title>LS/T 1205-2002 Grain Dryer Operating Procedures - LS/T 1205-2002 - Chinese standardNet - bzxz.net
Home > LS > LS/T 1205-2002 Grain Dryer Operating Procedures
LS/T 1205-2002 Grain Dryer Operating Procedures

Basic Information

Standard ID: LS/T 1205-2002

Standard Name: Grain Dryer Operating Procedures

Chinese Name: 粮食烘干机操作规程

Standard category:Grain Industry Standard (LS)

state:in force

Date of Release2002-10-14

Date of Implementation:2002-11-01

standard classification number

Standard Classification Number:Agriculture and Forestry>>Food and Feed Crops>>B20 Food and Feed Crops Comprehensive

associated standards

Publication information

publishing house:China Standards Press

other information

Drafting unit:State Grain Administration

Focal point unit:State Grain Administration

Publishing department:State Grain Administration

Introduction to standards:

This standard specifies the terms and definitions, process organization, preparation before start-up, equipment operation, quality requirements of grain after drying, maintenance and overhaul, management system, etc. for grain dryers and auxiliary systems. This standard applies to grain dryer systems, including dryers, hot air furnaces, cold air blowers, auxiliary lifting, conveying, cleaning equipment and electrical control equipment. LS/T 1205-2002 Grain Dryer Operating Procedure LS/T1205-2002 Standard download decompression password: www.bzxz.net

Some standard content:

Preparation number: 1C990--2002
Grain industry standard of the People's Republic of China
LS/T 1205—2002
Operating rules for grain dryer
Operating rules for grain dryer2602-10-14 Issued
Issued by the State Administration of Grain
2002-11-01 Implementation
2 Normative references
5 Terms and definitions
Technical organization of drying system
4.-System composition...
1.3 Main technical parameters of the equipment
Preparation before the three-in-one machine
5.1 Cost requirements
Dryer commissioning
Operation of the machine
6.2 General||tt ||The operation of hot air drying
Basic medical requirements
Inspection before drying
Precautions for operation
Maintenance and maintenance
Operation of related equipment
Bucket elevator...
Belt conveyor...
Weighing vibrating screen
Dust removal system
Electrical heating system
Safety precautions...
Quality requirements of grain after drying
Maintenance and maintenance
1S-T *205--262
1.5 1 12C5--2002
13 Lan management system
Feigangjiang system
13, the special management system
12.3 Personnel will
. Production record
["120-2302
This standard is based on G5/1.1-23003 Standardization work guidelines Unit 1: The origin and expression of standards industry Part 1: Standard The basic provisions of the standard are GB/T157111S96 continuous food drying machine, GB/T6672 hot air furnace, etc. This standard is for the technical specifications of food drying system, including the operation methods of the equipment, safety precautions, food quality requirements, maintenance and inspection, as well as waste treatment. This standard is drafted by: The main units of this standard are: Zhongbei Reserve Protection Management Company of Xiaogu Group, Liaoning Provincial Food Science and Technology Research Institute, and National Agricultural Bureau Science Research Institute.
The main authors of the standard are: Lu Yanjiao, Yao Zheng, Dui Xinchun, Niu Xinghe, Cui Huihua, Zhao Guoli, Luo Xixu, and Xia Liqiao. This standard is the first release of the grain drying machine operation standard 1 Scope
Grain dryer operation procedures
1.s:r2U52002
This standard stipulates the technical specifications and definitions of grain dryers and auxiliary systems, process preparation, additional equipment before starting, equipment operation, quality requirements for post-production, maintenance and inspection, and management. The standard applies to the following grain drying systems, including dryer hot air ratio, hot air blower, cold air blower, auxiliary room supply, transportation, handling equipment and electrical control equipment.
2 Normative references
The clauses in the following documents become clauses of this standard through reference. For any referenced document without a date, its subsequent new amendment (excluding errors) shall not be applicable to this standard. Before that, the parties who have reached an agreement on the standard shall study whether the latest versions of these documents can be used: For any referenced document without a date, its latest version shall apply to this standard. n4S1 Grain and oil inspection sampling and sub-sampling B/T5492 Food inspection. Oil broken tank color, odor, taste identification CB/T544
Food, Shantou inspection impurities, incomplete grain inspection GR/T549e
Oil grain whole yellow whole rice and packaging control inspection GR/T 54$7
GB/T 54S8
CB/T 657C
GB/T 890D
GB13271
Determination of moisture content in grain and oil
Determination of moisture content in grain and oil
Testing method for grain drying machine
Terminology of equipment for grain storage
Standard for emission of atmospheric pollutants from boilers
GB/16714 Continuous grain drying agent
GB1744
Safety regulations for dust prevention in processing and transportation systems JB GG72 Technical conditions for hot blast furnaces
Evaluation specification for wind power
NYT 4f4
Sn/T10082
SB/T1014B
3 Terms and Meanings
Food Bucket Elevator
Grain Belt Conveyor
Oil Adding Machine General Technical Specification
In addition to the terms specified in G, the following definitions shall apply to those not yet defined in this standard. 3.1
Food Dryer
A general term for equipment that uses a simulated method to reduce the moisture content of food. 3.2
heated-air furnace
equipment that provides heat source for the dryer: This standard specifically refers to the fuel hot-air furnace system, including the hot-air furnace main unit, draft fan, induced draft fan, heat exchanger, auxiliary equipment and electrical control equipment, etc. 1
14T12052002
concurrent (countercurrent) dryer conuurrenlTowundcountereurrentdryer Concurrent (countercurrent) dryer 3.4
fast-flow dryer trrns-finwdryer
cross-flow dryer, a dryer in which the grain flow is perpendicular to the fuel flow direction, 3. 5
Mixel-Rin dryer
The medium flows downward in a direction according to the book. The medium passes through the grain layer in the drying machine in a frequency flow, reverse flow and compensation flow mode. 3- 6
Safety moisture content can safely store the moisture content of the grain
Adjusting and lestrunningThe adjustment and trial operation of the new machine before it returns to normal production mode. 3. 6
Maintenancente
Perform necessary maintenance work at each operating interval or when a fault occurs. 3. 5
Check and repair
To ensure that the equipment can run well, the next combustion period and the start of the inspection and repair of the system equipment, 3.10
Drying perioddryingperiad
Also the total time from the start of drying the wet grain to the end of drying. 3.11
Drying mediumdryingnedia
Substances that can save water from food,
Heat Damage caused by bcatedkermel
After the grains are heated, the surface or pressure shows color or damage. 2 Dryer system process organization
4.1 System composition
Grain drying system refers to the fast dryer, hot net furnace, fan, lifting, conveying, cleaning, dustproof, electrical pads and before and after drying.
4.2 System process organization
4.2.1 Drying of grains in the following order: wet and magnetic separation → screening → lifting Dryer→drying front bin→belt conveyor→bucket elevator*dryer+belt conveyor bucket elevator→self-balancing vibrating screen→industrial grape machine→drying back color note, during the process, the energy can be returned to the dryer or directly discharged. 4.2.2 The flow of the following units in the drying process is carried out in the following order: gas exchange:
1S:T:20522
cold air three-heat exchanger-hot air-drying machine-gas discharge t
cold air★combustion→adjustment
2.2.2 drying After that, the dust is dried in the following order: dust collector → dust collector → dust removal → discharge: 2.3 Temporary production technical data
2.3.1 Dryer
4.3.1.1 Output (t/h2): 5.0: 7.0: 12.0: 15.3: 20.\: 25.0.4-2.1.7 Small
Main grain: 5~15 Grain 2--: Small Yuan 3 Luo
4.3.1.3 The moisture content of grain in the machine is different. 4.2.1.4 Conveyor food rate: 2 or more. Among them (m! 4 type: 2c.2%. No large foreign matter is allowed. 4. 3. 1.5:
Machine humidity: light table [
Machine grain temperature
Ring mother pressure
Glass temperature:
4.3.2 Hot air furnace
4.2.2.1 Type: Continuous machine transmission error single protection non.Equipped with upper collector, etc. 4.3.2.2 Heat medium: clean natural gas 4.3.2.3 System thermal efficiency: 2 light:
4.3.2.4 Air flow rate:
Mechanical selection: human operator: ℃,
4.3.2.5 Dust emission will comply with GET13271 and N: 1164 village regulations 4.2. 3 Attached equipment
4.3.3.: Bucket elevator
Environmentally friendly
High-end water-saving and drying system, wet conveyor speed: 2.m/5: dry belt conveyor: capacity 2.0m/: 6?
One-time elevator efficiency rate: .3%: The wheel should be rubber, layer 7: 13mm0.: =33m, the tail wheel is a cumulative cage type, e
2. 3.3. 2 Belt conveyor
) Maximum speed: 3
b) Maximum conveying angle: 11.5°.
2.3.3.3 Balanced vibration and the mouth of the vibration
Lao tube top: about 7;
Human impurity removal rate: 85% (human non-human content rate, 3: small impurity removal collection, 60%: vibration screen: 7U%e
Report vibration screen body low angle; U°-~13° adjustable: in the same drying system, the household vibration screen coarse screen should be 2mm smaller than the primary coarse screen hole. 4. 3. 3. 4 Gate
1. T 1205-2002
Make the door close to the outside of the bone distance: 21.mml: Electric door fully open or close group time: s2. 3. 3. 5 Dust removal system
Evening wind maximum each suction door back volume see Table 2;
Total attached: ~12a
East "excitation pressure: ka*-10ckPa Select low jade vein dust collector. Table 2 Dust removal system suction air volume
Sample dust point
Type to accept the live transport outlet
External type this
Six poles at the machine point seat
Self-actual rapid method wine
4. 3. 3. E
Gas collection system
Comparative use: Standard
Motor source 38.3 Material 59H AC:
Lighting and other power supply: 329V, single, core E AC: abandoned internal environment temperature: 18℃--13[
Motor sand line voltage wave or: soil network:
Blanket fixed state sense · Super temperature reduction and quarantine medicine automatic control:: (: The grain is divided in or the detection accuracy is not less than 9 years) ±3., 5 Preparation before starting
5.1 Basic requirements
5.1-1 Machine manufacturing. Case fee technology GB/T537u. $/T: 6714SB/T148 implementation. 5.1.2 After the dryer system is installed, it should be tested and put into production. 5.1.2 All equipment in the dryer system should be operated normally. 5.1.4 The machine should be adjusted to maintain the specified operating speed of the dryer. 5.1.5 The dryer should be properly cleaned before entering the dryer. 5.1.G During debugging, the hot air temperature should be balanced to the specified level. 5.1.? When the hot air furnace is half stable, the hot air temperature should be: 1UC. 5.2 Accurate supervision
x, product inin
: ~- 35
5.2.] Check that all machine grooves and parts should be installed properly: special moving parts, such as light roots, should be operated normally, and the wind should be correct: the direction of rotation and the type of the machine should be correct. 5.7.2 Thermoelectric reading and pasture are correct,
5.2.3 The normal operation time of the screen should not be less than h. 5.2.4 The processing capacity should be able to ensure the wet equipment required for the drying operation. 5.7.5 The error wolf should be stored in batches according to the moisture content. 5.2.6 The moisture content of the grain after the machine should be 3%
5-2.7 The hot air protection has passed the drying furnace, the adjustment station, 5.2.B The operators of the drying machine must be trained and qualified before they can take up their posts. 5.3 Debugging of dryer
5.3.1 When the dryer or the lower part is loaded with grain, the upper part is loaded with grain to be dried. If there is a smoke gun, all of them can be loaded into the wet gun, and the lower wet 1.$/T 12052002
shuttle is discharged and the high-speed drying should be carried out. When the dryer discharges the dry grain, the drying system should be stopped immediately and the continuous drying should be started. 5.3.2 When the loading height reaches the upper and lower positions, the grain system should be automatically stopped and the grain shaker should be turned on. 5.3.3 Control and adjustment of processing
The frequency converter of the grain discharge mechanism or the single-phase motor should be used to adjust the processing quantity. 5.3.3.1 Rotary grain discharge mechanism, adjust the speed. The higher the speed of the wheel, the faster the grain discharge speed and the larger the processing volume; on the contrary, the smaller the grain discharge speed. 5.3.3.2 Non-plate type grain discharge mechanism. The following two types of settings are adopted: 1) The reciprocating motion rate of the discharge plate is low. The higher the rate, the faster the grain discharge speed and the larger the processing volume; on the contrary, the smaller the grain discharge speed. 2) Adjust the interval between the discharge plate and the grain level. The larger the interval, the faster the grain discharge speed and the larger the processing volume; on the contrary, the smaller the grain discharge speed. 5.3.3.3 The grain discharge mechanism of the plate type is the grain discharge plate: the larger the number of revolutions, the larger the processing volume; on the contrary, the smaller the processing volume. 5.3.4 Determination of moisture content of grain
5.3.4.1 Determination of moisture content of grain
The moisture content of grain shall be determined by the system or before drying. The determination method shall be in accordance with GB/T5-1. 5.3.4.2 Determination of moisture content after supply: a. Rapid moisture content determination; b. Determination by drying method, in accordance with the provisions of GB 5497: The moisture content of the grain entering the dryer shall be determined by the shallow inspection instrument. The method shall be used in production, and the method shall be calibrated twice. 5.3.5 Adjustment of precipitation range: 5.3.6.1 Precipitation is negatively correlated with treatment quantity. When the moisture content of the incoming wet grain is high or the moisture content of the grain leaving the machine exceeds the required moisture content, the method in 5.3. shall be used to reduce the treatment and increase the precipitation degree. 5.3.5.2 Precipitation is positively correlated with hot air humidity. When the moisture content of the incoming wet grain is high or the moisture content of the dry grain leaving the machine exceeds the required moisture content, the hot air temperature shall be increased without affecting the humidity. 5.3.6.3 Ensure that there is enough hot air supply when the hot air is adjusted in time. 5.3-E Control and adjustment of hot air temperature
5.3.6.1 The hot air temperature of the heat exchanger shall not be greater than 3°C. The temperature should be determined according to the total heat required for the drying machine to release water. In addition, the temperature should be determined according to the different types, structures, types of food, final use, source moisture, treatment plate, precipitation range and cooling speed of the drying machine.
5.3.6.2 Negative pressure heat exchanger: Adjust the hot air up and down movement and the start and end of the electric gate to control the cold air distribution. So as to adjust the combustion air density of the drying machine.
5.3.E, 3 positive heat exchanger: The fan can control the total air release rate of the fan to achieve the required heat release of the drying machine. 5.3.E.4 For non-return dryers, the hot air temperature is the best. ! After the flood, the food supply should be limited. The warehouse should be fixed and the silo should be built. In order to reduce the acid in the transportation process, the temperature of the drying machine should be reduced by 20 0 ~ 30 ℃. b) The adjustment of hot air temperature is closely related to the working state of the hot air. The adjustment of hot air temperature should be carried out according to the provisions of the first article. Table 3 Recommended values ​​of hot air temperature of dryer plate
Food type
Grain transportation
Direct flow
Highest temperature of hot air
Unit is Celsius
13D/14% Drying]
1. $12G5--2002
Root slice inflammation
Qiongshu! Table 3 (thread)
Full: Positive freezing
Over: The degree of corn precipitation is not much, the planting name, small old precipitation is not much, Guang 2: Need (: 2 -2 (
Hot zone high island light
5.3.? The adjustment of wind speed is related to the adjustment of air exchange temperature. The air volume is adjusted according to the rules of 5.3.6.2 and 1.3..3.
5 Dryer operation
6.1 Opening rules
6.1.1 Small worry: According to the direction of the machine, the machine is turned on and off in sequence from the front, and the opposite is true for the shutdown. 6.1.2 Item sequence: head and back Elevator → weighing machine or currency → return machine → a row of single conveyor → selection mechanism → garbage → drying warehouse gate a fine screen, the drying car is equipped with a separate system before the grain is dried, and the automatic vibration case and the product conveyor and belt elevator and other equipment are temporarily not activated. 6.1.4 When the machine feeds grain, start the hot air fan to fine-tune the wind or the electric door to quickly adjust the wind temperature to a fixed value: the structure is preheated and dried 2) imi-- ra.n. After that, the next person enters the ring or continuous operation, 6.1.5 The dust removal equipment is interlocked with the system, and the dust removal equipment is set before starting. The rate is 5im.After the equipment is shut down, the dust removal equipment should be shut down after 0m.
6.2
6.2.1 The processing capacity should be adjusted according to the requirements of 5.3.3. -2.2 The precipitation is about the whole child 5.3., when the dryer is running, the discharge degree should be given priority, and the water discharge will be the main object of adjustment. 6.2.3 The adjustment of the hot 3, furnace should be carried out according to the requirements of 3.5. 6.3 Shutdown
6.3.1 Temporary shutdown
6.3..1 Temporary shutdown generally has the following reasons: Single machine system shutdown sequence:
6) Temporary shutdown:bZxz.net
) Insufficient supply,
6.3.1.2 When a temporary shutdown is caused by a single mode or system failure, the following steps should be followed: a) Close all linkage points of the flashing array, and then close the exhaust gate of the front warehouse of the drying machine to stop the dryer from entering the gear: When the single machine is not called for a long time, it is not necessary to extinguish the hot air furnace. The fan should be turned off, and when the flue gas radiation drops below 353C, there is no need to extinguish the hot air furnace. The grain motor should be turned off and the grain should be stopped:
d) After the machine, the grain should be discharged for 2min-3min every 2h to prevent the upper plate from hardening. 6.3.1.3 When the machine is shut down due to insufficient power supply, the requirements of 6.3. shall be followed. 6.3.1.4 When the machine is shut down due to temporary power outage, various machines cannot be operated. The requirements of 7.4 shall be followed. 6.3.i.5 When the machine is restarted, the following steps shall be taken: 1) The hot air furnace is heated up. When the flue gas density at the heat exchanger outlet does not reach 300℃, the drying machine cannot be operated: b) The hot air blower is started:
When the hot air temperature reaches the requirement, the grain discharging equipment is turned on, and the grain discharging machine is turned on at the same time. The drying machine is operated. e
6.3.2 Long-term machine
1.S/T12062002
When the machine is shut down for a long time or the machine is over 30℃, the machine shall be handled according to the following two methods. 6.3..1 When the machine is in the machine! When the grain temperature in the store is high, turn off the equipment in front of the drying machine from front to back according to the disaster: if the food is gradually discharged, turn off the hot air inlet room 1. Reduce the amount of coal added to the hot air furnace: keep the cooling fan open, until all the food is evenly discharged from the drying machine: learn? First, turn off the grain discharge mechanism of the dryer, turn off the cold air fan: from the back, turn off the conveying and cleaning equipment behind the dryer: F
meaning to close the system:
stop expansion, the temperature is high!
6.2.2.2 When only the collecting tower is left in the machine, a series of methods can also be used: a) Use cannon to extinguish the remaining fire in the furnace:
b) Close the initial point and change the grain feeding;
Drain all the food:
d) Shut down the drying machine and its auxiliary equipment;
) Non-grain treatment
6.3.2.3 When there is only moisture in the machine, use a cannon to extinguish the remaining fire in the furnace:
b) Close the initial point and change the grain feeding;
D) Shut down the drying machine and its auxiliary equipment;
) Non-grain treatment
6.3.2.3 When there is moisture in the machine! The last tower of the hot blast furnace is used to carry grain. After the lights are turned off, the hot air blower is equipped with a damper to use the residual heat in the hot air to dry the grain. After the grain is dried, it is discharged. The operation of the hot blast furnace is completed. 7.1 Basic requirements. The hot blast furnace meets the requirements of IBT6. 7.2 Inspection before baking. The operator should conduct a comprehensive inspection of the hot blast furnace and its auxiliary equipment. The inspection is as follows: The guard plate is in good condition with the sprocket. It rotates smoothly at the staggered wheel shaft. 2. The grate plate is connected to the furnace. If the two sides of the grate are not in order with the furnace body, there will be a phenomenon of disorder. The guard plate is damaged and the silicon is damaged. The damaged parts should be replaced in time! 6. Install the bolts on the left car, and clean up the metal debris such as nails and butt heads; the water gate should be closed with a flexible material, and the lower edge should be parallel to the working surface of the grate; the cover plate should be sealed: settling chamber. heat exchanger: virtual closing pressure or cultivation: the motor shaft should be lubricated with oil (grease): blower. induced draft fan, and the coal blower and outlet fan should be checked to be in normal operation. 7.3 Drying furnace
7.3.1 Before starting the hot air maintenance of the new furnace, carry out the drying under the manufacturer's instructions. 7.3.2 During drying maintenance, use small amount of firewood,
7.3.3 Gradually open and close the blower and induced draft fan, and the resistance of the cavity should not rise suddenly. 7.3.4 The temperature in the drying furnace shall not exceed 30UC measured by the humidity meter on the road after the settling chamber. 7.3.5 When the fan and the air outlet of the sedimentation air are not visible, and there are traces of moisture around the fan, the furnace can be stopped. The furnace drying time should be 5d-7d.
7.4
7.4.1 Sequence: ignite firewood-manual delivery-coal bucket loading-→+coal bunker board cabinet section→grate intermittent coal delivery→machine cover coal. 7
1.512052002
7.4. 2 Appeal
: Adjust the fan door. Air ventilation:
b) Initiate combustion, ten fans:
) Remove the seedlings when I am under the front arch, such as the previous generation of heat. After the coal seam is on fire, the fan is opened and the machine is ignited, so that the combustion is normal:
7.5 Exploration and operation attention items
75. H machine gland
) First out of the machine and then in parallel:
, first in parallel or in chaos. Then in the fan,
7.5.2 The machine is startled.
The machine and the parallel machine are pushed back
7.5.3 The normal T in the furnace seat meets the following requirements: the fire bed is flat and there is no cold fire mouth:
b) The fire is coming, please yellow, and the exhaust gas is locked) The furnace should hold a slight negative pressure, and positive pressure combustion is not allowed: the coal seam should be in the protected area of ​​0.8a-0.5 7.5.4 The flue gas temperature entering the heat exchanger should be controlled to less than 7 degrees through the air damper (the heat exchanger should be controlled to less than 859 degrees).
7.5.5 According to the thermal load of the whole furnace, when the heat storage required increases, the induced air volume and effective air volume should be increased; when the discharge speed is increased or the coal density is increased: b) when the thermal load is reduced, the excitation wind and the wind ear should be reduced, the discharge speed should be slowed down or the coal seam thickness should be reduced. 7.5.6 The fuel material should meet the following requirements. 1.1mm thick coal should be selected, and the thickness shall not exceed 40mm. The coal with a diameter of 3mm shall not be selected from the total coal volume: When the powder mound is larger than the lower or lower standard, it is necessary to use water according to the non-sea coal. c) For high-volatile coal and virtual early combustion, water can be added or the grate speed can be accelerated appropriately: ) The water in the coal hopper can be directly replaced.
7.5. The grate fan is related to the combustion hood, the light weight and the virtual load. ) The discharge speed should be controlled within 2/~14/h;
b) The first-order coal should be used for non-coal layer fast combustion:? When coal and bituminous coal are mixed, the coal layer should be burned in the month. 7.5. When the load changes, the thickness of the baking layer should be changed accordingly. It should not be moved too much after adjustment. 7.5.9 When the fire breaks, the flame should be moved to the top of the wood burning, or the lower part of the front supply should be changed to the wood. When the fire breaks, the grate should be stopped. Wait until the coal stops burning and then start the furnace. 7.5.10 When the heat blockage occurs, it should be broken or cleaned in time to make the coal enter and exit the machine or from the furnace smoothly! The door is full, and the rack is heavy. The coal type should be lightened.
7.5.11 When the grate coal is not smooth, the coal layer should be leveled, the fire mouth should be eliminated, and the fire bed should be kept flat. 7.5.12 Long-term fire suppression is not allowed: The fire suppression of the furnace should be carried out when the temperature in the furnace body is lowered, and the coal should not be removed too much. Coal should not be compressed within 2mm of the original distance.
7.5.73 The grate damper should be adjusted according to the combustion conditions of the furnace. In addition to fire and combustion difficulties, the grate damper should not be opened frequently:
7.5.74 For grate failure, the causes and troubleshooting methods are shown in Table 483.1.4 When the machine is shut down due to temporary power failure, various machines cannot operate. Please handle according to the requirements of 7. Coin and 4. 6.3.i.5 When restarting the machine, the following steps should be taken: 1) Heating of hot air furnace. When the flue gas density at the heat exchanger outlet does not reach 300℃, the drying machine cannot be operated: b) Starting of hot air blower:
When the hot air temperature reaches the requirement, open the grain discharging equipment and the grain discharging machine at the same time. The drying machine enters the positive belt operation. e
6.3.2 Long-term shutdown
1.S/T12062002
The machine with a depth of more than 100℃ or more than 100℃ for a long time: The machine should be handled according to the following two methods. 6.3..1 When the machine is in the machine! When the grain temperature in the store is high, turn off the equipment in front of the drying machine from front to back according to the disaster: if the food is gradually discharged, turn off the hot air inlet room 1. Reduce the amount of coal added to the hot air furnace: keep the cooling fan open, until all the food is evenly discharged from the drying machine: learn? First, turn off the grain discharge mechanism of the dryer, turn off the cold air fan: from the back, turn off the conveying and cleaning equipment behind the dryer: F
meaning to close the system:
stop expansion, the temperature is high!
6.2.2.2 When only the collecting tower is left in the machine, a series of methods can also be used: a) Use cannon to extinguish the remaining fire in the furnace:
b) Close the initial point and change the grain feeding;
Drain all the food:
d) Shut down the drying machine and its auxiliary equipment;
) Non-grain treatment
6.3.2.3 When there is only moisture in the machine, use a cannon to extinguish the remaining fire in the furnace:
b) Close the initial point and change the grain feeding;
D) Shut down the drying machine and its auxiliary equipment;
) Non-grain treatment
6.3.2.3 When there is moisture in the machine! The last tower of the hot blast furnace is used to carry grain. After the lights are turned off, the hot air blower is equipped with a damper to use the residual heat in the hot air to dry the grain. After the grain is dried, it is discharged. The operation of the hot blast furnace is completed. 7.1 Basic requirements. The hot blast furnace meets the requirements of IBT6. 7.2 Inspection before baking. The operator should conduct a comprehensive inspection of the hot blast furnace and its auxiliary equipment. The inspection is as follows: The guard plate is in good condition with the sprocket. It rotates smoothly at the staggered wheel shaft. 2. The grate plate is connected to the furnace. If the two sides of the grate are not in order with the furnace body, there will be a phenomenon of disorder. The guard plate is damaged and the silicon is damaged. The damaged parts should be replaced in time! 6. Install the bolts on the left car, and clean up the metal debris such as nails and butt heads; the water gate should be closed with a flexible structure, and the lower edge should be parallel to the working surface of the grate; the cover plate should be sealed: settling chamber. heat exchanger: virtual closing pressure or cultivation: the motor shaft should be lubricated with oil (grease): blower. induced draft fan, and the coal blower and outlet fan should be checked to be in normal operation. 7.3 Drying furnace
7.3.1 Before starting the hot air maintenance of the new furnace, carry out the drying under the manufacturer's instructions. 7.3.2 During drying maintenance, use small amount of firewood,
7.3.3 Gradually open and close the blower and induced draft fan, and the resistance of the cavity should not rise suddenly. 7.3.4 The temperature in the drying furnace shall not exceed 30UC measured by the humidity meter on the rear road of the settling chamber. 7.3.5 When the fan and the air outlet of the sedimentation air are not visible, and there are traces of moisture around the fan, the furnace can be stopped. The furnace drying time should be 5d-7d.
7.4
7.4.1 Sequence: ignite firewood-manual delivery-coal bucket loading-→+coal bunker board cabinet section→grate intermittent coal delivery→machine cover coal. 7
1.512052002
7.4. 2 Appeal
: Adjust the fan door. Air ventilation:
b) Initiate combustion, ten fans:
) Remove the seedlings when I am under the front arch, such as the previous generation of heat. After the coal seam is on fire, the fan is opened and the machine is ignited, so that the combustion is normal:
7.5 Exploration and operation attention items
75. H machine gland
) First out of the machine and then in parallel:
, first in parallel or in chaos. Then in the fan,
7.5.2 The machine is startled.
The machine and the parallel machine are pushed back
7.5.3 The normal T in the furnace seat meets the following requirements: the fire bed is flat and there is no cold fire mouth:
b) The fire is coming, please yellow, and the exhaust gas is locked) The furnace should hold a slight negative pressure, and positive pressure combustion is not allowed: the coal seam should be in the protected area of ​​0.8a-0.5 7.5.4 The flue gas temperature entering the heat exchanger should be controlled to less than 7 degrees through the air damper (the heat exchanger should be controlled to less than 859 degrees).
7.5.5 According to the thermal load of the whole furnace, when the heat storage required increases, the induced air volume and effective air volume should be increased; when the discharge speed is increased or the coal density is increased: b) when the thermal load is reduced, the excitation wind and the wind ear should be reduced, the discharge speed should be slowed down or the coal seam thickness should be reduced. 7.5.6 The fuel material should meet the following requirements. 1.1mm thick coal should be selected, and the thickness shall not exceed 40mm. The coal with a diameter of 3mm shall not be selected from the total coal volume: When the powder mound is larger than the lower or lower standard, it is necessary to use water according to the non-sea coal. c) For high-volatile coal and virtual early combustion, water can be added or the grate speed can be accelerated appropriately: ) The water in the coal hopper can be directly replaced.
7.5. The grate fan is related to the combustion hood, the light weight and the virtual load. ) The discharge speed should be controlled within 2/~14/h;
b) The first-order coal should be used for non-coal layer fast combustion:? When coal and bituminous coal are mixed, the coal layer should be burned in the month. 7.5. When the load changes, the thickness of the baking layer should be changed accordingly. It should not be moved too much after adjustment. 7.5.9 When the fire breaks, the flame should be moved to the top of the wood burning, or the lower part of the front supply should be changed to the wood. When the fire breaks, the grate should be stopped. Wait until the coal stops burning and then start the furnace. 7.5.10 When the heat blockage occurs, it should be broken or cleaned in time to make the coal enter and exit the machine or from the furnace smoothly! The door is full, and the rack is heavy. The coal type should be lightened.
7.5.11 When the grate coal is not smooth, the coal layer should be leveled, the fire mouth should be eliminated, and the fire bed should be kept flat. 7.5.12 Long-term fire suppression is not allowed: The fire suppression of the furnace should be carried out when the temperature in the furnace body is lowered, and the coal should not be removed too much. Coal should not be compressed within 2mm of the original distance.
7.5.73 The grate damper should be adjusted according to the combustion conditions of the furnace. In addition to fire and combustion difficulties, the grate damper should not be opened frequently:
7.5.74 For grate failure, the causes and troubleshooting methods are shown in Table 483.1.4 When the machine is shut down due to temporary power failure, various machines cannot operate. Please handle according to the requirements of 7. Coin and 4. 6.3.i.5 When restarting the machine, the following steps should be taken: 1) Heating of hot air furnace. When the flue gas density at the heat exchanger outlet does not reach 300℃, the drying machine cannot be operated: b) Start of hot air blower:
When the hot air temperature reaches the requirement, open the grain discharging equipment and the grain discharging machine at the same time. The drying machine enters the positive belt operation. e
6.3.2 Long-term shutdown
1.S/T12062002
The machine with a depth of more than 100℃ or more than 100℃ for a long time: The machine should be handled according to the following two methods. 6.3..1 When the machine is in the machine! And the amount of grain in the store tower temperature: from front to back according to the disaster to close the drying machine before the equipment: up) if the block below the stable food gradually empty, the user above the hot air Kai equipment into the air room 1. Step by step to reduce the amount of coal added to the hot air furnace: keep the cooling fan open, until all the food is evenly discharged from the drying machine: practice? Ai cut the grain discharge mechanism of the dryer first, turn off the cold air fan: from the back you turn off the idle dryer after the conveying, cleaning equipment: F
meaning of the system:
stop expansion, the temperature on the rest of the big!
6.2.2.2 When only the collecting tower is left in the machine, a series of methods can also be used: a) Use cannon to extinguish the remaining fire in the furnace:
b) Close the initial point and change the grain feeding;
Drain all the food:
d) Shut down the drying machine and its auxiliary equipment;
) Non-grain treatment
6.3.2.3 When there is only moisture in the machine, use a cannon to extinguish the remaining fire in the furnace:
b) Close the initial point and change the grain feeding;
D) Shut down the drying machine and its auxiliary equipment;
) Non-grain treatment
6.3.2.3 When there is moisture in the machine! The last tower of the hot blast furnace is used to carry grain. After the lights are turned off, the hot air blower is equipped with a damper to use the residual heat in the hot air to dry the grain. After the grain is dried, it is discharged. The operation of the hot blast furnace is completed. 7.1 Basic requirements. The hot blast furnace meets the requirements of IBT6. 7.2 Inspection before baking. The operator should conduct a comprehensive inspection of the hot blast furnace and its auxiliary equipment. The inspection is as follows: The guard plate is in good condition with the sprocket. It rotates smoothly at the staggered wheel shaft. 2. The grate plate is connected to the furnace. If the two sides of the grate are not in order with the furnace body, there will be a phenomenon of disorder. The guard plate is damaged and the silicon is damaged. The damaged parts should be replaced in time! 6. Install the bolts on the left car, and clean up the metal debris such as nails and butt heads; the water gate should be closed with a flexible material, and the lower edge should be parallel to the working surface of the grate; the cover plate should be sealed: settling chamber. heat exchanger: virtual closing pressure or cultivation: the motor shaft should be lubricated with oil (grease): blower. induced draft fan, and the coal blower and outlet fan should be checked to be in normal operation. 7.3 Drying furnace
7.3.1 Before starting the hot air maintenance of the new furnace, carry out the drying under the manufacturer's instructions. 7.3.2 During drying maintenance, use small amount of firewood,
7.3.3 Gradually open and close the blower and induced draft fan, and the resistance of the cavity should not rise suddenly. 7.3.4 The temperature in the drying furnace shall not exceed 30UC measured by the humidity meter on the rear road of the settling chamber. 7.3.5 When the fan and the air outlet of the sedimentation air are not visible, and there are traces of moisture around the fan, the furnace can be stopped. The furnace drying time should be 5d-7d.
7.4
7.4.1 Sequence: ignite firewood-manual delivery-coal bucket loading-→+coal bunker board cabinet section→grate intermittent coal delivery→machine cover coal. 7
1.512052002
7.4. 2 Appeal
: Adjust the fan door. Air ventilation:
b) Initiate combustion, ten fans:
) Remove the seedlings when I am under the front arch, such as the previous generation. After the coal seam is on fire, the fan is opened and the machine is ignited, so that the combustion is normal:
7.5 Exploration and operation attention items
75. H machine gland
) First out of the machine and then in parallel:
, first in parallel or in chaos. Then in the fan,
7.5.2 The machine is startled.
The machine and the parallel machine are pushed back
7.5.3 The normal T in the furnace seat meets the following requirements: the fire bed is flat and there is no cold fire mouth:
b) The fire is coming, please yellow, and the exhaust gas is locked) The furnace should hold a slight negative pressure, and positive pressure combustion is not allowed: the coal seam should be in the protected area of ​​0.8a-0.5 7.5.4 The flue gas temperature entering the heat exchanger should be controlled to less than 7 degrees through the air damper (the heat exchanger should be controlled to less than 859 degrees).
7.5.5 According to the thermal load of the whole furnace, when the heat storage required increases, the induced air volume and effective air volume should be increased; when the discharge speed is increased or the coal density is increased: b) when the thermal load is reduced, the excitation wind and the wind ear should be reduced, the discharge speed should be slowed down or the coal seam thickness should be reduced. 7.5.6 The fuel material should meet the following requirements. 1.1mm thick coal should be selected, and the thickness shall not exceed 40mm. The coal with a diameter of 3mm shall not be selected from the total coal volume: When the powder mound is larger than the lower or lower standard, it is necessary to use water according to the non-sea coal. c) For high-volatile coal and virtual early combustion, water can be added or the grate speed can be accelerated appropriately: ) The water in the coal hopper can be directly replaced.
7.5. The grate fan is related to the combustion hood, the light weight and the virtual load. ) The discharge speed should be controlled within 2/~14/h;
b) The first-order coal should be used for non-coal layer fast combustion:? When coal and bituminous coal are mixed, the coal layer should be burned in the month. 7.5. When the load changes, the thickness of the baking layer should be changed accordingly. It should not be moved too much after adjustment. 7.5.9 When the fire breaks, the flame should be moved to the top of the wood burning, or the lower part of the front supply should be changed to the wood. When the fire breaks, the grate should be stopped. Wait until the coal stops burning and then start the furnace. 7.5.10 When the heat blockage occurs, it should be broken or cleaned in time to make the coal enter and exit the machine or from the furnace smoothly! The door is full, and the rack is heavy. The coal type should be lightened.
7.5.11 When the grate coal is not smooth, the coal layer should be leveled, the fire mouth should be eliminated, and the fire bed should be kept flat. 7.5.12 Long-term fire suppression is not allowed: The fire suppression of the furnace should be carried out when the temperature in the furnace body is lowered, and the coal should not be removed too much. Coal should not be compressed within 2mm of the original distance.
7.5.73 The grate damper should be adjusted according to the combustion conditions of the furnace. In addition to fire and combustion difficulties, the grate damper should not be opened frequently:
7.5.74 For grate failure, the causes and troubleshooting methods are shown in Table 48Heat exchanger dissipation: false pressure or deadness: the motor adjustment connector (coupler) produced by the machine shaft must be lubricated with oil (grease) according to the weight of the motor: blower, draft gauge, soil coal machine and submersible machine Review the normal operation of the oven 7.3
7.3.1 Before starting the hot air protection of the new machine, the oven must be dried under the manufacturer's instructions. 7.3.2 Use this firewood to dry the plate during drying, | |tt||7.3.3 Gradually draw coal, turn on the draft fan, and the cavity should not rise suddenly. 7.3.4 The temperature in the oven, determined by the moisture meter on the back channel of the settling chamber, should not exceed 30UC . 7.3.5 When there is no visible steam in the fan protection and settling air outlet, and there are traces of moisture in the sub-circuit, the oven can be terminated. The oven time should be 5d--7d,
7.4 days Tip
7.4.1 Sequence: Start firewood, deliver it manually, then load it into the coal hopper - → + Bobange section of the coal bunker → intermittently feed the coal to the grate → put the coal on the machine. 7 | | tt | | 1.512052002 | | tt | |tt||) Put the disaster seedlings away under me under the front arch, as hot as the previous generation. After the coal seam is continuously ignited, the wind blows loudly, causing the scenery to change, so the burning slip test is normal:
7.5 Exploration Attention Rate Item
75. H Machinery gland
) The machine is born to cure, and then the machine is combined to protect the accuracy:
, merge first or chaos. Then dare to blow the machine,
7.5.2 machine is shocked, then
The chip machine and the parallel machine are reversed| |tt||7.5.3 The normal temperature inside the furnace base shall meet the following requirements: "The fire bed is flat and there is no cold reflection port:
b) The fire is incoming, the top is yellow, and the discharged air is uniform. (Color) The furnace should be lightly stimulated with negative pressure, and should not be burned under positive pressure: the coal seam should be heated to a temperature of 0.8a-0.5 at the bottom of the protected area. 7.5.4 When the wine is passed, a damper will be required to enter the heat exchanger. The flue gas temperature should be controlled at less than 7 (stainless steel heat exchanger should be controlled at less than 859:).
7.5.5 degrees. According to the need for heat for drying, the load of the whole furnace is said to be high, and heat is needed. When the coal storage increases, the induction volume and effective air volume should be increased. When the discharge speed is increased or the coal intensity is increased: b) When the heat load in Mazhou decreases, the stress on the wind and bow will be reduced, and the wind ear and net will be discharged slowly or the exhaust speed will be reduced. The thickness of the coal seam is small, and the sample and payment of fuel in 7.5.6 meet the following requirements. ) Coal should be selected from 1.1 and 1. Coal thickness should not exceed 40mm. Coal with a diameter of 3mm should not account for 33% of the total coal quantity: when the refining mound is too large or the two types of coal are fired, it must be based on the water and the sea. c) For coal with high volatile content and early combustion, you can also add water appropriately or speed up the grate:) You can directly replace the porcelain water in the coal hopper.
7.5. Remove the grate Confusion is related to Ranke Cover Exhibition, Ranqingqi and Deficiency Load. ) The discharge speed should be controlled at 2/~14/min;
b) Once existing coal should be burned quickly with non-coal seams:? When coal and 10,000-bituminous coal are mixed, the coal seam should be burned at a slow speed due to excessive moisture in the coal. 7.5. Only when the load changes are more effective and the coal type is changed, the baking bed The thickness should be changed accordingly. It is not advisable to move too much after finishing. 7.5.9 When a fire breaks out, the flame should be raised to the end of the wood burning, or the lower part should be replaced by the wood table. When the fire breaks out and inspection is carried out, the operation of the grate should be stopped. Wait for the coal to stop burning normally before starting the furnace cleaning. 7.5.10 When heat buildup occurs and hinders ventilation, the grate should be broken or cleaned in time to allow the coal to enter and exit the machine smoothly. furnace! If the door is full, add rack nodes to produce heavy coal types and lighten them.
7.5.11 When it is found that the coal in the grate is not drained, the coal seam should be leveled to eliminate the fire mouth and keep the fire bed flat. 7.5.12 Long-term pressurization is not allowed: The furnace pressurization should be carried out when the temperature of the furnace body drops, and the coal should not be removed too much. Coal should not be pressed within 2mm of its original distance.
7.5.73 The grate dampers should be adjusted according to the burning conditions of the furnace. To prevent fire and combustion, it is not advisable to open the grate damper frequently:
7.5.74 Furnace Troubleshooting, the four causes and troubleshooting methods are shown in Table 48Heat exchanger dissipation: false pressure or deadness: the motor adjustment connector (coupler) produced by the machine shaft must be lubricated with oil (grease) according to the weight of the motor: blower, draft gauge, soil coal machine and submersible machine Review the normal operation of the oven 7.3
7.3.1 Before starting the hot air protection of the new machine, the oven must be dried under the manufacturer's instructions. 7.3.2 Use this firewood to dry the plate during drying, | |tt||7.3.3 Gradually draw coal, turn on the draft fan, and the cavity should not rise suddenly. 7.3.4 The temperature in the oven, determined by the moisture meter on the back channel of the settling chamber, should not exceed 30UC . 7.3.5 When there is no visible steam in the fan protection and settling air vents, and there are traces of moisture in the subsidence, the oven can be terminated. The oven time should be 5d--7d,
7.4 days Tip
7.4.1 Sequence: Start firewood, deliver it manually, then load it into the coal hopper - → + Bobange section of the coal bunker → intermittently feed the coal to the grate → put the coal on the machine. 7 | | tt | | 1.512052002 | | tt | |tt||) Put the disaster seedlings away under me under the front arch, as hot as the previous generation. After the coal seam is continuously ignited, the wind blows loudly, causing the scenery to change, so the burning slip test is normal:
7.5 Exploration Attention Rate Item
75. H Machinery gland
) The machine is born to cure, and then the machine is combined to protect the accuracy:
, merge first or chaos. Then dare to blow the machine,
7.5.2 machine is shocked, then
The chip machine and the parallel machine are reversed| |tt||7.5.3 The normal temperature inside the furnace base shall meet the following requirements: "The fire bed is flat and there is no cold reflection port:
b) The fire is incoming, the top is yellow, and the discharged air is uniform. (Color) The furnace should be lightly stimulated with negative pressure, and should not be burned under positive pressure: the coal seam should be heated to a temperature of 0.8a-0.5 at the bottom of the protected area. 7.5.4 When the wine is passed, a damper will be required to enter the heat exchanger. The flue temperature should be controlled at less than 7 degrees (the stainless steel heat exchanger should be controlled at less than 859:). | When the coal storage increases, the induction volume and effective air volume should be increased. When the discharge speed is increased or the coal visibility is increased: b) When the heat load in Mazhou decreases, the stress on the wind and bow will be reduced, and the wind ear and net will slow down the discharge speed or the exhaust rate will be reduced. The thickness of the coal seam is small, and the sample and payment of fuel in 7.5.6 meet the following requirements. ) Coal should be selected from 1 and 1, and coal with a thickness of 3mm should not exceed 40mm. Coal with a diameter of 3mm should not account for 33% of the total coal quantity: when the refining mound is too large or the two types of coal are fired, it must be based on the water and the sea. c) For coal with high volatile content and early combustion, you can also add water appropriately or speed up the grate:) You can directly replace the porcelain water in the coal hopper.
7.5. Remove the grate Confusion is related to Ranke Cover Exhibition, Ranqingqi and Deficiency Load. ) The discharge speed should be controlled at 2/~14/min;
b) Once existing coal should be burned quickly with non-coal seams:? When coal and 10,000-bituminous coal are mixed, the coal seam should be burned at a slow speed due to excessive moisture in the coal. 7.5. Only when the load changes are more effective and the coal type is changed, the baking bed The thickness should be changed accordingly. It is not advisable to move too much after finishing. 7.5.9 When a fire breaks out, the flame should be raised to the end of the wood burning, or the lower part should be replaced by the wood table. When the fire breaks out and inspection is carried out, the operation of the grate should be stopped. Wait for the coal to stop burning normally before starting the furnace cleaning. 7.5.10 When heat buildup occurs and hinders ventilation, the grate should be broken or cleaned in time to allow the coal to enter and exit the machine smoothly. furnace! If the door is full, add rack nodes to produce heavy coal types and lighten them.
7.5.11 When it is found that the coal in the grate is not drained, the coal seam should be leveled to eliminate the fire mouth and keep the fire bed flat. 7.5.12 Long-term pressurization is not allowed: The furnace pressurization should be carried out when the temperature of the furnace body drops, and the coal should not be removed too much. The coal should not be pressed within 2mm of its original distance.
7.5.73 The grate dampers should be adjusted according to the burning conditions of the furnace. To prevent fire and combustion, it is not advisable to open the grate damper frequently:
7.5.74 Furnace Troubleshooting, the four causes and troubleshooting methods are shown in Table 48