Basic Information

Standard ID: GB 15563-1995

Standard Name: Seismic source grain

Chinese Name: 震源药柱

Standard category:National Standard (GB)

state:Abolished

Date of Release1995-05-15

Date of Implementation:1996-01-01

Date of Expiration:2006-08-01

standard classification number

Standard ICS number:Chemical Technology>>Chemical Products>>71.100.30 Explosives and Pyrotechnics

Standard Classification Number:Chemical Industry>>Other Chemical Products>>G89 Pyrotechnic Products

associated standards

alternative situation:Replaced by GB 15563-2005

Publication information

publishing house:China Standard Press

other information

Review date:2004-10-14

Drafting unit:Shanxi Jiangyang Chemical Plant

Focal point unit:commission of science, technology and industry for national defense

Publishing department:State Bureau of Technical Supervision

competent authority:commission of science, technology and industry for national defense

Introduction to standards:

This standard specifies the technical requirements, test methods, inspection rules and marking, packaging, transportation, storage, etc. of seismic source grains. This standard is applicable to the production and acceptance of seismic source explosives with ammonium ladder explosives and colloidal explosives as the main charges. GB 15563-1995 Seismic Source Pillar GB15563-1995 Standard download and decompression password: www.bzxz.net

Some standard content:

National Standard of the People's Republic of China
Shock
Source
Medicine
Seismic explosive columns
Subject content and scope of application
Column||tt ||GB 15563—1995
This standard specifies the technical requirements, test methods, inspection rules and marking, packaging, transportation, storage, etc. of seismic source grains. This standard is applicable to the production and acceptance of seismic source explosives with ammonium ladder explosives and colloidal explosives as the main charges. 2 Reference Standards
GB190 Dangerous Goods Packaging Marks
GB6543 Corrugated Boxes
GB 6722
Explosion Safety Regulations
GB12463 General Technical Conditions for Transport and Packaging of Dangerous Goods GB /T13228 Determination method of explosion velocity of industrial explosives 3 Product code
3.1 The product code of Tingyuan grain column consists of basic parts such as product name, specification and density series code. 3.2 The product name is represented by the first letter (ZY) of the Chinese pinyin of "Tingyuan". 3.3 Specifications include product diameter and powder charge. The diameter is expressed in millimeters and the powder charge is expressed in kilograms. 3.4 Density series codes are represented by the Chinese pinyin letters G (high), Z (medium), and D (low). 3.5 When the source grain cannot be used at 40°C, the lowest applicable temperature should be indicated after the density series code. 3.6 For special-purpose Tingyuan grain columns, they should be marked with a capital letter in front of \ZY", and the letter should be determined when the product is finalized. 3.7 Product code example:
a
The product diameter is Product code of high-density series seismic source grain 85mm with a charge capacity of 2kg: ZY 85-2 - GwwW.bzxz.Net
Density series code
Specification code
Product name code||tt ||b. The product diameter is 85mm, the charge capacity is 2kg, high density series, special source charge column, the minimum applicable temperature is -20℃, its product code:
State Bureau of Technical Supervision 1995-05-15 Approved for implementation on 1996-01-01
781
X-ZY85-2-G--20
Technical requirements
4
4.1 Performance indicators| |tt||GB15563
Minimum applicable temperature
Special code
The performance indicators of the source grain should meet the requirements of Table 1. Table 1
Charge density.g/cm2
Hydro pressure resistance test
Connection force, N
Explosion completeness
Detonation continuity, kg
High Low temperature explosion completeness
Drop test
Explosion velocity.m/s
Guarantee period, a
4.2 charge
65mm
60
≥6
G
1995
gauge
>$65 mm
≥1.40
grid||tt| |Z
≥1. 20~1. 40
Complete explosion
98
Complete explosion
≥10
Complete explosion| |tt||Non-combustible and non-explosive
≥5 000
2
The charge quantity of the seismic source column should meet the requirements of Table 2. Charge quantity
Charge quantity tolerance| |tt||4.3 Appearance requirements
500
±20
1000
±30
Table 2
2000||tt| |±40
≥4 000
1
2 500
±45
3000
±50
D
≥1. 00~1. 20
≥3 500
5000
±70
g
4.3.1 Seismic source medicine The surface of the column should be smooth, free of leaks, no residue, and clearly marked. The quality of the glue seal should be in good condition.
4.3.2 The color of the shell should be determined according to the main charge density. Use three colors: blue (high density), red (medium density), and yellow (low density). Test method
5
5.1 Determination of main charge density
Randomly extract the shells used for the same batch of seismic source charge columns, weigh the mass of the shells first, and then inject into the shells Bring normal temperature water to the lower edge of the positioning groove and measure the volume of injected water. This volume is the shell volume. Use a shell with a known volume to charge the powder to the lower edge of the positioning groove and measure its mass. Calculate the density of the seismic source charge column:
782
where: - charge density of the seismic source charge column, g/cm2; V shell volume, cm\;
shell mass , g;
mi --
mass after charging·g.
ma
5.2 Explosion velocity determination
GB15563--1995
m2
The explosion velocity of the source charge column should be measured according to GB/T13228. 5.3 Explosion integrity test
5.3.1 Explosive equipment
V
my
No. 8 exploration electric detonator. During the ground detonation test, No. 8 (metal shell) industrial electric detonator can be used. I,
h.
detonator and wire.
5.3.2 Test procedure
a.
b.
c.
Place the sample, detonator, wire and detonator on the test site ; Before connecting the wires, the detonation system should be checked to ensure that it is working properly, and after the connection, check to ensure that the connection is correct; insert the detonator into the sample, and the detonator must be in place. Then conduct ground detonation. Be observed. The safety requirements of the operation process shall be implemented in accordance with GB6722. 5.3.3 Evaluation of test results
After detonation, the sound, smoke and presence or absence of residual chemicals on site will be used to determine whether the explosion is complete. 5.4 Detonation continuity test
Take the number of samples specified in Table 1 as a group, connect the samples in place, insert an electric detonator at the detonation end to detonate. The remaining requirements shall be implemented in accordance with Article 5.3.
5.5 Water pressure resistance test
5.5.1 Equipment
a.
Water pressure resistance test vessel, the test vessel is required to ensure the use pressure and safety; pressure gauge, The measurement accuracy is not less than level 1.5
b.
5.5.2 Test procedure
(1)
Put the sample into the test container for water pressure resistance test , the gauge pressure is 0.294MPa, and the pressure holding time is 48h. After taking it out, the explosion integrity test is carried out according to the provisions of Article 5.3.
5.6 High and low temperature explosion integrity test
5.6.1 Equipment
High temperature certificate;
a,
low temperature box. | |tt | The provisions of Article 5.3 shall be implemented. Tingyuan grain columns that cannot be used under the condition of -40℃ should be insulated according to the lowest applicable temperature. 5.7 Drop test
5.7.1 Suspension device
The suspension height is 6m, and the sample can be allowed to fall freely after being suspended. 5.7.2 Test conditions
The test site should be on a hard soil surface without stones. 5.7.3 Test procedure
Hang the sample on the suspension device. The vertical height of the lower end of the sample from the ground is 6m, and let it fall freely. Observe whether it burns783
or explodes after landing.
5.8 Connection force test
5.8.1 Suspension device
GB15563-1995
The height of the device should ensure that the specimen is suspended and the height of the suspension device is about Appropriate height. 5.8.2 Test procedure
Connect the two sections of the sample in place and hang them on the test device. The lower section is hoisted with a weight. The gravity of the heavy bowl should comply with the provisions of Table 1. The hanging time is 30 minutes. Observe the two sections. Whether the specimen connection is pulled apart. 5.9 Inspection of charge quantity
Weigh with a weighing instrument with a capacity of no more than 5g. The quantity of medicine should comply with the provisions of Table 2. 6 Inspection Rules
6.1 Inspection Categories
Inspection is divided into type inspection and factory inspection. 6.2 Type inspection
6.2.1 Timing of type inspection
Type inspection shall be carried out when one of the following situations occurs: a.
New product trial production and identification;
b.
When there are major changes in product structure, materials, and processes after formal production, which may affect product performance; when the product has been suspended for more than one year and is resumed; when the national quality supervision agency proposes type inspection requirements. d.
6.2.2 Type inspection items
Type inspection items are shown in Table 3.
Table 3
Sequence
No.
1
2
3
4
5| |tt||6
7
8
9
10
Inspection item name
Appearance inspection
Assembly Charge inspection
Main charge density determination
Water pressure resistance test
Connection strength test
Explosion completeness test
Detonation continuity test| |tt||High and low temperature explosion integrity test
Drop test
Explosion velocity determination
6.2.3 Sampling and judgment of type inspection
6.2.3.1 Appearance and charge Quantity inspection
Type inspection items
V
V
V
Dehuang inspection items
V
Appearance and The charge quantity should be fully inspected. The appearance meets the requirements of Article 4.3 to be qualified. If the charge quantity meets the requirements of Table 2, it is qualified. 6.2.3.2 Water pressure resistance test
Randomly select 10 sections from each trial production batch and conduct the test according to the requirements of 5.5. If all explosions are complete, it will be qualified. If there is an incomplete explosion in one section, the test shall be repeated with double the number (20 sections). During the retest, all explosions will be complete, otherwise it will be unqualified. 6.2.3.3 Connection force inspection
784
GB15563-1995
Randomly select 4 sections (divided into two groups) from each trial production batch and conduct inspection according to the provisions of Article 5.8. If all are not pulled out, it will be considered as qualified. If one group is pulled out, the test will be repeated with double the number (8 sections). During the retest, if all are not pulled out, it will be considered as qualified. Otherwise, it will be unqualified. 6.2.3.4 Explosion completeness test
Randomly select 10 sections from each trial production batch and conduct the test according to the provisions of Article 5.3. All explosions are deemed to be qualified. If one section explodes incompletely, the test should be repeated with double the number (20 sections). During the retest, all explosions will be considered qualified, otherwise it will be deemed unqualified. 6.2.3.5 Density measurement of the main charge
Randomly select 10 sections from each trial production batch and measure them according to the provisions of Article 5.1. If all meet the requirements of Table 1, they are qualified. If the density of one section does not meet the requirements, The retest should be carried out with double the number (20 knots). During the retest, if all the density meets the requirements, it will be deemed as qualified, otherwise it will be deemed as unqualified. 6.2.3.6 Detonation velocity measurement
Randomly sample samples from each trial production batch and measure according to the provisions of 5.2. The explosion velocity meets the requirements in Table 1 to be qualified. 6.2.3.7 Detonation continuity test
Take the dosage specified in Table 1 as a group of samples, randomly select three groups from each trial production batch, and conduct the test according to the provisions of Articles 5 and 4. All three groups will explode. Completely qualified, otherwise unqualified.
6.2.3.8 High and low temperature explosion integrity test
Randomly select 10 sections (divided into two groups) from each trial production batch, and conduct high temperature and low temperature explosion integrity tests respectively according to the provisions of Article 5.6. Make the judgment according to Article 6.2.3.4.
6.2.3.9 Drop test
Randomly select 10 sections from each test batch and conduct the test according to the provisions of Article 5.7. If they are all non-combustible and non-explosive, they are qualified, otherwise they are unqualified. 6.3 Factory inspection
Before normal production products leave the factory, factory inspection shall be carried out according to the items specified in Table 3. 6.3.1 Batch grouping
Group products of the same series and specifications into one batch. The batch size should generally not be larger than 20t. Products are inspected by the quality inspection department of the manufacturer, and inspections are conducted on a batch-by-batch basis. The quality inspection certificate should be attached when leaving the factory. 6.3.2 Sampling and determination of factory inspection
6.3.2.1 Appearance inspection
The appearance is fully inspected during the production process, and it is qualified if it meets the requirements of 4.3. 6.3.2.2 Water pressure resistance test
During normal production, 5 sections are selected from the first batch of monthly production and tested according to the provisions of Article 5.5. Make the judgment according to Article 6.2.3.2. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If a representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will resume batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
6.3.2.3 Charge quantity inspection
Randomly select 10 sections from each batch and conduct inspection according to the provisions of Article 5.9. All products that meet the requirements in Table 2 are considered qualified. If the dosage of one section is unqualified, a retest should be conducted with double the quantity (10 sections). During the retest, the dosage will be considered qualified if all the dosage meets the requirements, otherwise it will be deemed unqualified. 6.3.2.4 Determination of main charge density
Randomly select 10 sections from each batch and measure according to the provisions of Article 5.1. All requirements in Table 1 are considered qualified. If the density of one section does not meet the requirements, the test should be repeated with double the number (20 sections). During the retest, the density will be deemed to be qualified if all the density meets the requirements, otherwise it will be deemed unqualified. 6.3.2.5 Explosion completeness test
Select 5 sections from each batch and conduct the test according to the provisions of Article 5.3. All explosions are completely qualified. If one section explodes incompletely, the test should be repeated with double the number (10 sections), and all explosions will be considered qualified. Otherwise it is unqualified. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If the representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will be resumed batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
785
GB15563—1995
Explosion integrity test shall be conducted at least once a month. It is allowed to be combined with the water pressure resistance test.
If the detonator fails to explode due to the quality or assembly of the detonator, the same quantity should be retested. 6.3.2.6 Connection force inspection
Select 4 sections (divided into two groups) from any batch produced every month and conduct inspection according to the provisions of Article 5.8. Make the judgment according to Article 6.2.3.3. 7 Marking, packaging, transportation and storage
7.1 Marking
The marking on the surface of each packaging box should be clear and correct. Content includes: a.
h.
c.
d.
e.
f.
g||tt| |h.
i.
Manufacturer name;
Product name;
Product code:
Trademark;
Manufacturing date and Batch number,
Net weight;
Total weight:
Packing box dimensions;
"Afraid of heat, moisture, handle with care, handle with care", "Do not touch detonators Coexistence" words; explosives signs comply with GB190.
7.2 Packaging
Packed in corrugated boxes. Corrugated boxes should comply with the regulations of GB6543. Net weight should not exceed 25kg. The packages should not be damaged and should be tied firmly. The remaining requirements shall comply with the provisions of GB12463. 7.3 Transportation
shall comply with the "Regulations of the People's Republic of China on the Management of Civilian Explosives". 7.4 Storage
Tingyuan drug column must be stored in a well-ventilated and dry warehouse. The deposit period should not exceed the guarantee period specified in Table 1. Additional notes:
This standard is proposed by China Ordnance Industry Corporation. This standard is under the jurisdiction of the China Ordnance Industry Standardization Research Institute. This standard is drafted by Shanxi Jiangyang Chemical Factory. The main drafters of this standard are Wang Xiulan, Guo Yuandan and Tan Xinghua. 786
3 requirements are met. If the charge quantity meets the requirements of Table 2, it is qualified. 6.2.3.2 Water pressure resistance test
Randomly select 10 sections from each trial production batch and conduct the test according to the requirements of 5.5. If all explosions are complete, it will be qualified. If there is an incomplete explosion in one section, the test shall be repeated with double the number (20 sections). During the retest, all explosions will be complete, otherwise it will be unqualified. 6.2.3.3 Connection force inspection
784
GB15563-1995
Randomly select 4 sections (divided into two groups) from each trial production batch and conduct inspection according to the provisions of Article 5.8. If all are not pulled out, it will be considered as qualified. If one group is pulled out, the test will be retested with double the number (8 sections). During the retest, if all are not pulled out, it will be considered as qualified. Otherwise, it will be unqualified. 6.2.3.4 Explosion completeness test
Randomly select 10 sections from each trial production batch and conduct the test according to the provisions of Article 5.3. All explosions are deemed to be qualified. If one section explodes incompletely, the test should be repeated with double the number (20 sections). During the retest, all explosions will be considered qualified, otherwise it will be deemed unqualified. 6.2.3.5 Density measurement of the main charge
Randomly select 10 sections from each trial production batch and measure them according to the provisions of Article 5.1. If all meet the requirements of Table 1, they are qualified. If the density of one section does not meet the requirements, The retest should be carried out with double the number (20 knots). During the retest, if all the density meets the requirements, it will be deemed as qualified, otherwise it will be deemed as unqualified. 6.2.3.6 Detonation velocity measurement
Randomly sample samples from each trial production batch and measure according to the provisions of 5.2. The explosion velocity meets the requirements in Table 1 to be qualified. 6.2.3.7 Detonation continuity test
Take the dosage specified in Table 1 as a group of samples, randomly select three groups from each trial production batch, and conduct the test according to the provisions of Articles 5 and 4. All three groups will explode. Completely qualified, otherwise unqualified.
6.2.3.8 High and low temperature explosion integrity test
Randomly select 10 sections (divided into two groups) from each trial production batch, and conduct high temperature and low temperature explosion integrity tests respectively according to the provisions of Article 5.6. Make the judgment according to Article 6.2.3.4.
6.2.3.9 Drop test
Randomly select 10 sections from each test batch and conduct the test according to the provisions of Article 5.7. If they are all non-combustible and non-explosive, they are qualified, otherwise they are unqualified. 6.3 Factory inspection
Before normal production products leave the factory, factory inspection shall be carried out according to the items specified in Table 3. 6.3.1 Batch grouping
Group products of the same series and specifications into one batch. The batch size should generally not be larger than 20t. Products are inspected by the quality inspection department of the manufacturer, and inspections are conducted on a batch-by-batch basis. The quality inspection certificate should be attached when leaving the factory. 6.3.2 Sampling and determination of factory inspection
6.3.2.1 Appearance inspection
The appearance is fully inspected during the production process, and it is qualified if it meets the requirements of 4.3. 6.3.2.2 Water pressure resistance test
During normal production, 5 sections are selected from the first batch of monthly production and tested according to the provisions of Article 5.5. Make the judgment according to Article 6.2.3.2. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If a representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will resume batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
6.3.2.3 Charge quantity inspection
Randomly select 10 sections from each batch and conduct inspection according to the provisions of Article 5.9. All products that meet the requirements in Table 2 are considered qualified. If the dosage of one section is unqualified, a retest should be conducted with double the quantity (10 sections). During the retest, the dosage will be considered qualified if all the dosage meets the requirements, otherwise it will be deemed unqualified. 6.3.2.4 Determination of main charge density
Randomly select 10 sections from each batch and measure according to the provisions of Article 5.1. All requirements in Table 1 are considered qualified. If the density of one section does not meet the requirements, the test should be repeated with double the number (20 sections). During the retest, the density will be deemed to be qualified if all the density meets the requirements, otherwise it will be deemed unqualified. 6.3.2.5 Explosion completeness test
Select 5 sections from each batch and conduct the test according to the provisions of Article 5.3. All explosions are completely qualified. If one section explodes incompletely, the test should be repeated with double the number (10 sections), and all explosions will be considered qualified. Otherwise it is unqualified. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If the representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will be resumed batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
785
GB15563—1995
Explosion integrity test shall be conducted at least once a month. It is allowed to be combined with the water pressure resistance test.
If the detonator fails to explode due to the quality or assembly of the detonator, the same quantity should be retested. 6.3.2.6 Connection force inspection
Select 4 sections (divided into two groups) from any batch produced every month and conduct inspection according to the provisions of Article 5.8. Make the judgment according to Article 6.2.3.3. 7 Marking, packaging, transportation and storage
7.1 Marking
The marking on the surface of each packaging box should be clear and correct. Content includes: a.
h.
c.
d.
e.
f.
g||tt| |h.
i.
Manufacturer name;
Product name;
Product code:
Trademark;
Manufacturing date and Batch number,
Net weight;
Total weight:
Packing box dimensions;
"Afraid of heat, moisture, handle with care, handle with care", "Do not touch detonators Coexistence" words; explosives signs comply with GB190.
7.2 Packaging
Packed in corrugated boxes. Corrugated boxes should comply with the regulations of GB6543. Net weight should not exceed 25kg. The packages should not be damaged and should be tied firmly. The remaining requirements shall comply with the provisions of GB12463. 7.3 Transportation
shall comply with the "Regulations of the People's Republic of China on the Management of Civilian Explosives". 7.4 Storage
Tingyuan drug column must be stored in a well-ventilated and dry warehouse. The deposit period should not exceed the guarantee period specified in Table 1. Additional notes:
This standard is proposed by China Ordnance Industry Corporation. This standard is under the jurisdiction of China Ordnance Industry Standardization Research Institute. This standard is drafted by Shanxi Jiangyang Chemical Factory. The main drafters of this standard are Wang Xiulan, Guo Yuandan and Tan Xinghua. 786
3 requirements are met. If the charge quantity meets the requirements of Table 2, it is qualified. 6.2.3.2 Water pressure resistance test
Randomly select 10 sections from each trial production batch and conduct the test according to the requirements of 5.5. If all explosions are complete, it will be qualified. If there is an incomplete explosion in one section, the test shall be repeated with double the number (20 sections). During the retest, all explosions will be complete, otherwise it will be unqualified. 6.2.3.3 Connection force inspection
784
GB15563-1995
Randomly select 4 sections (divided into two groups) from each trial production batch and conduct inspection according to the provisions of Article 5.8. If all are not pulled out, it will be considered as qualified. If one group is pulled out, the test will be repeated with double the number (8 sections). During the retest, if all are not pulled out, it will be considered as qualified. Otherwise, it will be unqualified. 6.2.3.4 Explosion completeness test
Randomly select 10 sections from each trial production batch and conduct the test according to the provisions of Article 5.3. All explosions are deemed to be qualified. If one section explodes incompletely, the test should be repeated with double the number (20 sections). During the retest, all explosions will be considered qualified, otherwise it will be deemed unqualified. 6.2.3.5 Density measurement of the main charge
Randomly select 10 sections from each trial production batch and measure them according to the provisions of Article 5.1. If all meet the requirements of Table 1, they are qualified. If the density of one section does not meet the requirements, The retest should be carried out with double the number (20 knots). During the retest, if all the density meets the requirements, it will be deemed as qualified, otherwise it will be deemed as unqualified. 6.2.3.6 Detonation velocity measurement
Randomly sample samples from each trial production batch and measure according to the provisions of 5.2. The explosion velocity meets the requirements in Table 1 to be qualified. 6.2.3.7 Detonation continuity test
Take the dosage specified in Table 1 as a group of samples, randomly select three groups from each trial production batch, and conduct the test according to the provisions of Articles 5 and 4. All three groups will explode. Completely qualified, otherwise unqualified.
6.2.3.8 High and low temperature explosion integrity test
Randomly select 10 sections (divided into two groups) from each trial production batch, and conduct high temperature and low temperature explosion integrity tests respectively according to the provisions of Article 5.6. Make the judgment according to Article 6.2.3.4.
6.2.3.9 Drop test
Randomly select 10 sections from each test batch and conduct the test according to the provisions of Article 5.7. If they are all non-combustible and non-explosive, they are qualified, otherwise they are unqualified. 6.3 Factory inspection
Before normal production products leave the factory, factory inspection shall be carried out according to the items specified in Table 3. 6.3.1 Batch group
Group products of the same series and specifications into one batch. The batch size should generally not be larger than 20t. Products are inspected by the quality inspection department of the manufacturer, and inspections are conducted on a batch-by-batch basis. The quality inspection certificate should be attached when leaving the factory. 6.3.2 Sampling and determination of factory inspection
6.3.2.1 Appearance inspection
The appearance is fully inspected during the production process, and it is qualified if it meets the requirements of 4.3. 6.3.2.2 Water pressure resistance test
During normal production, 5 sections are selected from the first batch of monthly production and tested according to the provisions of Article 5.5. Make the judgment according to Article 6.2.3.2. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If a representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will resume batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
6.3.2.3 Charge quantity inspection
Randomly select 10 sections from each batch and conduct inspection according to the provisions of Article 5.9. All products that meet the requirements in Table 2 are considered qualified. If the dosage of one section is unqualified, a retest should be conducted with double the quantity (10 sections). During the retest, the dosage will be considered qualified if all the dosage meets the requirements, otherwise it will be deemed unqualified. 6.3.2.4 Determination of main charge density
Randomly select 10 sections from each batch and measure according to the provisions of Article 5.1. All requirements in Table 1 are considered qualified. If the density of one section does not meet the requirements, the test should be repeated with double the number (20 sections). During the retest, the density will be deemed to be qualified if all the density meets the requirements, otherwise it will be deemed unqualified. 6.3.2.5 Explosion completeness test
Select 5 sections from each batch and conduct the test according to the provisions of Article 5.3. All explosions are completely qualified. If one section explodes incompletely, the test should be repeated with double the number (10 sections), and all explosions will be considered qualified. Otherwise it is unqualified. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If the representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will be resumed batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
785
GB15563—1995
Explosion integrity test shall be conducted at least once a month. It is allowed to be combined with the water pressure resistance test.
If the detonator fails to explode due to the quality or assembly of the detonator, the same quantity should be retested. 6.3.2.6 Connection force inspection
Select 4 sections (divided into two groups) from any batch produced every month and conduct inspection according to the provisions of Article 5.8. Make the judgment according to Article 6.2.3.3. 7 Marking, packaging, transportation and storage
7.1 Marking
The marking on the surface of each packaging box should be clear and correct. Content includes: a.
h.
c.
d.
e.
f.
g||tt| |h.
i.
Manufacturer name;
Product name;
Product code:
Trademark;
Manufacturing date and Batch number,
Net weight;
Total weight:
Packing box dimensions;
"Afraid of heat, moisture, handle with care, handle with care", "Do not touch detonators Coexistence" words; explosives signs comply with GB190.
7.2 Packaging
Packed in corrugated boxes. Corrugated boxes should comply with the regulations of GB6543. Net weight should not exceed 25kg. The packages should not be damaged and should be tied firmly. The remaining requirements shall comply with the provisions of GB12463. 7.3 Transportation
shall comply with the "Regulations of the People's Republic of China on the Management of Civilian Explosives". 7.4 Storage
Tingyuan drug column must be stored in a well-ventilated and dry warehouse. The deposit period should not exceed the guarantee period specified in Table 1. Additional notes:
This standard is proposed by China Ordnance Industry Corporation. This standard is under the jurisdiction of the China Ordnance Industry Standardization Research Institute. This standard is drafted by Shanxi Jiangyang Chemical Factory. The main drafters of this standard are Wang Xiulan, Guo Yuandan and Tan Xinghua. 786
2 Sampling and determination of factory inspection
6.3.2.1 Appearance inspection
The appearance is fully inspected during the production process, and it is qualified if it meets the requirements of Article 4.3. 6.3.2.2 Water pressure resistance test
During normal production, 5 sections are selected from the first batch of monthly production and tested according to the provisions of Article 5.5. Make the judgment according to Article 6.2.3.2. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If a representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will resume batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
6.3.2.3 Charge quantity inspection
Randomly select 10 sections from each batch and conduct inspection according to the provisions of Article 5.9. All products that meet the requirements in Table 2 are considered qualified. If the dosage of one section is unqualified, a retest should be conducted with double the quantity (10 sections). During the retest, the dosage will be considered qualified if all the dosage meets the requirements, otherwise it will be deemed unqualified. 6.3.2.4 Determination of main charge density
Randomly select 10 sections from each batch and measure according to the provisions of Article 5.1. All requirements in Table 1 are considered qualified. If the density of one section does not meet the requirements, the test should be repeated with double the number (20 sections). During the retest, the density will be deemed to be qualified if all the density meets the requirements, otherwise it will be deemed unqualified. 6.3.2.5 Explosion completeness test
Select 5 sections from each batch and conduct the test according to the provisions of Article 5.3. All explosions are completely qualified. If one section explodes incompletely, the test should be repeated with double the number (10 sections), and all explosions will be considered qualified. Otherwise it is unqualified. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If the representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will be resumed batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
785
GB15563—1995
Explosion integrity test shall be conducted at least once a month. It is allowed to be combined with the water pressure resistance test.
If the detonator fails to explode due to the quality or assembly of the detonator, the same quantity should be retested. 6.3.2.6 Connection force inspection
Select 4 sections (divided into two groups) from any batch produced every month and conduct inspection according to the provisions of Article 5.8. Make the judgment according to Article 6.2.3.3. 7 Marking, packaging, transportation and storage
7.1 Marking
The marking on the surface of each packaging box should be clear and correct. Content includes: a.
h.
c.
d.
e.
f.
g||tt| |h.
i.
Manufacturer name;
Product name;
Product code:
Trademark;
Manufacturing date and Batch number,
Net weight;
Total weight:
Packing box dimensions;
"Afraid of heat, moisture, handle with care, handle with care", "Do not touch detonators Coexistence" words; explosives markings comply with GB190.
7.2 Packing
Packed in corrugated cartons. Corrugated boxes should comply with the regulations of GB6543. Net weight should not exceed 25kg. The packages should not be damaged and should be tied firmly. The remaining requirements shall comply with the provisions of GB12463. 7.3 Transportation
shall comply with the "Regulations of the People's Republic of China on the Management of Civilian Explosives". 7.4 Storage
Tingyuan drug column must be stored in a well-ventilated and dry warehouse. The deposit period should not exceed the guarantee period specified in Table 1. Additional notes:
This standard is proposed by China Ordnance Industry Corporation. This standard is under the jurisdiction of the China Ordnance Industry Standardization Research Institute. This standard is drafted by Shanxi Jiangyang Chemical Factory. The main drafters of this standard are Wang Xiulan, Guo Yuandan and Tan Xinghua. 786
2 Sampling and determination of factory inspection
6.3.2.1 Appearance inspection
The appearance is fully inspected during the production process, and it is qualified if it meets the requirements of Article 4.3. 6.3.2.2 Water pressure resistance test
During normal production, 5 sections are selected from the first batch of monthly production and tested according to the provisions of Article 5.5. Make the judgment according to Article 6.2.3.2. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If a representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will resume batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
6.3.2.3 Charge quantity inspection
Randomly select 10 sections from each batch and conduct inspection according to the provisions of Article 5.9. All products that meet the requirements in Table 2 are considered qualified. If the dosage of one section is unqualified, a retest should be conducted with double the quantity (10 sections). During the retest, the dosage will be considered qualified if all the dosage meets the requirements, otherwise it will be deemed unqualified. 6.3.2.4 Determination of main charge density
Randomly select 10 sections from each batch and measure according to the provisions of Article 5.1. All requirements in Table 1 are considered qualified. If the density of one section does not meet the requirements, the test should be repeated with double the number (20 sections). During the retest, the density will be deemed to be qualified if all the density meets the requirements, otherwise it will be deemed unqualified. 6.3.2.5 Explosion completeness test
Select 5 sections from each batch and conduct the test according to the provisions of Article 5.3. All explosions are completely qualified. If one section explodes incompletely, the test should be repeated with double the number (10 sections), and all explosions will be considered qualified. Otherwise it is unqualified. If all 10 consecutive batches pass the initial test, one batch can be randomly tested every 5 batches, with the first batch of every 5 batches being the representative batch. If the representative batch fails both the initial test and the retest, the representative batch will be deemed unqualified and testing will be resumed batch by batch immediately. When all five consecutive batches pass the initial test, the test can be changed to one batch every five batches.
785
GB15563—1995
Explosion integrity test shall be conducted at least once a month. It is allowed to be combined with the water pressure resistance test.
If the detonator fails to explode due to the quality or assembly of the detonator, the same quantity should be retested. 6.3.2.6 Connection force inspection
Select 4 sections (divided into two groups) from any batch produced every month and conduct inspection according to the provisions of Article 5.8. Make the judgment according to Article 6.2.3.3. 7 Marking, packaging, transportation and storage
7.1 Marking
The marking on the surface of each packaging box should be clear and correct. Content includes: a.
h.
c.
d.
e.
f.
g||tt| |h.
i.
Manufacturer name;
Product name;
Product code:
Trademark;
Manufacturing date and Batch number,
Net weight;
Total weight:
Packing box dimensions;
"Afraid of heat, moisture, handle with care, handle with care", "Do not touch detonators Coexistence" words; explosives markings comply with GB190.
7.2 Packing
Packed in corrugated cartons. Corrugated boxes should comply with the regulations of GB6543. Net weight should not exceed 25kg. The packages should not be damaged and should be tied firmly. The remaining requirements shall comply with the provisions of GB12463. 7.3 Transportation
shall comply with the "Regulations of the People's Republic of China on the Management of Civilian Explosives". 7.4 Storage
Tingyuan drug column must be stored in a well-ventilated and dry warehouse. The deposit period should not exceed the guarantee period specified in Table 1. Additional notes:
This standard is proposed by China Ordnance Industry Corporation. This standard is under the jurisdiction of the China Ordnance Industry Standardization Research Institute. This standard is drafted by Shanxi Jiangyang Chemical Factory. The main drafters of this standard are Wang Xiulan, Guo Yuandan and Tan Xinghua. 786