title>Key points for manufacture quality control of thin film resistors - SJ/T 10219-1991 - Chinese standardNet - bzxz.net
Home > SJ > Key points for manufacture quality control of thin film resistors
Key points for manufacture quality control of thin film resistors

Basic Information

Standard ID: SJ/T 10219-1991

Standard Name:Key points for manufacture quality control of thin film resistors

Chinese Name: 薄膜电阻器制造质量控制要点

Standard category:Electronic Industry Standard (SJ)

state:in force

Date of Release1991-05-28

Date of Implementation:1991-12-01

Date of Expiration:2010-01-20

standard classification number

Standard Classification Number:General>>Standardization Management and General Provisions>>A01 Technical Management

associated standards

Publication information

other information

Introduction to standards:

SJ/T 10219-1991 Key points for quality control of thin film resistors SJ/T10219-1991 standard download decompression password: www.bzxz.net



Some standard content:

SJ/T 10219-91 Electronic Industry Standard of the People's Republic of China
Main Points for Quality Control of Thin Film Resistors
Published on 1991-05-28
Implemented on 1991-12-01
Published by the Ministry of Machinery and Electronics Industry of the People's Republic of China
Main Points for Quality Control of Thin Film Resistors
Subject Content and Applicable Scope
SJ/T 10219-91
This standard specifies the main control methods and basic control methods of the manufacturing process of thin film resistors. This standard specifies the manufacturing process of three types of thin film resistors: carbon type, metal type, chemically resistive thin film type, and oxide film type. The quality control of the manufacturing process of other thin film resistors can also refer to this standard. When applying this standard, the content of the standard should be appropriately tailored according to the characteristics of the product manufacturing process. Reference standards
SJ/T 10221
General electronic components manufacturing quality management index GBS7ES
CB5730
C3 6834
GB8552
GB7275
ST2A6S
3 Basic requirements of control
Fixed resistors for radio and television equipment Part 1 General specification Fixed resistors for electronic equipment
Part 2 Sub-specification: Low power non-linear fixed resistors Assessment level F
Detailed specification for electronic equipment
Low power non-linear fixed resistance RT type film fixed resistors Assessment level E
Detailed specification for electronic equipment
Low power non-linear fixed resistors R Type 20 metal film fixed device assessment level
Detailed specification for electronic components Low power non-wire wound resistor R3 type metal film fixed device assessment level E
Detailed specification for electronic components Low power non-wire wound resistor R5 type metal film fixed device assessment level
Detailed specification for electronic components Low average power non-wire wound resistor J20 type metal film fixed device assessment level E
3.1 Raw materials and parts
3.1.1 Grading and monitoring requirements for suppliers of purchased and outsourced raw materials and parts According to the quality assurance and quality history of raw materials and parts suppliers, the suppliers are divided into excellent, good, acceptable and poor types and included in the grading table.
Advantages and Disadvantages: "Priority is given to the purchase of raw and auxiliary materials and spare parts from high-quality factories in large quantities, and the purchase of auxiliary materials and spare parts from high-quality factories is appropriate. The purchase of raw and auxiliary materials and spare parts from low-quality factories is prohibited; the purchase of raw and auxiliary materials and spare parts from low-quality factories is prohibited. Approved by the Ministry of Machinery and Electronics Industry of the People's Republic of China on May 28, 1991, and implemented on December 1, 1991
SJ/ 10219--97
Regularly audit the quality assurance capabilities of the factory for key raw and auxiliary materials and parts in the relevant supply chain: Combined with the acceptance of raw and auxiliary materials and parts, timely adjust the supply efficiency to a certain level, and put on the supply quality list of outsourced raw and auxiliary materials and parts. 3.12 Raw materials and parts are classified into key categories according to the requirements of the quality assurance requirements, which will not affect the final quality of the components. The raw and auxiliary materials and parts of the relevant supply chain can be effectively controlled. For general auxiliary materials and parts, the quality assurance requirements are shown in Tables 2 and 3.
For the safety classification and control requirements of key raw and auxiliary materials and parts in the relevant supply chain, see Tables 2 and 3.? 32.1 Importance classification of manufacturing management process
Based on the impact of process quality on product sustainability, process complexity and quality history, the whole process should be divided into three categories: critical, important and general: For key processes, quality control points must be set for key control: For important processes, effective control should be exercised, and quality control points can be set up when necessary; For short processes, appropriate control should be given. 3.2-2 Final manufacturing process
Take the key points of production equipment according to the quality level and the quality training plan related to the product: determine the sequence of control and measurement objectives, requirements, development methods, etc., and draw a "process diagram" with management, register table 3, 3.3 Production equipment
3-3.1 Equipment point control
According to the production equipment, the degree of "product quality sustainability" shall be more important, and the production stage shall be divided into four key, primary and secondary, key and important production equipment shall be maintained and expanded regularly, and production shall be certified according to the specifications, without the need for high qualification and seal. The inspection requirements for relevant links and production equipment in the manufacturing process of standard resistors are shown in Table 4. 3.3.2 Equipment operating hours record
The operator should write down the equipment operating hours record (operating time, downtime) during daily use of the equipment; 3.4 Post-epidemic requirements for full test
According to the requirements of product quality maintenance, the stability of test instruments and equipment should be improved. The fault test equipment should be divided into relevant, important and staged categories, and preventive maintenance plans should be formulated for each situation. The interval between each type of test equipment should be based on the standard. For the requirements of key links, evaluation and calibration of each section of the test equipment, please refer to Table 5.35 The working area is not in the environment of the tobacco T zone. The environment of the product is manufactured in a controlled manner. It is divided into three levels: key, medium and general. The minimum environmental quality requirements of each level are specified. For the requirements of the process hygiene level of the important and slow zones, please refer to Table 3.6 Failure analysis When the product takes effect, the failure relaxation is carried out under the process specified in the effective analysis diagram of Figure 1. Table 7.3. Product inspection or quality inspection includes batch inspection and periodic inspection. The inspection group or, the inspection period, the test method, the test item, the test wear, the installation requirements and the test method shall be in accordance with (5729.CB5730, C5721 and GB851GB5834.GR8552, 5, SX and other relevant production standards. The quality records of each inspection shall be regularly counted to reflect the quality of the manufacturing process under control. -3
3. Quality Management
3.9.1 Product Audit
$/T1021991
Product quality management records shall be reviewed once every October. 6.3.8.2 The process quality management system should conduct a process quality audit every three months. The quality audit record card is shown in Table 3.3.9 Personnel training Regular training should be conducted for all types of personnel. Those who do not meet the requirements shall not be allowed to work. The training requirements for all types of personnel are shown in Table 10. Table 1 List of suppliers of outsourced auxiliary shaft materials and parts Outsourced and outsourced auxiliary materials 254 Outsourced and outsourced parts (without brackets) Outsourced speed iron (oil) The same price should be used. The total position monitoring and control measures shall be determined for 1 year and the auxiliary materials and parts shall be supplied to the factory for batch supply at least once. 2 Each user factory shall estimate the quality of all auxiliary materials and parts used in the factory once for non-factory original materials and parts supply factories. The period of contract estimation is three years, and the technical requirements for batch production and special control measures shall be implemented. t||Connect and think
Resist doing rubber change
Durable sitting
Frequency of breath
Quality fast change
Can girls
Front voltage
External inspection pot
SJ/T1021991
Leading the world
Ruler general folk customs fast forward,
×:-
Sex/item
Secret solution slow treatment
Outside Linzhou Gate
Absorb fixed hair physique
Outside Lin item under matching
"Light—
SJ:T 10215—91
Its County Automotive Real Technology InstitutebzxZ.net
Telephone Real
Zero East Court
Wang's Bi Ai Hua
Sex Changes Rapidly
Chang Shou Jiege
Chuanbei Ruitong Store
Each Adjustment Line
Most Sea Engineering
Red Hair Tree Seals Your Old Membrane Steam Accumulation
SJ:T 1213--01
Batch of pedestrians
Special world letter
Talk about dampness
Total Dragon City
Upper limit of the country
Let the election change
Waiting for the Christmas version
Supplement blessing window
Base center and light
Niu is not here
Xiong'antai
Shenqi welcome
Chemical Han accumulation and integration
Strong increase
Xie installation line
Point control accounted for
This activity
Good quality sister
Sy/1 10219—91
Close the chain, more production this point requirements
point teaching equipment
and on the right
real heart meter
Austrian guard meter
hygrometer
virtual estimate thank you for the change
drum six circles
same low logic installation public manufacturing this
will road state according to
spectrum enough to be thick
with see the upper support installation
full scale! Request
Meet the requirements
Meet the work is
Inspection period
1 person into
Point to start the person
Raise the standard gas list
Select the person to estimate
Explore the single personnel
Select the person to enter the milk
SJ/T 10219
Ya painting +
Name Ya non
Tongue Ya mountain:
Things/:
Auoc[- 2
GOE--
ASi--u
Acast--
L -- s5
7nll't.-r-'?
wi1*-.1--7l:\
UO[--tG
UaG1--u1-n
5J/T 10219
This is my rental collection
efa,x2D
.. . . .
Zhongneng Zhilong Limited
Industry Library Name Cup
Some hair hidden shooting
Super clean short
SJ/T 10219—91
Environmental requirements for key and important processing areas
10--30
Technology requirements
Nuclear engineering safety requirements
First-level engineering safety requirements:
Humidity ()
45-- 75
According to the core requirements
According to the process requirements
() The four prohibitions in the workroom are: the floor should not be clean, the temperature should not be too dry, and the humidity should not be too high. The work should be tested and installed with double windows. The window-closing operation should be carried out. The operator should remember to use all the equipment and materials that are not used according to the technical regulations and other legal materials before entering. All the raw materials and parts and fixtures entering the workroom must be clean and neatly arranged according to the regulations. 》Strictly control the total number of people working in the company, and the person in charge of the work can be any person who is responsible for the work. E: The person who is working must wear the clothes that are not needed for production! "Work clothes, hair must be in the corresponding clothes" () It is strictly forbidden to bring items that are not needed for production. Workers are strictly prohibited from eating, smoking, and changing items. () When working, they should be in the school! Feel the requirements, use the money quickly, wear rust or other work clothes, report the rules of the students, () The production should be reduced, and the equipment and facilities should be implemented or affected. () Daily management, daily cleaning, and the workroom should be clean and tidy. The first-level sanitation area requires
to reach the garbage sanitation area a), (e) ,(f),(g),(h),Ci),(>year's regulations step by step to protect
strict product time 4
Three mountains first build sub-standard
2. Fixed item development
Five Lang school tour
Travel agent
1. Shu system defective product
One analysis
Two. Failure report
2. Failure tablets
Common situation
(Failure machine spot company such as
Still see sugar pattern
《Information machine
Figure 1 Failure analysis reduction diagram
Analysis only and defect
X—556
Electronic probe image separation amplifier
(EPMA)
FEMODCX type
Input electron beam balance
Production and receipt name total type
Production (inventory)
Auditor
S1/r10219—91
Table 7 Failure analysis equipment and receiving end and its control requirements are relatively accurate or
Xiong Xie Cycle
According to the instrument group
According to the only instrument competition
Number of market standards
Fast fat mood record
According to the standard
Difficult model
Welcome to the old data
This micro-author
Special non-standard situation:
Product science and technology review card
Status!
Welcome to the standard
Heroic move
Full-time staff
Full-time staff
Production H period
Central nuclear date(>The regulations of the year are gradually pointed out.
Strict product time 4
Three mountains first built sub-standard
2. Fixed project development
Five Lang school tour
Travel agent
1. Relaxed product
1. Analysis
2. Failure report
2. Failure piece product
Common situation
(Failure machine spot such as
Still see sugar pattern
《Information machine
Figure 1 Failure analysis reduction diagram
Analysis only device and defect
X-556
Electron probe image separation
(EPMA)
FEMODCX type
Introduction to radio frequency measurement
Product name Total type
Production (inventory)
Auditor
S1/r10219-91
Table 7 Loss analysis equipment and receiving end and its control requirements are relatively accurate or
Cooperation cycle
According to the instrument group
According to the only instrument
Number of market standards
Fast fat feeling record
According to the standard
Difficult model
Welcome to the old data
This micro
Special non-standard situation:
Product science and technology audit record request card
Status!
Welcome to the accurate
Featured
Full-time personnel
Full-time personnel
Production period
Central nuclear date(>The regulations of the year are gradually pointed out.
Strict product time 4
Three mountains first built sub-standard
2. Fixed project development
Five Lang school tour
Travel agent
1. Relaxed product
1. Analysis
2. Failure report
2. Failure piece product
Common situation
(Failure machine spot such as
Still see sugar pattern
《Information machine
Figure 1 Failure analysis reduction diagram
Analysis only device and defect
X-556
Electron probe image separation
(EPMA)
FEMODCX type
Introduction to radio frequency measurement
Product name Total type
Production (inventory)
Auditor
S1/r10219-91
Table 7 Loss analysis equipment and receiving end and its control requirements are relatively accurate or
Cooperation cycle
According to the instrument group
According to the only instrument
Number of market standards
Fast fat feeling record
According to the standard
Difficult model
Welcome to the old data
This micro
Special non-standard situation:
Product science and technology audit record request card
Status!
Welcome to the accurate
Featured
Full-time personnel
Full-time personnel
Production period
Central nuclear date
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.