JB/T 8651.4-1997 This standard specifies the basic parameters and installation dimensions, technical requirements, test methods and acceptance rules of block-type progressive distributors, as well as marking, packaging, transportation and storage. This standard is applicable to machine tool lubrication systems, and can also be used as a reference for lubrication systems of other machines. JB/T 8651.4-1997 Machine tool lubrication system components Block-type progressive distributors JB/T8651.4-1997 Standard download decompression password: www.bzxz.net
Some standard content:
Machinery Industry Standard of the People's Republic of China [E/T8651.4-1997 Machine tool lubrication system components Block type progressive distributor E997-08-18 Issued Ministry of Machinery Industry of the People's Republic of China Implementation on 1998-01-01 JB/TB651.4—1997 This standard was proposed by the National Technical Committee for Standardization of Metal Cutting Machine Tools. This standard is under the jurisdiction of Beijing Machinery Research Institute of the Ministry of Machinery Industry. The drafting units of this standard are Beijing Machine Tool Research Institute of the Ministry of Machinery Industry, Jianglaijia Circulation Machinery Lubrication Co., Ltd., Beijing No. 1 Machine Tool Factory, and Beijing No. 1 Machine Tool Factory. ■ Scope Machinery Industry Standard of the People's Republic of China Machine Tool Lubrication System Components Block Type Progressive Distributors JR/T8651.4·1997 This standard introduces the basic parameters and installation dimensions, technical requirements, test methods and acceptance rules and signs, packaging, transportation and storage of block type progressive distributors. This standard is applicable to machine tool lubrication systems. Other machine tool test systems may also be used. 2 Applicable standards The following standard products contain texts that constitute the provisions of this standard through reference in the standard: When this standard was published, the average version shown was effective. All standard books will be ordered by you. The same standard parts should be considered to use the latest version of the following standards: GR 191 GH 91-8? GH 492: 8S CB 724-04 E/1330e91 T320791 B/T 4121-53 1/71983 21 J55 003 -88 2B 15C 013R 3 Product marking Illustration of installation station Calcium-based lubricating agent Sodium tea lubricant General-purpose lubricating agent Machine tool parts: product package technical case temperature lubricating elements and installation method Machine tool accessories random technical documents abbreviation To the same plan before the machine to adapt to the test Machine tool rust breaking technical conditions Subject E1 stipulated, block type recursive counter order number abbreviation such as JPQ 3.2 Recording example Pu period code: decision Soil parameters: each hole measurement basis: m posts ring Public music effect: level! Product name code, fast delivery distributor front number: standard hole efficiency public type fertilization =MP oil tile is issued 8 plate holes for a single n.25m:./clear evaluation block road type distribution road medicine standard submission example: Machinery and environment industry ministry approved on 1997-08-18 1908-0101 implementation bZxz.net 4 basic base number and installation size 4.1 integer: see table ]PQ-33. 2aA xJPQ-JJ.saA JE/T 86S1.410y7 device 8FQ.1.5A81.4a Zixiao Leli 4. Installation ruler (Figures 1 and 2) FIPQ-J0. 25.A S1Q.J0.:5A 5Technical requirements etc. hole cold +5×1Notes xLian family Health has filled environment quality 291192,74[slip 5have parts material.Positive working quality potential to meet the old management of high density"quality has chemical quality.IB/T8651.41997 5.3Nominal pressure side, oil output can not rely on small table 1 ship compensation, S.4 standard elimination parts 5.5 The appearance of the surface is smooth, without corrosion, scratches and other defects. 5.6 Under the nominal pressure, after the distributor is working, the oil outlet of each oil outlet of the distributor should be measured. The oil outlet should be more than ten times the value specified in the table. 5.7 Under the nominal pressure, when the distributor is feeding the oil, the oil outlet of each oil outlet should be the same. The difference should be 2M5.8 During the test, the connection parts should not be sealed. 5. During the test, the leakage of each oil outlet per minute should not be greater than 5 times the impulse rate specified in Table 1. 5. Under the annual load, the distribution of the work of not less than 150,000 times, the cleanliness limit of the public distribution should not exceed × 1/unit (the number of distributors) (test method 6.1 Test system 6. 1 Reduce the test medium, use rr~ plastic base when deep, 6.1.2 Test ring culture temperature: 15~ f, 2 Determination of shrinkage oil volume (determination principle diagram 2), o " Shan system 2-valve, table, 4 distributor: 5 one flash: a cup diagram 2 test principle that is, consult the diagram principle wide oil outlet pipe adjust Le flash 5 as the table [depending on the public record pressure, the main injection pipe circumference version of three.25 times the public grid mountain force, the standard of the work piece, separately determine the output of each outlet 1 center of a cycle, the deviation should meet the provisions of 5.6, must be made and injected with an appropriate amount of media fairy or with ester with good compatibility with the agent, the mother core Shengzhi in the test station a value of the oil output list, 6.3 Work prohibited measurement In this paper, under the principle of 2 ratio, the oil replacement and the pressure gauge reading on the oil outlet pipe are used to read the small point in the name of the distributor. The oil hole of the product should be the average pressure deviation. The wheel is set to 0. + empty seal color 5.2 test. Adjust the belt L idle = to the nominal pressure within 1.25 in Table 1, and keep 3m. The distributor meets the regulations of 5.8 of the platform. 6 new damage you 4 test conditions, when the distributor stops, at this time, the list of certificates is eliminated, and the six inspections meet the regulations of the platform! 66 again. Under the normal force of this public demolition, the public distribution is changed to the poor combination of 5 plans and certificates 3 for the clarity test JB/T 865t.±—1997 Sampling shall be conducted from the distribution after assembly and inspected by weight method in ZB J5C 303. The cleanliness shall meet the requirements of 5.11. 7 Acceptance rules 7.1 Each block type progressive distributor shall be tested before release. The test shall be carried out according to the requirements of 6.1, 5.2, 6.4. 7.2 Each block type progressive distributor shall be inspected and qualified in the factory before release. 7.3 Type test For products that are not trial-produced, or when there are major changes in the structure, material and process of the block type progressive distributor, type test shall be carried out: The content of type test includes: ) All contents of factory test specifications Price test: c) Data leakage test: d) Cleanliness test. 8 Marking, packaging, transportation and storage 81 Each product shall be marked with a product label. Its style and size shall be in accordance with GB/T13. The label shall include: a) Model and name: Nominal pressure: d) 1 Number; e) Processing station 2 The accompanying product shall be accompanied by technical documents. The documents shall be in accordance with the provisions of 71. The documents include: a) Product instruction card: b) Product certificate and packing list. 8.3 The exposed parts of the product shall be treated with anti-casting and packaged in accordance with the provisions of 50 to 3. 8.4 The packaging of the product shall comply with the provisions of JB/T1207 and shall be suitable for water transport. The running water can be kept in the box for up to ¥ months. The packaging standards for long-distance transport shall comply with the relevant regulations of GB191. 6 The product should be stored in a dry, ventilated, moisture-free and air-free place for some years. Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.