HG 20557.5-1993 Process System Professional Engineering Design Data Management Method

Basic Information

Standard ID: HG 20557.5-1993

Standard Name: Process System Professional Engineering Design Data Management Method

Chinese Name: 工艺系统专业工程设计资料管理办法

Standard category:Chemical industry standards (HG)

state:in force

Date of Release1994-08-03

Date of Implementation:1996-03-01

standard classification number

Standard ICS number:71.010

Standard Classification Number:>>>>P7 Chemical Industry>>Comprehensive Chemical Industry>>G04 Basic Standards and General Methods

associated standards

Publication information

other information

Introduction to standards:

HG 20557.5-1993 Process System Professional Engineering Design Data Management Method HG20557.5-1993 Standard Download Decompression Password: www.bzxz.net

Some standard content:

Industry Standards of the People's Republic of China
Regulations on the Management of Process System Design
HG20557-93
Editor: Process System Design Technology Center of the Ministry of Chemical Industry Approval Department: Ministry of Chemical Industry
Implementation Date: October 1994
Chemical Engineering Design Standards Editing Center
1994 Beijing
Management Methods for Professional Engineering Design Data of Process System HG20557.5-93
Compiler: China Chengda Chemical Engineering Company Approval Department: Ministry of Chemical Industry
Implementation Date: January 1, 1999 1.1 Purpose
1 General Principles
In order to standardize the management of engineering design data, each engineering design data shall be managed in the following manner so that users can easily find the required data. 1.0.2 Responsibilities
The person in charge of this specialty shall be responsible for collating, compiling and maintaining the project planning data, or he shall designate someone to undertake this work until the design is completed.
1.0.3 Only the latest version of the data should be saved in the archives. The new version of the data should be marked with the "record version". If there is any modification, the "record version" should be marked with a "red mark" in red. 1.0.4 The data release sheet should be attached to the front of the materials and drawings as a directory: 71
2 Management methods
2.0.1 Archives Fire\14\---Process data and data issued by relevant professionals in the company (institute) 2.0.1.1 Flow chart, process manual, material balance sheet. 2. 0. 1. 2
Equipment table.
2. Non-1.3 Industrial furnace data sheet (B US). 2.0.1.4
Heat exchanger data sheet (C category).
Reaction vessel data sheet (class (class).
Tower data sheet (internal category).
2. 0. 1. 7
Data sheet for cans (F category).
Data sheet for low compression machines and flexible products (J category).
: 2. 0, 1. 9
Data sheet for special equipment (red category),
2. 0.1.10 Operating principles.
2..1.11 Material preparation.
Note: The data measured in 2.0.1.1~.2.0.1.9 are received when the process is published, and the rest are received after the process is published. 2..2 File Shuang "B\一利过程数接". The order of the data items should be consistent with the file folder \IA\2.0.3 File category \2" - Company (Institute> Internal departments, professional documents, letters 2.03. Received documents, letters.
2.0.3.2 Documents and loans issued by this profession Note: (1) Under normal circumstances, the professional leader will review the received documents and send them to the main project leader, and then read them among the relevant personnel.
(2) Documents and letters should be arranged in order from the farthest to the nearest according to the date of issuance. 2.0.4 Archive Center "3" Public 2.0.4.1 Received documents, official documents, and letters from the company (institute) to other departments: Note: Same as the note in 2.0.3. 2.0.5 File rate "4\--Minutes of meeting
2.0.5.1 Minutes of internal meetings of the company (institute); 2.0.5.2 Minutes of meetings between the company (institute) and external units, such as manufacturing, user technology (or patent>ownership). 2.0. Release folder 5\-Project related information 2. 0.6.1 List of project management personnel. 72
2.0.6.2 Monthly report of the project.
2.0.6.3 Required explanation
2.0.6.4 Basic data of engineering design.
2.1.6,3 Complete the coordination procedure.
Design contract and commencement report:
2. Industry. 7 category files\G core\various specifications
2.0.7.1: ± category (A category).
2.0.7.2 Industrial category (B category)
2.0.7.3 Heat exchange micro-category (C category).
2.0.7.4 Reactor category (D category), device category (E category). Extraction tank category (F category)). 2. 0.7.5
Maintenance and pumps (Class).
Special equipment (Class L).
Pipes (Class M).
2.0, 7, 7
Electrical appliances (Class N).
Instruments (Class).
2.0.7.10Paint and heat insulation (Class F)
2..*Files\7*-1. Special effects clothes
All kinds of data related to this profession, including purchase notices and drawings of various equipment.
2. 0. 9. 1
Industrial furnace data with public material data sheet (Class). Dyeing heat protection data sheet and assembly drawing (Class C') 2. 0.8. 2
2.0.8.3 Analysis of inquiry drawings and manufacturing drawings (assembly drawings> data (D category), 2. 0. 8. 4
Compressor and case purchase notice and manufacturing data (factory category). 2. 0. 8. 5
Special equipment purchase notice and manufacturer data drawings (factory category). Instrument purchase notice and manufacturer data table (O category). 2. 0. 8.
Special pipe fittings selection data and drawings.
2. 0.8. 7
0.8.8 Customer valve manufacturer data, drawings: steam drain chest and gas class water Teng manufacturer data. 2.0.8.9
2.08.10 Pipe wall sequence table.
2. 0. 8. 11 Pipe material grade table.
2.0.9 Archive fire \8\——selection, labor time control and also 2.0.9.1 The standard degree table of this profession.
.0.9.2 Detailed table and 5 curves of labor time calculation. 2. 0, 9. 31
Design labor time budget modification requirements.
Drawing modification notice section.
2.0.9.5 Summary table of pending items.
1.00 Various calculations of "9"
2. 0.10. 2
2. 0.10.3
2. 0. I treatment. 4
2, . 1 row, 5
2. 0. 10. 9
Pipeline hydraulic calculation.
Calculation of compressor pressure difference and pump pressure 2 and NS calculation, control valve and flow meter calculation:
Safety valve calculation. www.bzxz.net
Calculation of safety valve inlet pipe diameter and discharge system. Calculation of flow limiting orifice:
Calculation of dry blanket sheet.
Calculation table of pipe wall thickness.
Calculation of insulation thickness (calculation of equipment insulation accompanying pipe length). 2.0.10.10 Other various calculations
Professional responsible persons can be divided into appropriate parts according to needs. File folder\1 core
Various summary tables, data tables
2.0. 11. 1
Equipment elevation and pump NPSH table:
2. 0. 11. 2
2.0.11. 4
Compressor condition table.
Tight data summary table,
Heater connection summary table.
Reactor connection summary table.
2.0, 11.5
2.0.11.6Tower connection summary table.
2, 0. 11. 7
Trough connection summary table.
Industrial furnace connection summary table.
2. 4. 11. K
2. 0. 11. 9
Special equipment connection summary table.
2. 0. 11. 10
Special replacement parts effect table.
2. 0.11,11 Safety equipment procurement data summary table, 2. 0. 11. 12
2.0.11.13
2. U. 11. 14
Delivery fragment procurement data hole summary table:
Control valve special combustion rack and flow level type pipeline design requirements summary table. Neck water valve procurement data summary table.
2. 0. 11. 15
Equipment insulation and heat preservation conditions summary table.
Boundary area tea parts table:
2. 0. 11. 16
Drawing material delivery list.
2.0.11. 17
Folder "11
Balance and calculation of utility materials and auxiliary materials 2.0.12
Steam generation, steam distribution and condensate system balance. 2. 0. 12. 1
2.0.12.2Cooling water balance.
2.0.12.3 Balance or calculation of auxiliary materials such as air and cylinder gas. Calculation of boundary connection conditions.
3 Management of drawings and pipe naming tables
3.0.1 Each version of the P drawing and pipe naming table should be marked with the "verification version" mark on the set of drawings. All modifications should be marked with the "color code" on the drawings. 3.0.2 After the construction version of the user drawing and naming table is published, the previous versions of the "record version" of the drawings and naming changes will be used as the basis for the revision of the budget, and the "record version" with user opinions will be retained as the basis for the budget estimate. 76
4 File folders retained after the device has been accepted by the user 4.0.1 The following files are kept in the professional group 4.0.1.1 File folder "9" - various calculation books. 4.0.1.2 File folder "10\ - various gift summary tables. 4..1.3 File folder "11\- Public materials auxiliary material balance tear and calculation section 4..1.4 A set of the latest version of FI drawings and name lists. 4.0.2 PI manuscripts and pipeline naming table manuscripts are saved by the base map library. All other documents are for reference.
5 Finished pipeline instrument reduction diagram G version (construction version) compiled during the process system professional engineering design phase. 5. 1
5.0.2 Pipe invitation naming table G version.
Flow limiting orifice summary table.
Safety collection and avoidance data table,
Trap procurement data table.
Flame rupture procurement data table.
Special pipe fittings data table (I) (III) Special narrow fittings summary table.
Map spot log.
Boundary area condition category (construction version) - such as zero needs,