title>Filling-in for technological document format - SJ/T 10375-1993 - Chinese standardNet - bzxz.net
Home > SJ > Filling-in for technological document format
Filling-in for technological document format

Basic Information

Standard ID: SJ/T 10375-1993

Standard Name:Filling-in for technological document format

Chinese Name: 工艺文件格式的填写

Standard category:Electronic Industry Standard (SJ)

state:in force

Date of Release1993-07-21

Date of Implementation:1993-12-01

standard classification number

Standard Classification Number:General>>Standardization Management and General Provisions>>A01 Technical Management

associated standards

Publication information

other information

Introduction to standards:

SJ/T 10375-1993 filling in the process file format SJ/T10375-1993 standard download decompression password: www.bzxz.net



Some standard content:

Electronic Industry Standard of the People's Republic of China
SJ/T 10375-1993
Filling--in for technological designation 1993-07-21 issued
Ministry of Information Industry of the People's Republic of China
1993-12-01 implemented
1 Subject content and scope of application
2 Reference standards
3 Text requirements
3.1 General requirements
3.2 Requirements for technical documents
3.3 Requirements for text content
4.1 General format of process documents
4.2 Process document format (GS1.GH2)
4.3 Technical document format (GS2.GH2) 4.5 Process flow chart format (GS4.GII4) 4.6 Add:. I. Process card format (GS5, GH5) Process card format for processing (continued) (GS5a, GS6a) 4.8 Warping process card format (GSG, GH6)
Ceramic materials, enterprise matching. Moulding process card format (GS7.GH7) .... 4.9
Heat treatment card format (GS8.GH8)
Electrical connection and chemical coating process card format (GS white, GH9) ....
Tuco coating process card format (GS10, GHT0)+-+.
T. Process card format (OS11, GH11)
Danger explosion lead-out terminal forming T process table format (GS12GH12) Han velvet process card format (GS13, GH13) Wire and wire tie T card format (GS14, GH14) Paste and tape program format (GS15.GH15) .. Loading process card format (GS16GH16) Assembly T process card format (continued) (G516a, GH16) Process Format of technical research (CS17.GHI7)
Format of whole piece (GS18, GH18)
Parts specification (519GH19)...
Bend detail table format (GS29GII2U)...Self-unloading process equipment state seam table format (GS21.GH21) + Purchased T process equipment summary table format (GS22.0H22) Material consumption process quota detail table 2 format (G$23, GH23) Material consumption 1. Process quota summary table Format (GS24, GH24). Energy consumption process step quota list format (GS25, GH252) Working hours (equipment matching) Process quota list format ((S26, 2GH26) Working hours (equipment hours) Process quota summary table format (GS27, GH27) (
) Table format (GS28, GH28)
Process control point list format (GB29, GH29) (1)
...(3)
· (9)
4.S3 Format of previous process quality analysis table (GS30, GH30)4.34 Format of process control point operation instruction card (GS31, GH31)4.35 Format of process transfer point inspection instruction card (GS32, GH32)4. 36
Format of process document change notification form (A1-GS1, DI-GH1)Format of professional process program (B1-GS1, E1-GH1)4.37
Format of automatic and hexagonal lathe adjustment card ((C1-GSt, F)-GH1)d. 38
Electronic industry standard of the People's Republic of China
Filling in far technical document format1 Subject content and applicable scope
This standard specifies the filling requirements and filling cases of SJ/T10820T process document format. This standard applies to the process documents of electronic industrial products and their components. 2 Reference Standards
GE2828
GB310G
Standardization Guidelines for Standardization Basic Small Provisions Addition Inspection Counting Sampling Procedure Long Sampling Table Temporarily Used for the Inspection of Continuous Batch) International System of Units and Its Application
CB4457~-4460 Mechanical Drawing
GE 4863
ST2654
SJT10320
SJ/T 10376
3 Pit Writing Requirements
3.! 1.1.1 The preparation of process documents should be based on: product design documents, process plans and relevant industry standards. 3.1.2 The prepared process documents should be complete, accurate, and able to effectively guide production. SU/T10375—1993 3.1.3 The content should be brief and clear, with clear text and neat format. The simplified version officially announced by the country should be adopted. 3-1.4 The terms, symbols and units used in process documents should comply with GB3100, GB1)48632 and S.1/T! 0376 and other relevant standards and regulations
5.1.5 The format of the continuation page at the end can be written more or in the format of process instructions according to the needs. 3.2 Requirements for process drawings
3.2.1 The process diagram is a complete description of the sequential content in the process. 32.21 The process diagram should be drawn according to the requirements and schematic views. If it does not affect the identification, it shall not be drawn to scale. 3-2.3 The surfaces in the process specifications shall be represented by solid lines, and the non-processed surfaces shall be represented by thin solid lines. 3.2.4 The process specifications shall indicate the size, dimensional tolerance, geometric tolerance, surface roughness and measurement range of the process. 3.2.5 Electrical and other drawings shall be drawn according to the requirements of relevant technical standards. 3.3 Requirements for text content
3.1 The writing of the drawings shall be in accordance with B 1.1 Regulations. 3.3.2 In the case of a small amount of failure, the process document shall be filled with the abbreviation of the process name: such as: "installation" means "assembly sequence" and "inspection" means "inspection".
Ministry of Industry of the People's Republic of China 1993-07-21 Standard 1993-120 Implementation
A Fill in
4.1 Process document format column
SJ/T10375-1993
The headers, title columns and headers of various process documents are collectively referred to as general columns. 4.1.1 Purpose: used to write product names, product drawing numbers, editing, signing, update marks and archive, etc. 4. 1.2 Writing method: See Table 1, column 20, please fill in as needed, such as the name of the enterprise, enterprise code or enterprise product model, etc. Name of the technical file: * Product name or code
Product code
Parts, components, types and pressure numbers
Professional/technical file number
Other old The doctor and the doctor's office postal number
low regular period total column research personnel signature
school will use this history change name. Treatment, b, fill in the same change mark under the change place number month 1.2,3 history change notice single terminal number
change recipient disk name
change period
responsibility in the word note
according to the disease key field write
technique, 2.3 original writing room - dream map the same process card 4.2.1 Purpose: Used to compile the cover of the process document: 4.2.2 Writing method: See Table 2.
Product book T process document terminal number
Product book process document page
Product process document total
Product type, quantity, name and drawing number
Product process document content
Unit price Signature of the technical person in charge
Date of approval of the work document
Full name of the unit
4.3.1 Purpose: Used to compile the time table of the production process document. It also contains the set of product process documents. 4.3.2 Filling method: See Table 3
SJ/T 10375—1993
2..Write the sequence number
Write the part number and name of the whole drawing number and name according to the design document
The total number of process documents for this function
Quantity requirement
4.Process flow chart format (1) (GS.GH3)
4.4.1 Purpose: Used to compile the process documents of the system diagram of the relationship between the products and their parts and components in the process of the whole process, which is the basis for compiling the process specifications.
4.4 2 Filling method: See Table 4
Process flow chart format (1) (GS4,GH4)
4.5.1 Purpose: Used to compile the process documents of the whole process of component products and their parts and components in the process of processing, indicating the production sequence of the product in the process of processing and the specific specifications and process requirements of each process. The basis for organizing production. 4.5.2 Training method; see Table 5
Month
Talk about the shop number
Write the symbol to prepare the process flow of product processing process
Set the process card code
The main process specification and cost requirements of this process
Write as needed
4.6 Process card format (GS5.GH5)
4.61 Purpose, prepare a process document that describes the product parts, such as the process, in units of the process, and indicate the specific content and requirements of each process in the process.
4.6.2 Pit method: male Table 6.
Technical product sample requires filling in the name of the material, brand and current
type and size of the rough parts, the actual size of the parts, the material before processing, the size of each rough part that can be manufactured
piece () the quality of the rough parts (net
parts) (required) material consumption process constant
raw materials (raw materials) or in the name of the department providing the product code
the name of the workshop to which the process belongs
the name of the process
the name of the process
the name of the process
the technical requirements of the process
SJ/T10375—1993
Continued Table 6
the technical requirements of the process for the customer and the main cost, the sub-steps can be omitted, and the name of the process required by the second step is required Point number
Equipment required for this process (instrumentation) type and time limit of this process (preparation and quota of process) Fill in according to the same
Draw process chart
4.7 Process card format (continued) (GS5aG5a)
4.7.1 Purpose, use a comprehensive processing card 1. Process card G%5, GH5 format continuation page. Cannot be used alone. 4.7.2 Method and GS5.GH5 format filling content are the same. 4.8 New material process sheet format (S6, GH6) 4. Date. January: Used for the manufacture of plastic parts of plastic or compression molding, indicating its process and requirements. When writing, the relevant items of the service format should be filled in according to the expansion type. 2. Filling method: see Table 7
Number
Write the name, brand, shape of the material group, powder form, etc. according to the requirements of the product drawing
Material color and color code
The net quantity of each product, fill in the blanks according to the total mass of all pieces (total mass) in each mold and the total mass of the materials used in the mold
Note, do not fill in the total mass of multiple pieces after the production process is completed. Write the net mass (excluding the total mass) in the sample of the product
respectively; write the name, number and number of the material supply unit 1, for items without separate columns, write the properties of the drawing
In addition, write the material pretreatment equipment, temperature, time, material thickness (referring to the material accumulation in the processing equipment) and the forming equipment, limit, time. , the material is cooled down by water cooling, air cooling, etc. after the single piece is processed (the source of the part is virtual), and the name of the receiving department or the chemical induction induction department after evaluating the part model is filled in with the correct preheating information of the new part. For guarantee, the 5 points of the table are low in force and position for transportation into the car respectively, and the forming part is closed. 6. The name of the most careful planning of the mold and the number of the working process are discussed. Rong Dai Ning
Process (sequence number of step
Process name and main content and technical information
1 The model and name of the equipment included in the above table>: the name and sales number of the factory and the production code of the factory. The type of
The process of the factory, etc. (the process specification during preparation and review) Shaanxi Ju Shenzhen No.
Draw the company drawing or install the company
SJ/T 10375-1993
4.9 Porcelain, metal pressure, mold casting process card format (GS7, GH7) 4.9.1 Opening: Used for the production of pipes, gold die casting and replacement casting molding process documents, indicating the basic process requirements. When compiling, fill in the relevant items in the format according to the processing type. 4.9.2 Writing method: See Table B
Column number
Write the name and brand of the parts material according to the product drawing
The proportion of the alloy material
The net mass of the whole product, fill in the content as needed
Write the total quality of each molded piece (i.e. the number of effective cavities)
Write the total quality of the selected batch of products according to the total rate of all parts in the mold (the total quality and the total profit of the material in the mold)
Write the net mass (excluding the maximum mass).
refers to the total mass plus the consumption.
write the parts number, name, trace amount and feed door name or chemical component selection, the drawing size column should be filled in the building number wwW.bzxz.Net
respectively fill in the material pretreatment equipment, feeding tray, time, material thickness (referring to the thickness of the pile in the processing equipment after molding), humidity, time, material thickness (referring to the original degree of preparation), and the processing required for the part. The name or code of the door after molding, the name of the fixed mold, the dynamic mold, the alloy washer and the injection device are filled in separately. The closing pressure, injection pressure, and holding pressure during molding are filled in separately. The total pressure and the time of the product molding are filled in separately. The name and brand of the mold release agent when opening the mold
The workshop name or code mentioned above
T sequence (step) version number| |tt||Name of the sequence (step), main operation content and technical requirements of the sequence. Equipment required for the sequence (including the model and name of the receiver and instrument). Name and number of the equipment required for the sequence.
The processing type of the process.
The process specification of the process (including the standards and process specifications). Fill in the basic information.
The three-dimensional process diagram or table.
4.10 Heat treatment process sheet format (GS8, QH8) 4. 10. 1
Purpose; for the preparation of the process of heat treatment of components. Filling method: see the table,
the process number (referring to the process number in GS5, GH5), the name or code of the process (referring to the name of the sequence in GS5, GH5), the name of the department providing the components, the name of the department receiving the components, the name of the material to be changed, the brand name, the depth of the hardened layer of the component, the hardness, the metallurgical properties, the mechanical properties, the heat treatment requirements, etc. 5
SJ/T10375
Continued Table 9
Note: 2.3. The name and content of each step shall be written in the product number on the system
The name, model and abbreviation of the equipment and tools required for this step shall be written in the fields such as the name of the heating medium, the temperature and time respectively or the method of cooling, the name of the medium, the temperature and time respectively
The working time quota of this step (including the preparation and normal working time process quota) shall be filled in according to the requirements
4.1 Electrical and chemical coating process card (OS9.CH9) content
4.11.1 Pressure control, etc., are the process documents of the process of electrical and chemical coating. For the purpose of good maintenance and process inconsistency, fill in the corresponding columns according to the processing type. 4.11.2 Filling method: See Table 11.
Quick product drawing, add the name and mark inside the plating process
The name of the process 5. Serial number (CS5, H5 or GS16, GHi6 in the serial number system: no code) The name or code of the workshop in the above sequence
respectively fill in the name of the supply department and the name of the receiving department after the case minus the code and the name of the sequence
Check the product seat and send it again, the name of the service village material and the brand of the department (take 115.16 pieces)
Zero, the surface identification of the work surface can be taken as 1.10, 1. Calculate the position of the window piece
The input number of the zero, the section coating and the professional process specification is missing 4 before and after the mold is washed, the surface state of the double comprehensive material consumption
calibration【.... Please fill in the general sequence of steps and content (referring to the type of coating, such as aluminum, cladding, standardization, etc.) Fill in the source of the parts and determine the coating method, such as monthly measurement <20) The mother specification number: Column (21) Fill in the zero number, the policy lock is not true and will cause, fill in the process and parts quality classification. Write the general process requirements (data verification professional process institute program items) price shadow add The name, molecular formula and content of the droplet treatment are set according to the light processing time and process benefits (including the standard and drum time process department should fill in the process department according to the production process. Technical consultation or agricultural cabinet
4.12 Paint coating process card format (S1UGH110) 4.12.1 Until the house is used for film, etc., the department and parts will be coated with the current process through the process of the brilliant process 4.12.2 Fill in the method, see Table 11,
SJ/T 10375-1993
Read the serial number and name of the process (referring to AS5.GHI5 or GS16.CI16 cattle process) The name of the process can be filled in separately, and the name or code of the receiving department after the whole piece is supplied. The coating area
The material consumption process quota is calculated by 1.10.D0 pieces) Write the workpiece material name and brand according to the product sample. Fill in the coating amount requirements for the inner and outer surfaces of parts, components and whole parts separately. Fill in the serial number of the process step according to 1, 23. Fill in the name of the process step and the name, name and number of the equipment and tooling used in the process. The name and brand of the raw material used in the process step. Write the viscosity, pressure, drying temperature and drying time (if it is not machine spraying, do not fill in the pressure). Fill in the coating treatment level (optional, I.) The time setting of the step (including the standard and final time setting) should be written to the process supplier. 4. Process card format (GSII, GHII) 4.13.1 Purpose: Used to compile process documents for the production environment requirements of the components and process, and indicate the process requirements according to the process. This card is used in conjunction with 1. Process description period or other formats. 4.13.2 Writing method: See Table 12. Write the equipment involved in the process, the type of small power, gas, water and heat required for the process, and the safety measures required for the process. The process hygiene level requirements, etc., can be used in the product. The name, code, brand and standard of the material used, the name and number of the container used. 4.14 Components and parts forming process table format (CSI2.GH12) 4. 14. 7
File,
Purpose: Use the unit of parts, components, and complete machines to write the process of the lead-out molding of components used for internal electrical connections: See Table 13.
Technical! ,2,..Fill in the sequence number
Electrical network Given component item code
Component name, model and specification
Component lead-out molding mark code
Component lead-out terminal to be processed
Post, the number of components of the same type, specification, and processing requirements in the whole, the required equipment name, model and number column
$/T103 75—1993
Continued Table 13
Working hours and process specifications (including preparation of working hours and process specifications) Fill in according to the specifications
Wire-made component forming process diagram or forming mark code 4.15 Winding process card format (G513, GH13) 4.15.1 Purpose: Used to prepare process documents for product winding processing. 4.15.2 Filling method: See Table 14.
Column Month Number
Product sample letter item Write the name, brand, standard number and specification of the main and auxiliary materials used in the winding process.
The name of the winding process, drawing number, quantity, and department! Name of the department providing the parts Name or code of the workshop to which the process belongs
Sequence number of the process
Contents and requirements of the sequence
The process description number used in the processing of the process Name, model or number of the equipment and tooling specified in the process.1 Write the process diagram to the manufacturer
Wire and wire tie processing card format (GSI4.GH14) 4 16. 1
Purpose: The process documents including the wire and wire ties required for the internal connection of the whole part and product, filling method: see Table 15.
Column slogan
According to the sequence of 1, 2, 3-
Name, brand and specification of conductor gauge
Fill in the color of conductor according to the design document
Effect (loss) of conductor
Length of conductor (including the length of the head)
Select the length
Fill in the destination of conductor respectively
Name, model and terminal number of equipment and tooling for wire processing Work time and work quota (including preparation and end work time process quota) Write in blocks
Process diagram of conductor processing and taping
4.17 Taping program format (GS15GH15)
4.17.1 Purpose: Used to compile the taping program of components used in automatic insertion machines. 1. Artistic nature. For additional writing methods, see 16.
SI/T 10375—1993
Fill in the order of 1, 2, 3.
Components in the parts, modules and the names of the components, and the specifications
Component integrity mark
Component shape size (D), lead size () Insertion depth of machine-inserted components
As needed
4.18 Assembly process card format (GS16.GH16)
4.1 Date, 1 Purpose, used to compile process documents for the assembly process of components and products, 4.18.2 Filling method: Table 17.
Change. .2.3...Fill in the manufacturer's serial number
Fill in the code and name of the auxiliary materials to be installed respectively, set the name or code of the workshop to be displayed in the second sequence according to the multiple and quantity
The purchase serial number and the name of the workmanship
Set the content and requirements of the sequence (step)
The name of the tooling required for the chain work rate (step) and the type of tooling required, and the type of tooling required to prepare the working time process quota (including the preparation and end time process quota) and make a process diagram
4.19 Assembly process card format (continued) (G16a, GHIFa) content
4.19.1 Purpose: Used to compile assembly process cards in GS16 and GH16 formats, and cannot be used alone. 4.192 The filling method is the same as GS16.CI116. 4.20T. Process specification format (GS17.GH1) 4.20.1 Purpose: It is used to compile a process document that meets the specific process specifications for a certain hand, part, or whole. It can be used to prepare a process specification and to compile a support specification as a supplementary document for other forms; it can also be used to compile other process documents other than the specified format. Such as assembly test instructions, etc.
4.20.2 Writing method: Formats GS17 and GH17 do not have a column. When using this format, you can use text to return the technical content, or you can fill in the following content in a self-made form as needed. See Table 18. Table 18
Column code
(1)Use and use
(2)Materials and formulas used
(3>Equipment, receiver and tools
(4>Process avoidance content and requirements
(5) Inspection
4.27 Inspection card format (GS18GH5)
4.27.1 Purpose: It is used to make final inspection of parts, components, complete parts and products during the manufacturing process, and to make the inspection documents for the parts that need to be made separately during the manufacturing process, such as key three control points, etc. 4.21-2 Filling method: See Table 19.CI16 process) The name of the process can be filled in with the code
respectively. Fill in the name of the receiving department or code after the supply chain. Paint coating area
Material consumption process quota 1.10.D0 piece calculation) According to the product sample, write the workpiece material name and brand. Fill in the parts, parts, and the whole piece. The inner and outer surface coating requirements are filled in according to 1,23. Fill in the serial number of the process step
The name of the process step and the name, name and number of the equipment and tooling used in the process. The name and brand of the raw material used in the process step. Write the viscosity, pressure, drying temperature, and drying time (if it is not machine spraying, the pressure is not filled in) and output the coating treatment level (optional, I,,) and the time setting of the step (including the standard and final time setting of the process). )You need to write
to the electrical process supplier
4. "Technology card format (GSII, GHII)
4.13.1 Purpose: Used to compile process documents for the production environment requirements of the components and parts process, and indicate the process requirements according to the process. This card is used in conjunction with 1. Technology description period or other formats. 4.13.2 Writing method: See Table 12
Write the equipment involved in the process, the type of small power, gas, water) required for the process, and the safety measures required for the process
Technology and health level requirements
The name, code, brand and standard of the material used, the name and number of the container used 4.14 Components and parts lead forming process table format (CSI2.GH12) 4. 14. 7
File,
Purpose: Use the unit of parts, components, and complete machines to write the process of the lead-out forming of components used for internal electrical connections: See Table 13.
Technical! ,2,..Fill in the sequence number
Electrical network given component item code
Component name, model and specification
Component lead-out forming marking code
|The lead-out end of the component needs to be processed.
The number of components of the same type, specification and processing requirements in the whole. The required equipment name, model and number column
$/T10375—1993
Continued Table 13
Working time and process questions (including the working time and process requirements of the preparation of the equipment) should be filled in according to the equipment
Wire component forming process diagram or forming mark code 4. 15 Wire winding process card format (G513, GH13) 4.15.1 Purpose: Used to prepare process documents for product wire winding processing. 4.15.2 Filling method: See Table 14.
Column No.
Write the name, brand, standard number and specification of the main and auxiliary materials used in the wire winding process.
The name of the winding process, drawing number, name of the department providing the parts
The name or code of the workshop to which the process belongs
The sequence number of the process
The content and requirements of the sequence
The process description number used in the process
The name, model or number of the equipment and tooling used in the process
Write the process drawing to the manufacturer
Wire and wire binding processing card format (GSI4.GH14) 4 16. 1
Application: The process documents for the wiring and wiring required for the internal connection of the whole part and product. Filling method: see Table 15.
Column slogan
According to the sequence of 1, 2, 3-
Name, brand and specification of conductor gauge
Fill in the color of conductor according to the design document
Effect (loss) of conductor
Length of conductor (including the length of the head)
Select the length
Fill in the destination of conductor respectively
Name, model and terminal number of equipment and tooling for wire processing Work time and work quota (including preparation and end work time process quota) Write in blocks
Process diagram of conductor processing and taping
4.17 Taping program format (GS15GH15)
4.17.1 Purpose: Used to compile the taping program of components used in automatic insertion machines. 1. Artistic nature. For additional writing methods, see 16.
SI/T 10375—1993
Fill in the order of 1, 2, 3.
Components in the parts, modules and the names of the components, and the specifications
Component integrity mark
Component shape size (D), lead size () Insertion depth of machine-inserted components
As needed
4.18 Assembly process card format (GS16.GH16)
4.1 Date, 1 Purpose, used to compile process documents for the assembly process of components and products, 4.18.2 Filling method: Table 17.
Change. .2.3...Fill in the manufacturer's serial number
Fill in the code and name of the auxiliary materials to be installed respectively, set the name or code of the workshop to be displayed in the second sequence according to the multiple and quantity
The purchase serial number and the name of the workmanship
Set the content and requirements of the sequence (step)
The name of the tooling required for the chain work rate (step) and the type of tooling required, and the type of tooling required to prepare the working time process quota (including the preparation and end time process quota) and make a process diagram
4.19 Assembly process card format (continued) (G16a, GHIFa) content
4.19.1 Purpose: Used to compile assembly process cards in GS16 and GH16 formats, and cannot be used alone. 4.192 The filling method is the same as GS16.CI116. 4.20T. Process specification format (GS17.GH1) 4.20.1 Purpose: It is used to compile a process document that meets the specific process specifications for a certain hand, part, or whole. It can be used to prepare a process specification and to compile a support specification as a supplementary document for other forms; it can also be used to compile other process documents other than the specified format. Such as assembly test instructions, etc.
4.20.2 Writing method: Formats GS17 and GH17 do not have a column. When using this format, you can use text to return the technical content, or you can fill in the following content in a self-made form as needed. See Table 18. Table 18
Column code
(1)Use and use
(2)Materials and formulas used
(3>Equipment, receiver and tools
(4>Process avoidance content and requirements
(5) Inspection
4.27 Inspection card format (GS18GH5)
4.27.1 Purpose: It is used to make final inspection of parts, components, complete parts and products during the manufacturing process, and to make the inspection documents for the parts that need to be made separately during the manufacturing process, such as key three control points, etc. 4.21-2 Filling method: See Table 19.CI16 process) The name of the process can be filled in with the code
respectively. Fill in the name of the receiving department or code after the supply chain. Paint coating area
Material consumption process quota 1.10.D0 piece calculation) According to the product sample, write the workpiece material name and brand. Fill in the parts, parts, and the whole piece. The inner and outer surface coating requirements are filled in according to 1,23. Fill in the serial number of the process step
The name of the process step and the name, name and number of the equipment and tooling used in the process. The name and brand of the raw material used in the process step. Write the viscosity, pressure, drying temperature, and drying time (if it is not machine spraying, the pressure is not filled in) and output the coating treatment level (optional, I,,) and the time setting of the step (including the standard and final time setting of the process). )You need to write
to the electrical process supplier
4. "Technology card format (GSII, GHII)
4.13.1 Purpose: Used to compile process documents for the production environment requirements of the components and parts process, and indicate the process requirements according to the process. This card is used in conjunction with 1. Technology description period or other formats. 4.13.2 Writing method: See Table 12
Write the equipment involved in the process, the type of small power, gas, water) required for the process, and the safety measures required for the process
Technology and health level requirements
The name, code, brand and standard of the material used, the name and number of the container used 4.14 Components and parts lead forming process table format (CSI2.GH12) 4. 14. 7
File,
Purpose: Use the unit of parts, components, and complete machines to write the process of the lead-out forming of components used for internal electrical connections: See Table 13.
Technical! ,2,..Fill in the sequence number
Electrical network given component item code
Component name, model and specification
Component lead-out forming marking code
|The lead-out end of the component needs to be processed.
The number of components of the same type, specification and processing requirements in the whole. The required equipment name, model and number column
$/T10375—1993
Continued Table 13
Working time and process questions (including the working time and process requirements of the preparation of the equipment) should be filled in according to the equipment
Wire component forming process diagram or forming mark code 4. 15 Wire winding process card format (G513, GH13) 4.15.1 Purpose: Used to prepare process documents for product wire winding processing. 4.15.2 Filling method: See Table 14.
Column No.
Write the name, brand, standard number and specification of the main and auxiliary materials used in the wire winding process.
The name of the winding process, drawing number, name of the department providing the parts
The name or code of the workshop to which the process belongs
The sequence number of the process
The content and requirements of the sequence
The process description number used in the process
The name, model or number of the equipment and tooling used in the process
Write the process drawing to the manufacturer
Wire and wire binding processing card format (GSI4.GH14) 4 16. 1
Application: The process documents for the wiring and connection required for the internal connection of the whole part and product, filling method: see Table 15.
Column slogan
According to the sequence of 1, 2, 3-
Name, brand and specification of conductor gauge
Fill in the color of conductor according to the design document
Effect (loss) of conductor
Length of conductor (including the length of the head)
Select the length
Fill in the destination of conductor respectively
Name, model and terminal number of equipment and tooling for wire processing Work time and work quota (including preparation and end work time process quota) Write in blocks
Process diagram of conductor processing and taping
4.17 Taping program format (GS15GH15)
4.17.1 Purpose: Used to compile the taping program of components used in automatic insertion machines. 1. Artistic nature. For additional writing methods, see 16.
SI/T 10375—1993
Fill in the order of 1, 2, 3.
Components in the parts, modules and the names of the components, and the specifications
Component integrity mark
Component shape size (D), lead size () Insertion depth of machine-inserted components
As needed
4.18 Assembly process card format (GS16.GH16)
4.1 Date, 1 Purpose, used to compile process documents for the assembly process of components and products, 4.18.2 Filling method: Table 17.
Change. .2.3...Fill in the manufacturer's serial number
Fill in the code and name of the auxiliary materials to be installed respectively, set the name or code of the workshop to be displayed in the second sequence according to the multiple and quantity
The purchase serial number and the name of the workmanship
Set the content and requirements of the sequence (step)
The name of the tooling required for the chain work rate (step) and the type of tooling required, and the type of tooling required to prepare the working time process quota (including the preparation and end time process quota) and make a process diagram
4.19 Assembly process card format (continued) (G16a, GHIFa) content
4.19.1 Purpose: Used to compile assembly process cards in GS16 and GH16 formats, and cannot be used alone. 4.192 The filling method is the same as GS16.CI116. 4.20T. Process specification format (GS17.GH1) 4.20.1 Purpose: It is used to compile a process document that meets the specific process specifications for a certain hand, part, or whole. It can be used to prepare a process specification and to compile a support specification as a supplementary document for other forms; it can also be used to compile other process documents other than the specified format. Such as assembly test instructions, etc.
4.20.2 Writing method: Formats GS17 and GH17 do not have a column. When using this format, you can use text to return the technical content, or you can fill in the following content in a self-made form as needed. See Table 18. Table 18
Column code
(1)Use and use
(2)Materials and formulas used
(3>Equipment, receiver and tools
(4>Process avoidance content and requirements
(5) Inspection
4.27 Inspection card format (GS18GH5)
4.27.1 Purpose: It is used to make final inspection of parts, components, complete parts and products during the manufacturing process, and to make the inspection documents for the parts that need to be made separately during the manufacturing process, such as key three control points, etc. 4.21-2 Filling method: See Table 19.
Technical! ,2,..Fill in the sequence number
Electrical network given component item code
Component name, model and specification
Component lead wall forming mark code
Component lead end to be processed long seat
Postal code, the number of components of the same type, specification and processing requirements in the whole child, the required equipment and tool name, model and vibration number column
$/T10375—1993
Continued Table 13
Work time and process questions (including preparation and installation of market work (When the process is specified, fill in according to the specification
Wire-made component forming process diagram or forming mark code 4.15 Winding process card format (G513, GH13) 4.15.1 Purpose: Used to prepare process documents for product winding processing. 4.15.2 Filling method: See Table 14.
Column month number
Product letter sample item Write the name, brand, standard number and specification of the main and auxiliary materials used in the winding process, the name of the mail, the drawing number, the quantity and quality of the winding process! Name of the department providing the parts Name or code of the workshop to which the process belongs
Sequence number of the process
Contents and requirements of the sequence
The process description number used in the processing of the process Name, model or number of the equipment and tooling specified in the process.1 Write the process diagram to the manufacturer
Wire and wire tie processing card format (GSI4.GH14) 4 16. 1
Purpose: The process documents including the wire and wire ties required for the internal connection of the whole part and product, filling method: see Table 15.
Column slogan
According to the sequence of 1, 2, 3-
Name, brand and specification of conductor gauge
Fill in the color of conductor according to the design document
Effect (loss) of conductor
Length of conductor (including the length of the head)
Select the length
Fill in the destination of conductor respectively
Name, model and terminal number of equipment and tooling for wire processing Work time and work quota (including preparation and end work time process quota) Write in blocks
Process diagram of conductor processing and taping
4.17 Taping program format (GS15GH15)
4.17.1 Purpose: Used to compile the taping program of components used in automatic insertion machines. 1. Artistic nature. For additional writing methods, see 16.
SI/T 10375—1993
Fill in the order of 1, 2, 3.
Components in the parts, modules and the names of the components, and the specifications
Component integrity mark
Component shape size (D), lead size () Insertion depth of machine-inserted components
As needed
4.18 Assembly process card format (GS16.GH16)
4.1 Date, 1 Purpose, used to compile process documents for the assembly process of components and products, 4.18.2 Filling method: Table 17.
Change. .2.3...Fill in the manufacturer's serial number
Fill in the code and name of the auxiliary materials to be installed respectively, set the name or code of the workshop to be displayed in the second sequence according to the multiple and quantity
The purchase serial number and the name of the workmanship
Set the content and requirements of the sequence (step)
The name of the tooling required for the chain work rate (step) and the type of tooling required, and the type of tooling required to prepare the working time process quota (including the preparation and end time process quota) and make a process diagram
4.19 Assembly process card format (continued) (G16a, GHIFa) content
4.19.1 Purpose: Used to compile assembly process cards in GS16 and GH16 formats, and cannot be used alone. 4.192 The filling method is the same as GS16.CI116. 4.20T. Process specification format (GS17.GH1) 4.20.1 Purpose: It is used to compile a process document that meets the specific process specifications for a certain hand, part, or whole. It can be used to prepare a process specification and to compile a support specification as a supplementary document for other forms; it can also be used to compile other process documents other than the specified format. Such as assembly test instructions, etc.
4.20.2 Writing method: Formats GS17 and GH17 do not have a column. When using this format, you can use text to return the technical content, or you can fill in the following content in a self-made form as needed. See Table 18. Table 18
Column code
(1)Use and use
(2)Materials and formulas used
(3>Equipment, receiver and tools
(4>Process avoidance content and requirements
(5) Inspection
4.27 Inspection card format (GS18GH5)
4.27.1 Purpose: It is used to make final inspection of parts, components, complete parts and products during the manufacturing process, and to make the inspection documents for the parts that need to be made separately during the manufacturing process, such as key three control points, etc. 4.21-2 Filling method: See Table 19.
Technical! ,2,..Fill in the sequence number
Electrical network given component item code
Component name, model and specification
Component lead wall forming mark code
Component lead end to be processed long seat
Postal code, the number of components of the same type, specification and processing requirements in the whole child, the required equipment and tool name, model and vibration number column
$/T10375—1993
Continued Table 13
Work time and process questions (including preparation and installation of market work (When the process is specified, fill in according to the specification
Wire-made component forming process diagram or forming mark code 4.15 Winding process card format (G513, GH13) 4.15.1 Purpose: Used to prepare process documents for product winding processing. 4.15.2 Filling method: See Table 14.
Column month number
Product letter sample item Write the name, brand, standard number and specification of the main and auxiliary materials used in the winding process, the name of the mail, the drawing number, the quantity and quality of the winding process! Name of the department providing the parts Name or code of the workshop to which the process belongs
Sequence number of the process
Contents and requirements of the sequence
The process description number used in the processing of the process Name, model or number of the equipment and tooling specified in the process.1 Write the process diagram to the manufacturer
Wire and wire tie processing card format (GSI4.GH14) 4 16. 1
Purpose: The process documents including the wire and wire ties required for the internal connection of the whole part and product, filling method: see Table 15.
Column slogan
According to the sequence of 1, 2, 3-
Name, brand and specification of conductor gauge
Fill in the color of conductor according to the design document
Effect (loss) of conductor
Length of conductor (including the length of the head)
Select the length
Fill in the destination of conductor respectively
Name, model and terminal number of equipment and tooling for wire processing Work time and work quota (including preparation and end work time process quota) Write in blocks
Process diagram of conductor processing and taping
4.17 Taping program format (GS15GH15)
4.17.1 Purpose: Used to compile the taping program of components used in automatic insertion machines. 1. Artistic nature. For additional writing methods, see 16.
SI/T 10375—1993
Fill in the order of 1, 2, 3.
Components in the parts, modules and the names of the components, and the specifications
Component integrity mark
Component shape size (D), lead size () Insertion depth of machine-inserted components
As needed
4.18 Assembly process card format (GS16.GH16)
4.1 Date, 1 Purpose, used to compile process documents for the assembly process of components and products, 4.18.2 Filling method: Table 17.
Change. .2.3...Fill in the manufacturer's serial number
Fill in the code and name of the auxiliary materials to be installed respectively, set the name or code of the workshop to be displayed in the second sequence according to the multiple and quantity
The purchase serial number and the name of the workmanship
Set the content and requirements of the sequence (step)
The name of the tooling required for the chain work rate (step) and the type of tooling required, and the type of tooling required to prepare the working time process quota (including the preparation and end time process quota) and make a process diagram
4.19 Assembly process card format (continued) (G16a, GHIFa) content
4.19.1 Purpose: Used to compile assembly process cards in GS16 and GH16 formats, and cannot be used alone. 4.192 The filling method is the same as GS16.CI116. 4.20T. Process specification format (GS17.GH1) 4.20.1 Purpose: It is used to compile a process document that meets the specific process specifications for a certain hand, part, or whole. It can be used to prepare a process specification and to compile a support specification as a supplementary document for other forms; it can also be used to compile other process documents other than the specified format. Such as assembly test instructions, etc.
4.20.2 Writing method: Formats GS17 and GH17 do not have a column. When using this format, you can use text to return the technical content, or you can fill in the following content in a self-made form as needed. See Table 18. Table 18
Column code
(1)Use and use
(2)Materials and formulas used
(3>Equipment, receiver and tools
(4>Process avoidance content and requirements
(5) Inspection
4.27 Inspection card format (GS18GH5)
4.27.1 Purpose: It is used to make final inspection of parts, components, complete parts and products during the manufacturing process, and to make the inspection documents for the parts that need to be made separately during the manufacturing process, such as key three control points, etc. 4.21-2 Filling method: See Table 19.1. Purpose: Used to compile assembly process cards in GS16 and GH16 formats, and cannot be used alone. 4.192 Filling method is the same as GS16.CI116. 4.20.Technical Specification Format (GS17.GH1) 4.20.1 Purpose: Used to compile process documents that provide specific process specifications for a certain part, component, or entire part. It can be used to prepare process specifications and other supplementary documents for other forms; it can also be used to compile other process documents outside the specified format. Such as assembly final test report, etc.
4.20.2 Writing method: Formats GS17 and GH17 do not have a column. When using this format, you can use text to return the technical content, or you can fill in the following content in a self-made form as needed. See Table 18. Table 18
Column code
(1)Use and use
(2)Materials and formulas used
(3>Equipment, receiver and tools
(4>Process avoidance content and requirements
(5) Inspection
4.27 Inspection card format (GS18GH5)
4.27.1 Purpose: It is used to make final inspection of parts, components, complete parts and products during the manufacturing process, and to make the inspection documents for the parts that need to be made separately during the manufacturing process, such as key three control points, etc. 4.21-2 Filling method: See Table 19.1. Purpose: Used to compile assembly process cards in GS16 and GH16 formats, and cannot be used alone. 4.192 Filling method is the same as GS16.CI116. 4.20.Technical Specification Format (GS17.GH1) 4.20.1 Purpose: Used to compile process documents that provide specific process specifications for a certain part, component, or entire part. It can be used to prepare process specifications and other supplementary documents for other forms; it can also be used to compile other process documents outside the specified format. Such as assembly final test report, etc.
4.20.2 Writing method: Formats GS17 and GH17 do not have a column. When using this format, you can use text to return the technical content, or you can fill in the following content in a self-made form as needed. See Table 18. Table 18
Column code
(1)Use and use
(2)Materials and formulas used
(3>Equipment, receiver and tools
(4>Process avoidance content and requirements
(5) Inspection
4.27 Inspection card format (GS18GH5)
4.27.1 Purpose: It is used to make final inspection of parts, components, complete parts and products during the manufacturing process, and to make the inspection documents for the parts that need to be made separately during the manufacturing process, such as key three control points, etc. 4.21-2 Filling method: See Table 19.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.