title>JB/T 1308.2-1999 PN250a Technical requirements for valves, fittings and fasteners - JB/T 1308.2-1999 - Chinese standardNet - bzxz.net
Home > JB > JB/T 1308.2-1999 PN250a Technical requirements for valves, fittings and fasteners
JB/T 1308.2-1999 PN250a Technical requirements for valves, fittings and fasteners

Basic Information

Standard ID: JB/T 1308.2-1999

Standard Name: PN250a Technical requirements for valves, fittings and fasteners

Chinese Name: PN250a 阀门、管件和紧固件 技术条件

Standard category:Machinery Industry Standard (JB)

state:in force

Date of Release1999-07-12

Date of Implementation:2000-01-01

standard classification number

Standard ICS number:Fluid Systems and General Parts >> 23.060 Valves

Standard Classification Number:Machinery>>General Parts>>J16 Valve

associated standards

alternative situation:JB 1309-1973

Publication information

other information

Focal point unit:National Valve Standardization Technical Committee

Publishing department:National Valve Standardization Technical Committee

Introduction to standards:

JB/T 1308.2-1999 This standard is a revision of JB 1309-73 "Technical requirements for valves, pipe fittings and fasteners of Pg (2500kgf/cm2)". This standard specifies the technical conditions for ultra-high pressure valves, pipe fittings and fasteners. This standard is applicable to valves, pipe fittings and fasteners for neutral media such as ethylene and polyethylene with a nominal pressure of 250MPa. This standard was first issued on 2009-08-1999. JB/T 1308.2-1999 Technical conditions for PN250a valves, pipe fittings and fasteners JB/T1308.2-1999 Standard download decompression password: www.bzxz.net

Some standard content:

1C.S 23.060
Machinery Industry Standard of the People's Republic of China
JB/T1308.1-1308,21-1999
PN250MPa ultrahigh pressure valves and fittings
Technical conditions
Speclfcations for PN 2S0 MPa ultrahighpressure valves and fittings1999-07-12Release
State Machinery Industry Bureau
2000-01-01Implementation
Machinery Industry Standard of the People's Republic of China
PN 250 MPa Valves, Fittings and Fasteners Technical Conditions
Specificuliuns fur Py 2so MPu valves, filings nd 1 Scope
This standard specifies the technical conditions for high-pressure valves, pipe fittings and fasteners JB/T1308.2-1999
IB1309-73
This standard is applicable to valves, pipe fittings and fasteners with a nominal pressure of PK250MPa, such as weak neutral media such as acetylene, etc. 2 Reference standards
The provisions contained in the following standards constitute the provisions of this standard by reference in other standards. When this standard is published, the versions indicated are valid. All standards will be revised and revised. Parties using this standard should explore the possibility of using the latest version of the following standards: GB/T 222-[984
GB:J223.1-1581
GB/T 223.2—1981
GBT223.31988
GB/T223.4
GT223.5—1997
Chemical analysis of steel--Test method for joint sample and allowable tolerances for chemical composition of finished products--Determination of carbon content in steel and alloys--Determination of sulfur content in steel and alloys--Determination of sulfur content in steel and alloys--Chemical analysis of steel and alloys--Determination of sulfur content by diantipyryl methane phosphoplatinic acid method--Chemical analysis of alloys--Determination of sulfur content by nitric acid molten salt oxidation volumetric method--Chemical analysis of iron and alloys--Determination of sulfur content by acid soluble aluminosilicate photometric method--Chemical analysis of alloys containing monotantalum by persulfate oxidation volumetric method R22.31[—1991
GB/T 223.16—1991
GB/T 223.2619Q4
GB/T 228—19B7
GBT 229—[984
GH/T 230—199]
GH/T 231—1984
GB/T699—1988
GB/T700—1988
GB /T1220--1992
GR/[9791980
GB/T2975-:[982
GB/T8163—1987
GB/T3077—1988
GB/T10561—1989|| tt||JB1061978
Methods for chemical analysis of iron and alloys; determination of color change by photometric method; determination of titanium pad number and alloy chemical analysis method; separation of three-component spectrophotometric method; metal pulling test method
Methods for impact test of gold brush ratio (U-shaped notch); Rockwell impact test method
Methods for testing the degree of gold uniformity
Technical conditions for high-quality carbon steel
Knock structure example
Stainless steel ladder||tt| |Structural steel low-magnification defect evaluation diagram
Steel mechanical design process performance test sampling regulations for the transmission performance of the vehicle pipe
Taiwan enterprise structural engineering technical conditions
Shooting non-enterprise exhibition of debris is a micro-assessment method
Reading door signs and identification paint
National Machinery Industry Bureau 1999.07-12 approved 2
2000-01-01 implementation
JB47261994
JB477 7.1994
JR4728-1994
JR4730-1994
3 Technical conditions
JB/1308.2—1999
Magnetic steel and low alloy forgings for small pressure vessels, carbon steel and low alloy forgings for pressure vessels, stainless steel forgings for pressure vessels
Pressure vessel non-standard inspection
3, 1 Measure the allowable E working pressure at different working temperatures! 1T working temperature
2G1-250
251-380
3.2 Materials and materials
3.2.1 Materials for parts shall not be subject to the requirements of the drawings, but after the test, the materials that can ensure the design requirements are allowed to be substituted. 3.2.2 Materials shall not have certificates of chemical composition and mechanical properties. If there is no certificate, chemical analysis and mechanical property inspection shall be carried out according to the current provisions of (GB/699, GB/700, GDT1220<B3U?7). 1.2.3 Requirements for materials in the warehouse
3.2.3.1 Materials with certificates: Before entering the warehouse, they should be selected from the same batch, which can be in the Shanghai media number For carbon steel, carbon, ethanol, sulfur, and quaternary elements should be analyzed (if there is a light content, analysis should also be carried out; for alloy steel, analysis of alloy elements should be added 3.23.23 Special materials: 100% chemical analysis and mechanical properties should be carried out before entering the warehouse (under the condition of reliable separation of furnace numbers, two pieces can be sampled from the same batch and return number) 3.2.3.3 The qualified materials should be marked with steel number and furnace number 3.2.4 Requirements for material control
3.2.4.1 The molded products with a diameter of mm (forged or directly machined) should be subjected to low-power microstructure inspection for central porosity and sulfur 1.5 level: Segregation must be 1.5 level, no white spots, shrinkage, bubbles, widening and other defects are allowed, oxides and sulfides in non-metallic impurities are no more than 1.5 level, and the total is no more than 2.5 level: 3.2.4.2 The material to be processed must have a certificate.
3.2.4.3 If the material has been heat treated and the mechanical properties meet the requirements, the material can be directly added. Special instructions must be given on the material certificate.
3.1.5 The chemical analysis and mechanical properties inspection of the material shall be in accordance with GB.T222, GB/223.1-223.5, GB.T221.JL, CB/T23J.16GB.T223.2F, GR/T22A 3.2.6 The forging materials must be cleaned of surface defects or ground clean, and the defective materials must be forged. When using steel forging, the loose parts at both ends must be cut off. 3? The steel ratio of the plating is appropriate: when using steel ingots for plating, if the cross-section of the body is calculated, the ratio of the section area is not less than 3: if calculated according to the flange and other protruding parts, it is not less than 2. When using a mold with a diameter>m, it is calculated according to the main body cross-sectional area, and the forging ratio is less than 2.5; if calculated according to the flange or hollow protruding part, it is less than 1.5. 3
JB/T 1308.2-1999
3.2 Forgings shall not have severe detachment and cracks on the surface, and shall not have defects such as cracks, folds, forging scratches, and spot widths. For surfaces that require mechanical processing, if the above defects can be completely removed after processing, they are allowed to be used. 3.7. Forgings with defects are not allowed to be used as sources. 3.2.10 The particle size of plated parts after heat treatment is required to be high or grade 6. 3.2.11 After heat treatment, the parts that are plated or directly fed shall be tested for mechanical properties in accordance with the following provisions: 3.2.11.1 For high-quality parts that are heat-treated in the same process and in the same batch, 20% of the total number of pieces in the batch can be sampled for quality inspection, but if one piece fails, 10% shall be inspected. Liu Shuangtou class column sampling 1% for mechanical performance inspection, collect no less than 2 pieces, on each test piece, no less than 2 pressure test pieces, 2 cold impact test pieces. 3.2.11.2 Other parts
in the same batch of parts with the same protection tank number, and the same process conditions. The number of mechanical performance test pieces recorded is 10% of the total number of parts batches, and no less than 2 pieces are scanned. Take a resistance test piece on the annual test, 2 impact test pieces for a single piece weight = 20g, and the number of equal test pieces of no more than 10 pieces can be taken! Pieces, take 1 broach test piece and 2 impact test pieces on the test piece,
3.212 During the test, if one sample fails, the sample can be retested. If there is still one failure, the batch of parts should be reheat treated. The test method of the reheat treated piece is the same as before. The number of reheat treatments shall not exceed two times [excluding the number of tempering. After the test, if there is still one failure, all the parts in the batch shall be replaced. 3.313 The method of taking mechanical property samples shall be in accordance with the provisions of GB/T2975. When selecting samples, the following methods shall be used: Directly damage the parts:
on the rough chain length;
: damage the same cross section.
If the tangential or radial samples are taken, the mechanical properties are lower than the longitudinal sample values. The allowable reduction ratio shall be in accordance with the provisions in the table. 2 Percentage of allowable reduction
Test standard category
Strength resistance
State ideal point
Required to carry out non-destructive testing according to the specified fee. 3.3 Mechanical processing and assembly
Length,
Allowable reduction
3.3.1 The mechanical processing size, dimensional tolerance, surface roughness, etc. of the required parts shall be in accordance with the provisions of the sample: the required fillet rate after processing shall not be less than the required size. 3.3.2
The parts shall have no defects that affect the strength and damage the appearance. 3.3.4 The sealing surface shall have no defects such as scratches and dents. 3.3.5 After the required parts are qualified, they shall be marked according to the requirements of the drawing. 3.3.6 Before assembling, the parts should be free of hair and dirt. 3.3. During assembly, the grooved parts should be slowly cleaned and the bearing parts should be fully cleaned of grease. After the assembly, the moving parts should be smooth and level; the lifting and lowering of the ball or ball should be flexible, and there should be no jamming. 4 Test methods and acceptance rules 4. Nondestructive testing d.1.1 Nondestructive testing: according to the regulations of JB4730. 4.1.2 Ultrasonic flaw detection: 1) The initial sensitivity of the flaw detection is 2. 2) There shall not be more than 3 single defects, 3) There shall not be a lack of solution area.
The requirements are in accordance with the relevant parts of JB4726, JB4727, and JB4728. 4.2 Product test
4.2.1. Doors, replacement heads, three-way valves, four-way valves, elbows, diameter joints, and diameter pipes shall be subjected to 320 MPa repellency test. .2.2 After assembly, the mesh door shall be subjected to hydraulic sealing test with a nominal pressure of 250 MPa. 4.2.3 The medium for the test shall be water or oil (70% drying, 30% fuel oil). 4.1.4 The duration of the strength test and sealing test shall not be less than mn, and there shall be no irritation during this time. During the rolling test, all air in the body shall be removed. After the test, all the test materials in the body shall be removed. 4.2.5 When conducting temperature test on the check valve, the check valve stem shall be raised to the highest position, the pressure shall be drawn from one end, the other end shall be closed with a conical gasket, and then gradually increased to the specified test pressure, and shall not exceed the specified value. When conducting labor test, the valve shall be in the neutral position. Close the valve group, add pressure from the lower inlet, and conduct the test at the outlet end. 4.2.6 When conducting strength test on the check valve, the pressure shall be drawn from the outlet end, the other end shall be closed with a gasket, and then gradually increased to the specified test pressure, and shall not exceed the specified value. When conducting strength test, the positive force shall be drawn from the outlet end, and the inlet shall be tested. 4.2.? Only a certain handle or handwheel is allowed to be closed, and no other auxiliary devices shall be used. 4.2.8 The part with thermal and gas changes shall be subjected to 38MPa small pressure test. 4.3 Acceptance test!
4.3.1 Each batch or each qualified product shall be accompanied by a product certificate, product packing list, production manual and other documents, and delivered to the supplier together with the product.
4.3.2 The delivery unit shall have a standard control system to inspect the delivered products. 5 Marking, packaging and labeling
5.1 The paint shall be removed according to the provisions of B. If the parts have been surface treated, the paint shall not be removed. 5.2 After the product passes the test, the oil and dirt on the surface shall be removed, and the surface of the product shall be coated with industrial anti-rust oil. Other processed surfaces shall be anti-rust. The channels shall be closed with covers or rollers. 53 When packing, the stop valve shall be closed: the valve with screw flange shall have the inlet and outlet end faces 3-5mm inside the flange. 5.4 The valves and pipe fittings shall be fixed: The products shall be fixed in the box to ensure that they are not damaged during transportation. 5.5 Product certificates, product packing lists and product instructions shall include the following: 5.5. 1 Product certificates
u) Manufacturer name and factory date;
Product name, model and specifications;
|) Nominal output and applicable medium;
[ET 130A.2-1999
Company) Material, chemical composition and mechanical properties of the ten major parts after potential treatment (this item can also be kept in the factory for reference):) Factory number:
Pressure test situation (combat test strength, introduction, test duration and test results: According to the standards and inspection conclusions,
Product individual qualification certificates should be added with the production and technical inspection department, the official form and the inspector's printout and the inspection period: 5.5.2 Packing list
a) Product unit and joint design number:
b) Manufacturer name;
3) Product name, model and specification:
d) The number and net quantity of each box of products;
e) The name and number of the attached documents.
Product packing list is optional! 5.5.3 Product instruction manual
a) Manufacturer's name:
b) Application and main performance specifications:
c) Original design and structure specifications:
d) Overall dimensions and joint dimensions:
e) Materials of key parts
Maintenance, maintenance, installation and use points
g) Possible changes and their elimination methods6 For the strength test of the stopper, the pressure is drawn in at the end, and the other end is closed with a gasket, and then gradually increased to the specified test pressure, which does not exceed the specified value. When conducting the intensive test, the positive force should be drawn in at the outlet, and the pressure should be tested. 4.2. The handle or handwheel should be closed, and other auxiliary devices should not be used. 4.2.8 The inspection part with heat and gas change should be subjected to a 38MPa small pressure test. 4.3 Acceptance!
4.3.1 Each batch or each qualified product should be accompanied by a product certificate, product packing list, production instructions and other documents, and delivered to the investment unit together with the product.
4.3.2 The delivery unit has a planned control standard to control the delivery of the product. 5.1. Paint should be removed according to the provisions of B. When the parts have been surface treated, the paint should not be removed. 5.2. After the product passes the test, the surface oil and dirt should be removed, and the surface and cover should be coated with industrial anti-rust oil. Other processed surfaces should be anti-rust. The channels should be closed with covers or rollers. 5.3. When packing, the stop valve should be closed: the screw flange of the valve, the inlet and outlet end faces should be 3-5mm inside the flange. 5.4. The valves and pipe fittings should be fixed when shipped: The products should be fixed in the box to ensure that they are not damaged during transportation. 5.5 Product certificates, product packing lists and product instructions shall include the following: 5.5. 1 Product certificates
u) Manufacturer name and factory date;
Product name, model and specifications;
|) Nominal output and applicable medium;
[ET 130A.2-1999
Company) Material, chemical composition and mechanical properties of the ten major parts after potential treatment (this item can also be kept in the factory for reference):) Factory number:
Pressure test situation (combat test strength, introduction, test duration and test results: According to the standards and inspection conclusions,
Product individual qualification certificates should be added with the production and technical inspection department, the official form and the inspector's printout and the inspection period: 5.5.2 Packing list
a) Product unit and joint design number:
b) Manufacturer name;
3) Product name, model and specification:
d) The number and net quantity of each box of products;
e) The name and number of the attached documents.
Product packing list is optional! 5.5.3 Product instruction manual
a) Manufacturer's name:
b) Application and main performance specifications:
c) Original design and structure specifications:
d) Overall dimensions and joint dimensions:
e) Materials of key parts
Maintenance, maintenance, installation and use points
g) Possible changes and their elimination methods6. For the strength test of the stopper, the pressure is drawn in at the end, and the other end is closed with a gasket, and then gradually increased to the specified test pressure, which does not exceed the specified value. When conducting the intensive test, the positive force should be drawn in at the outlet, and the pressure should be tested by the mouth. 4.2. The handle or handwheel that can be used to close the stopper should not be used with the help of other auxiliary devices. 4.2.8. For the part with heat and gas change, a 38MPa small pressure test should be conducted. 4.3. Acceptance test!
4.3.1 Each batch or each qualified product should be accompanied by a product certificate, product packing list, production manual and other documents, and delivered to the investment unit together with the product.
4.3.2 The delivery unit has a planned control standard to control the delivery of the product. 5.1. Paint should be removed according to the provisions of B. When the parts have been surface treated, the paint should not be removed. 5.2. After the product passes the test, the surface oil and dirt should be removed, and the surface and the cover should be coated with industrial anti-rust oil. Other processed surfaces should be anti-rust. The channels should be closed with covers or rollers. 5.3. When packing, the stop valve should be closed: the screw flange of the valve, the inlet and outlet end faces should be 3-5mm inside the flange. 5.4. The valves and pipe fittings should be fixed when shipped: The products should be fixed in the box to ensure that they are not damaged during transportation. 5.5 Product certificates, product packing lists and product instructions shall include the following: 5.5. 1 Product certificates
u) Manufacturer name and factory date;
Product name, model and specifications;
|) Nominal output and applicable medium;
[ET 130A.2-1999
Company) Material, chemical composition and mechanical properties of the ten major parts after potential treatment (this item can also be kept in the factory for reference):) Factory number:
Pressure test situation (combat test strength, introduction, test duration and test results: According to the standards and inspection conclusions,
Product individual qualification certificates should be added with the production and technical inspection department, the official form and the inspector's printout and the inspection period: 5.5.2 Packing list
a) Product unit and joint design number:
b) Manufacturer name;
3) Product name, model and specification:
d) The number and net quantity of each box of products;
e) The name and number of the attached documents.
Product packing list is optional! 5.5.3 Product instruction manual
a) Manufacturer's name:
b) Application and main performance specifications:
c) Original design and structure specifications:
d) Overall dimensions and joint dimensions:
e) Materials of key parts
Maintenance, maintenance, installation and use points bzxZ.net
g) Possible changes and their elimination methods
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.