title>SJ/T 31050-1994 Electroplating production line integrity requirements and inspection and assessment methods - SJ/T 31050-1994 - Chinese standardNet - bzxz.net
Home > SJ > SJ/T 31050-1994 Electroplating production line integrity requirements and inspection and assessment methods
SJ/T 31050-1994 Electroplating production line integrity requirements and inspection and assessment methods

Basic Information

Standard ID: SJ/T 31050-1994

Standard Name: Electroplating production line integrity requirements and inspection and assessment methods

Chinese Name: 电镀生产线完好要求和检查评定方法

Standard category:Electronic Industry Standard (SJ)

state:in force

Date of Implementation:1997-01-01

Date of Expiration:2017-05-12

standard classification number

Standard Classification Number:Comprehensive>>Basic Standards>>A29 Material Protection

associated standards

Publication information

other information

Introduction to standards:

SJ/T 31050-1994 Electroplating production line integrity requirements and inspection and assessment methods SJ/T31050-1994 standard download decompression password: www.bzxz.net



Some standard content:

Electronic Industry Standard of the People's Republic of China
Integrity requirements and inspection and assessment methods for electroplating production lines 1 Subject content and scope of application
This standard specifies the integrity requirements and inspection and assessment methods for electroplating production lines. SJ/T31050-94
This standard applies to linear (gantry, cantilever) crane-held plating and roller plating production lines. Other types of electroplating production lines can also refer to this standard.
2 Reference standards
GB8978·88 Comprehensive sewage discharge standard
3 Integrity requirements
3.1 Main parameters and performance indicatorswwW.bzxz.Net
The travel, speed, roller speed and hook lifting distance of the crane equipment of the electroplating production line shall all meet the values ​​specified by the manufacturer. The productivity shall not be less than 90% of the manufacturer's specifications. 3.2 Plating tanks and rollers
3.2.1 A single plating tank shall comply with SJ/T31052-94 "Integrity Standard for General Electroplating Tanks". 3.2.2 The rollers are not damaged, and there are no loose parts.
3.3 Crane
3.3.1 The straightness and spacing of the track meet the process requirements, and the suspended track must be firm and reliable. 3.3.2 The wire rope or sleeve chain is not seriously rusted or worn. 3.3.3 The guide chute and guide pulley of the hook are not seriously worn, and the hanging part of the pole is in good contact with the hook head. 3.4 Transmission system
3.4.1 The transmission system runs smoothly, without impact and abnormal noise. 3.4.2 The reducer, transmission shaft and coupling are not loose or moving. 3.5 Control system
3.5.1 The program control is correct, the performance is stable, and the working condition is good. 3.5.2 The brake and limit device are sensitive and reliable. 3.5.3 The power control is complete, and the connection between pipes, joints and valves is firm and sealed. 3.6 Electrical system
3.6.1 The operation of the rectifier is as follows: the indication of various instruments is correct, the error is within the tolerance range, and the instruments are within the valid calibration period. 3.6.2 The electrical equipment is complete, the lines are neatly arranged, the performance is good, and the operation is reliable. 3.6.3 The electrode contact is good, without serious damage: Approved by the Ministry of Electronics Industry of the People's Republic of China in 1994-0415 and implemented on June 1, 1994
3.7 Lubrication system
3.7.1 The lubrication device is complete and works well. SI/T 31050—94
3.7.2 The oil nozzle, oil cup, and oil eye shall not be missing, damaged, or blocked, and the injected lubricating oil or oil finger shall be clean and in place. 3.8 Safety protection device
3.8.1 The safety protection device is complete and reliable. 3.8.2 The sewage discharge shall comply with the provisions of GB8978-88 "Comprehensive Sewage Discharge Standard\1.1.3". Sewage discharged into the waters of this area shall comply with the secondary standard.
3.9 Maintenance
3.9.1 The equipment shall be clean inside and outside, and there shall be no dirty liquid on the ground. 3.9.2 Others shall be carried out in accordance with SJ/T31002-94 "General Rules for Equipment Maintenance". 4 Inspection and Assessment Methods
4.1 Inspection Methods
3.8.2 of this standard shall be inspected by the environmental protection department, and the rest shall be inspected by subjective methods. 4.2 Assessment Methods
4.2.1 3.1, 3.2.1, 3.3.1, 3.5.1, 3.6.1, 3.8.1, and 3.8.2 of this standard are the main items, and the rest are minor items.
4.2.2 If one of the main items does not meet the requirements, it is an incomplete equipment; if two of the minor items do not meet the requirements, it is also an incomplete equipment.
Additional Notes:
This standard was proposed by the Department of Economic Operation and System Reform of the Ministry of Electronics Industry. This standard was drafted by Nanjing Huaning Electronic Technology Research Institute. The main drafter of this standard: Ge Zhongmin.
TYKAONKACa-
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.