Basic Information

Standard ID: HG 20557.2-1993

Standard Name: The relationship between process system discipline and other disciplines in various stages of engineering design

Chinese Name: 工艺系统专业在工程设计各阶段与其它专业的关系

Standard category:Chemical industry standards (HG)

state:in force

Date of Release1994-08-03

Date of Implementation:1996-03-01

standard classification number

Standard ICS number:71.010

Standard Classification Number:>>>>P7 Chemical Industry>>Comprehensive Chemical Industry>>G04 Basic Standards and General Methods

associated standards

Publication information

other information

Introduction to standards:

HG 20557.2-1993 The relationship between process system specialty and other specialties in each stage of engineering design HG20557.2-1993 standard download decompression password: www.bzxz.net

Some standard content:

Industry Standards of the People's Republic of China
Regulations on Process System Design Management
HG20557-93
Editing Unit: Process System Design Technology Center of the Ministry of Chemical Industry Approving Department: Ministry of Chemical Industry
Implementation Date: October 1994
Chemical Engineering Standards Editing Center
1994 Beijing
The relationship between process system specialty and other specialties in various stages of engineering design
HG20557.2-93
Compilation Unit: China Chengda Chemical Engineering Company Approving Department: Ministry of Chemical Industry
Implementation Date: October 1994 Acceptance conditions are shown in Table 1.0.1.
No.Proposed conditionsProfessional
Design principles
2Chemical process professional
Acceptance conditions
Acceptance documents
Document name
1.Start-up report number
2.Work plan basic data
3.Work safety design plan table
1.Process flow chart PF)
2.Material balance sheet
3.Proposed equipment mine plane, elevation and process dustproof required to set up public material stations and necessary safety spraying equipment and other positions
1.Process equipment table
15.Data table and micrograph of (tower) equipment5.Data table and schematic diagram of special equipment process
7.Detailed process effect table
8.Technology of jade machine, mosquito blower, etc. Data table 9. Heat exchanger process data table
10. Industrial furnace process data table (including industrial quick refining, and sparse diagram
11. Laboratory analysis parts table
12. Catalytic synthesis summary table, chemical synthesis summary table 13.1. Process description
1. Process control requirements (including: on-site detection, indication and control, etc.)
15. Monitoring of various equipment (such as, potential, penetration, changer, quality control device, industrial 9, special equipment, etc.) 16. Safety memorandum
17. Chemical process specialty, operation department’s start-up and shutdown instructions, start-up and shutdown public material usage and specifications 118. Special requirements for public materials (including, permanent. Electricity, steam, etc.)
Round trip relationship
Serial number Propose conditions Major
White control major|| tt||Equipment layout major
Light material major
Pipe material major
Parts major
Parts name
19. Physical property data required for process system professional calculation, such as: viscosity, density, particle size, surface tension, adiabatic index, etc., to humidity, etc.
2C. Calculation diagram (table) of relevant common materials in process production (steam, condensate, water, desalted water, water, gas and ammonia, etc.)
27. Operation principle and start-up plan, start-up and rate treatment
22. Refrigeration, ventilation, air conditioning, etc. in process production
23. Anti-technical risk memorandum (when necessary)
1. Process control (abbreviated as FC)
2 In towers, containers, changeover parts , special equipment, industrial equipment and other equipment
3. Complete set (matching> equipment, random instruments with limited supply range, special requirements for instrument length and instrument support 4. Equipped with a professional system to complete the various drawings. Provide 1~ core design drawings
1. Material base record
2. Pipe material identification diagram
1. Pipe material design regulations (general pipeline grade code description, pipeline material thermal classification index, pipeline material equivalent table, etc.
2. Insulation design regulations (insulation insulation number, insulation depth selection
3. Screen depth design regulations
4. Standardized special parts selection standards
1. Calculated pipe rate thickness (special requirements pipeline speed limit and explosion plateau, etc.
Round-trip relationship
Continued table 1.0. 1
Return equipment elevation
NPSH
2nd and 3rd editions
Production tax case major
Design major (including
1Container. Speaker
Heat exchanger, industrial
Furnace special equipment>
Heat exchanger analysis major ("[
Technology major)
Pump major
11Environmental protection major
Condition name
Equipment and data tables of each edition
Heat exchanger specifications
1. Estimated pump energy consumption summary table
. Steam turbine color load summary
3. Design of non-fixed pumps and analysis of pump structure
4. Machine system data sheet
5. Preparation and selection of preliminary confirmation of national paper data (ACF) and final research and development drawings (CF) environmental noise control requirements
social relationship
Status table 1.0.1
Supply process system major
According to the direct scale and
the effectiveness of each state industry route
it is necessary to deduce
the flow chart, operation limit and instant learning of the machine and other majors, and the automatic control industry must cooperate with the process system major to form a complete system, which needs to be provided
the conditions are shown in Table 2.0.1,
the conditions are shown in Table 2.0.1,
the conditions are shown in Table 2.0.2.
All versions of PI diagram and section plan are collected by chemical process. Equipment layout special piping naming table
Compression red condition table
Data summary table
Pump calculation table
Equipment elevation and system NPSH table
Container connection summary
: The table includes the process
System professional to add accompanying pipe strips on the equipment
? ! Pan changer manifold
R industrial furnace manifold
special equipment takeover
summary installation
pipe thickness data
industry. Pipe material science, body control, pipeline design, etc. mechanics (except PI diagram A, R version), construction department (G version), materials (B release) user (C, C version) pump major (except A version) machinery and other majors, finishing major, chemical process major, process major, pump major
machine system major
equipment layout major
chemical process major, container major Industry, equipment and installation, automatic control, pipeline design, pipe mechanics, etc.
Chemical process, heat exchanger, equipment production, automatic control, pipe design, pipeline mechanics, etc.
Chemical process, industrial furnace, equipment production, automatic control, pipeline design, pipe mechanics, etc.
Chemical process, special equipment, equipment layout, automatic control, pipeline design, pipeline mechanics, etc.
Pipeline mechanics, pipeline material, etc.
Table 2. 0. 1
Alcohol no time description supply
Conditions of each state
Safety question micro
Data summary table
12 Safety reading reaction force number
:3 Bursting piece sampling
-4 Control valve index
Connection condition major
Special equipment industry (according to demand), general material major, pipe design major, etc.
General pipeline mechanics industry, equipment major (according to demand: pipeline material major. Pipeline design major, equipment major (according to demand), etc.
Pipeline mechanics major, pipeline design major
East line type| |tt||Design requirements
Total of filter orifice plates
Water supply procurement quantity
Summary table
Special fittings
Summary of special pipe fittings
-Table
Pipe material major, pipeline design major, construction mechanics major, equipment major (connection needs), etc.
Snow material major, pipeline design major, construction major (technical needs), etc.
Road material major, pipeline design major (when necessary) pipeline material major, pipeline design major, etc. Thermal insulation
Pipe material major, container major.Heat exchanger major, condition summary table
design data table
installation world common materials
material system equipment
object engineering
data table and schematic diagram
installation pipe common materials
particle system control core
water change and other professional
industrial protection major, special equipment major, etc.
automatic control major
container major, heat exchanger major, special equipment major, pump major, pipeline design major, control major, etc. automatic control major design tools and other majors provided by chemical process major
design manager, chemical Engineering and technology majors, equipment layout and design majors, machinery and automation majors, water supply and drainage majors, hydraulic engineering majors, etc. User relations
Continuation table 2.0.1
When needed
Yao Technology System Construction Major
Responsibilities and engineering
Design stage services:
HG53653
321.1.15 SpecificationsbzxZ.net
When necessary·Pipeline
Design majors
Condition name
Public property
Material condition table
II. Unused drainage technology
Parts table
2. 3. Steam and condensation
Water pollution table
4. Compressed air,
Ammonia condition table
5. Refrigeration load conditions
6. Ventilation conditions
No thermal insulation
Standard state letter
26: Frequency control design
General requirements
And sound control team
Design requirements
Acceptance Professional
Public engineering majors
Water supply and drainage major
Chemical water treatment major
Heat treatment major
Air compression, air separation major
Refrigeration major
HVAC major
Pipeline material major
Design manager, pipeline design major. Automatic control major, pipeline material major, pipeline mechanics major, equipment lever pump major, environmental protection major and users
Round inspection
System table 2. 0. 1
Only provide or rotate
Slice salt has some work
Only condense and process related
Professional related parts
More information is provided when needed
You need it when you need it
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.