleum Corporation
September 9, 1993
1.0.1 This standard is formulated to unify the quality inspection and assessment methods for oil storage construction projects, strengthen quality management, and ensure project quality.
1.0.2 This standard applies to the inspection and assessment of the quality of petroleum construction projects. 1.0.3 This standard is compiled based on the relevant construction and acceptance specifications and technical standards of the state, petroleum and natural gas industry and related industries. 1.0.4 This standard should be used in conjunction with the following quality inspection and assessment standards: SY4025-93
SY 4026-93
SY 402793
《Petroleum Construction Project Quality Inspection and Assessment Standard Construction Engineering》《Petroleum Construction Project Quality Inspection and Assessment Standard Petroleum Construction Project Quality Inspection and Assessment Standard Quality Process Pipeline Installation Engineering》
SY 4028-93
Installation Engineering》
SY 4029--93
Road Line Engineering》
《Petroleum Construction Project Quality Inspection and Assessment Standard Petroleum Construction Project Quality Inspection and Assessment Standard SY 4030.1~-4030.2-93
Electrical Engineering》
SY 4031—93
Instrument Installation Engineering
Storage Tank Worker
Station C Steel
Equipment Installation
Long-distance Pipeline
《Petroleum Construction Engineering Quality Inspection and Assessment Standard》《Petroleum Construction Engineering Quality Inspection and Assessment Standard Automation
SY 4032.1-~4032.10--33
Standard Communication Engineering》!
SY 403393
SY 403493
"Petroleum Construction Project Quality Inspection and Assessment Standard" "Petroleum Construction Project Quality Inspection and Assessment Standard Road Engineering
Bridge Engineering
SY4035-93"Petroleum Construction Project Quality Inspection and Assessment Standard Heating, Ventilation, Water Supply and Drainage Installation Engineering"
SY 4037-93
Construction Engineering"
SY 4038—93
Equipment Engineering"
SY 4053—93
Pipeline Engineering"
SY4068—93
High-temperature Steel Pipe Production",
SY 4069—93
Container Production".
《Petroleum Construction Project Quality Inspection and Assessment Standards》 Refinery《Petroleum Construction Project Quality Inspection and Assessment Standards》 Gas Field Construction
《Petroleum Construction Project Quality Inspection and Assessment Standards》 Oil Field Collection《Petroleum Construction Project Quality Inspection and Assessment Standards》 Anti-corrosion and Insulation
《Petroleum Construction Project Quality Inspection and Assessment Standards》 Oil Field Saw 1.0.5 The anti-corrosion and thermal insulation steel pipes, prefabricated concrete components and steel containers produced by the petroleum industry shall be subject to quality inspection and assessment before leaving the factory, and quality certificates and sub-project quality inspection and assessment materials shall be provided as a guarantee for the quality assessment of the sub-projects in which they are located in the project.
1.0.6 For projects not yet included in this standard, the construction unit and the construction unit shall negotiate and formulate or adopt the appropriate quality inspection and assessment standards as the basis for quality inspection and assessment, and report to the competent department for filing.
2 Division of projects for quality inspection and evaluation
2.1 Division
2.1.1 Petroleum construction projects should be divided into sub-items, sub-sections and unit projects for quality inspection and evaluation.
2.1.2 Sub-items should be divided according to major types of work, processes, equipment sets, pipeline categories, etc.
2.1.3 Sub-section projects should be divided according to project types (or specialties), structural parts, pipeline sections, line sections, process systems, etc. 2.1.4 Unit projects should be divided according to industrial plants, workshops or design sections, process systems, and each type of project (specialty) together constitutes a unit project. When a type of project (or specialty) has independent construction conditions or independent use functions, it can also constitute a unit project alone.
2.2 Division of projects
2.2.1 The division of sub-items and sub-section projects should comply with the provisions of Table 2.2.1. 2.2.2 The name of the sub-project shall comply with the provisions of Table 2.22. 2.2.3 The division of unit projects may refer to Appendix A of this standard. Sequence
Type of project
(or specialty)
1丨Construction project
Storage tank project
Steel in-station
Process pipeline
Installation project
Equipment installation
5: Long-distance pipeline
Line project
6! Electrical engineering
Communication engineering
81Road engineering
Division of sub-items and sub-projects
Sub-projects
Generally divided by main types of work
Generally divided by process
Generally divided by process or pipeline type
Large equipment for disassembly and installation
Generally divided by connection process
Equipment installed as a whole
Divided by equipment sets
Generally divided by connection process
Overhead distribution lines, overhead
transmission line projects are divided by
processes
Electrical installation engineering-generally divided by electrical equipment groups in industrial plants and regions and the electrical lines between them. |Generally divided according to the types of work in each profession, generally divided according to the construction method, materials, and process. Sub-projects. The main parts of the connected buildings. 1000-10000m* (excluding 10000m vertical storage tanks). Each unit is a sub-project. The process pipeline installation projects in the same unit project together constitute a sub-project. Each equipment is a sub-project (or unit) project. The equipment installation projects in the same unit project together constitute a sub-project. Every 15km line and each medium-sized crossing and spanning project are each a sub-project. ||Power transmission and distribution lines for independent construction are divided into sections: All electrical engineering in the same unit project is a sub-project
Additional divisions by section, location or construction system
Divided by structural parts
2.2.1
Buildings with a construction area of less than 80m
can be divided into one Each vertical storage tank with a capacity of less than 1000m2 can be a sub-project. Type of project (or profession) Bridge engineering Automation instrument Installation worker Heating, ventilation, water supply and drainage Installation worker Oilfield gathering and transportation pipeline engineering, pre-production, sub-projects, generally divided according to construction methods and work procedures. Generally divided according to the type and purpose of the instrument, connecting pipelines, and an independent detection system, adjustment system, and interlocking system formed by the line. Generally divided according to the purpose of the pipeline, the transportation of different media, air pipe materials, and equipment groups. Divisional projects. The connection mold parts. The automated instrument installation projects in the same unit process together form a divisional project. Divided by engineering specialty. Generally divided according to the type of work, work! Connection process system, engineering sequence, equipment sets, pipelines!
Category division
General connection process division
Sections are divided according to structure and structural performance
Gas field construction refers to the classification of various installation projects, equipment classification
Control medium or section classification
Refer to the classification of various projects
Continued Qiu 2.2.1
Small field, station, storage production and heating. Ventilation installation project
Small-scale field, station, and reservoir drainage installation project can be divided into a sub-project
Pipeline from wellhead to metering station with medium pressure not exceeding 2.5MPa can be divided into a sub-project
Only sub-projects
Project name
Construction engineering
Storage engineering
3In-station steel process pipeline installation
4!Liquid preparation installation project
5Long-distance pipeline line project
Sub-project name
Sub-project name
Building area less than e0 m of construction, earthwork, lime soil foundation, sand and gravel foundation, asphalt sand cushion, common piling, palace bricks, stone masonry, formwork, steel bars, concrete, component installation, assembly type large plate structure and light plate structure installation, steel structure production, steel structure welding, steel structure bolt connection, steel structure installation, steel structure painting, wooden door balance production, wooden door and window installation, steel door and window installation, general plastering, decorative plastering, grouting, paint, glass installation, grouting (spraying), decorative panel (transfer), surface leveling layer, roof insulation (insulation) layer, layer roll waterproofing, oil-free joint coating roof, downspout, integral floor, floor, plate floor, floor, waterproof concrete structure, water mortar waterproof layer, underground roll waterproof layer, boiler construction. Brick smoke window.Steel bacon production and installation, tank area fire dike and other spherical storage tank assembly, spherical storage tank welding, 1000m* below vertical storage tank assembly, welding, coating and insulation, vertical storage tank production, 1000m (including 1000m) ~ 10000m vertical storage tank line welding 10000m + including 10000m) above vertical tank bottom assembly welding, 10000m (including 10000m) above vertical tank wall assembly welding, 10000m (including 10000m) above vertical tank m (including 10000m*) and above vertical storage tank top assembly and welding, vertical storage tank accessories installation, gas moment production, gas resistance assembly connection ladder, platform, railing production and installation, coating, insulation, etc. Pipe trench excavation and backfilling, pipe fittings, Minting inspection and pipe fittings processing, pipeline assembly, pipeline welding, pipeline installation, pipeline painting, soft product insulation, perlite or vermiculite prefabricated block insulation, petroleum asphalt anti-separation steel pipe on-site production, pipeline anti-corrosion insulation patching, etc. Fan installation, live Installation of plug gas compressor, installation of pumping unit, installation of pump, installation of water injection pump, installation of long-distance pipeline Yulin oil pump group, installation of steel round container, installation of crude oil electric dehydrator, installation of atmospheric pressure container, equipment insulation, installation of integral boiler and accessories, installation of heating furnace, installation of special wet steam generator for oil, production and installation of ladder, platform, railing, painting, etc., trench excavation, pipeline assembly, pipeline welding, pipeline anti-corrosion and insulation patching, cutting of polyethylene adhesive tape anti-corrosion layer for buried steel pipeline, backfilling of pipeline trench, pipeline crossing highway, railway, stream, serial number
project name
long-distance pipeline line project
electrical device installation project
overhead power line project
long-distance road Xinming line line engineering,
city telephone line project
communication pipeline project
carrier installation project
sub-project name||tt| |Continued Table 2.2.2
Pipeline crossing small rivers, resistance cathode protection, impressed current cathode protection, pipeline pressure test and ball sweeping, etc. Cable lines, pipe wiring, sliding connection installation, busbar installation, power transformer installation, panel and cabinet installation, low-voltage electrical installation, circuit breaker installation, disconnector, load switch and high-voltage fuse installation, reactor installation, lightning arrester installation, capacitor installation, mutual inductor installation, battery cable installation, open-type and lighting distribution box and panel installation: electrical inspection and wiring of motors, secondary circuit wiring, grounding device and lightning rod (belt, net) installation, etc. Stonework, on-site cast foundation, prefabricated rock foundation, pole tower: wire installation, conductor erection, accessory installation, electrical equipment installation, household line installation, grounding, etc. Pole, pole root fixing and lightning arrester, pole nail installation, wire and support pole installation, wire support and line support, line erection, open line branch loss and protection Installation of equipment. Cable installation for incoming (or intervening) office, cable splicing installation for incoming (or intervening) office, gas-lock installation for incoming (or intervening) office, DC electrical characteristic test, AC electrical characteristic test, ground resistance test, etc. Assembly of electric brackets and pole connection works, reinforcement of poles and pole roots, guy wires and braces, overhead open wires, overhead cables, underground cable laying, wall and concealed pipe cable installation, branch lines, assembly and installation of handover equipment, cable splicing, installation of amplification and multiplexing equipment, installation of terminated cables within the office, installation of inflatable devices, cable corrosion protection, vacuum electrical test, AC electrical test, etc.
Foundation and foundation, pipeline laying, wall construction, covering, trench cover and opening installation, earthwork, etc.
Rack installation, cable walkway installation, cable trough installation, rack installation, signal and lighting equipment installation, government cable binding, jumper laying, welding, feeder installation, miscellaneous inspection and debugging, local testing, full-process testing, etc.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.