GB 4706.72-2003 Safety of household and similar electrical appliances - Particular requirements for commercial vending machines
Some standard content:
(1117 This part of the full technical wear is mandatory, FR4706.72-2003/IFC:63335-2-75;1998 This part of the market 16033-2-75:1 household and other types of collection and use of special requirements for the safety of appliances and their supplement 1!938, the wood part and G4706.1S98 home use of the second part: the road health supplement sheet with use.
request (eE63 33 and the joint venture of China Light Industry Corporation. This part is issued by the National Household Electrical Appliances Standardization Technical Committee, the main units of this part: China Electric Appliance Research Institute, the main units of this part: China Quality Certification Center, China State Standard Equipment Co., Ltd., Guangzhao Group. The main drafters of this part: Ma Liubu, Chen Kewei, Zeng Guangfeng, Zhou Shangdi, Qian Duanlin, Di Guo GR 4706.72-2003/1FC60335-2-75:1996IEC 1. The International Electrotechnical Commission (IEC) is a national electrotechnical committee. It is a group of world standardization organizations. Its purpose is to promote all-round cooperation in the field of electrical and electronic standardization. Taking into account the needs of common activities, it also publishes international standards and completes the work of formulating them by technical committees. Any IE committee with a special interest in this technical topic may participate in the preparation work. On the initiative of the two organizations at the FC and IS, they have a close working relationship. 2) All countries with a special interest in the subject may request the opinions of the technical committees. The products of the technical committees are effective in all countries concerned. 3. These resolutions or agreements are made available for international use in the form of standards, technical reports or regulations and are recognized by the national committees in the same sense.
For the purpose of harmonization of the above standards, the responsible country shall adopt the EC standard as the standard provided that national conditions permit. 1. The corresponding national standards have different functions and can be clearly defined in the standard.
5) IE: specifies the procedures for indicating its approval without marking, but does not imply rejection of the responsibility for the equipment to conform to a certain standard: This standard is formulated for the "safety of household and natural use". This standard constitutes the first edition of IE1335-3-:. This standard is based on the following documents. FLIS
61/1652/FD15
61/1492 /FDI3
Technical background
S1/1784/RVD
Report
61/1523/RVL:
For more information on the technical provisions, please refer to the previous report. This standard should be used together with the latest version of EC:e0335 and its supplements. This standard is based on the third edition of 50.135-1:199: in order to convert it into a commercial machine sold in the United States with the "safe rehydration" mark. The applicable clauses of [FC35-1] have been supplemented and adjusted: If a certain clause in "Part 1" is mentioned in "Part 2", then the clause in "Part 1" can be reasonably used. If "increase", "revision" or "quantity change" is indicated in this standard, the corresponding content in the "part" must be modified accordingly. Note 1 In the following standard, the following volume is required: · According to the standard: scientific documents,
Note: printing companion: psychology printing companion,
In this part, when the first step of the definition comes to the adjective, the name of the flow and the required volume are required. Juice? The following differences are not applicable to the following countries:
6.1: For devices with a rated voltage of 1.V between rooms, only Class I appliances are allowed to use: F (this standard) 11.?: The specified number of test cycles is based on the test time: r
-16.2: The leakage current value is different (this standard)-2n.1: The test is not for the relevant countries!,
Chapter 21 Gold Foreign Test (USA).
GB 470F.72-—2003/I GQ335-2-75:1398 A type of device that can be effectively produced by the rated pressure of the front sheet of the device is 23.7: The test pressure element is the rated pressure shown as 5 answers to the relevant figure... 21.1 Liu If the self-heating device is finally operated, the evaluation is not allowed. -25.: It is allowed to make the French Kendi tight and secret expansion sleeve cut to make a large flat; 2, for the lighter voltage of the electric travel line (difference country?.37., not suitable for opening: the United States).
"A leisure request AA: The evaluation of the components containing the injection molding is not enough before the month (related country) 1 bubble figure
GR 4/06.72- 2103/IEX 60335-2-75:1998 Safety of household and similar electrical appliances
Special requirements for commercial vending machines
GT170.1-1SS This chapter uses the following internal code: CT! ·7 This part covers all types of automatic refrigerators and air conditioners for food, beverage and other products. Single cabinet appliances, whose rated voltage does not exceed 25V: For other appliances, whose rated voltage exceeds 431V! : The small part of the core type is "- hot water vending machine:
water block world change machine;
: two-way machine and ice control mixer
natural lead machine:
blood dyeing ratio and fast material change machine
real machine:
request a section or source disk machine
steam adder:
frozen goods vending machine:
quality system or combination machine:
commercial night heater,
can have more than one energy, ||t t||Method: Seven \ before "a energy adaptation training English some of those harmonious such as [--
wave T heat (IECS03R525):
practice quickly, this part deals with general hazards present in appliances, and these hazards are encountered by both users and repair personnel, through, technical part not considered the integration of the integration of appliances 3: other energy products are not listed in this part of the mainland, note 4; if completed or below the hand
to the standard Yue in the vehicle, the upper or lower of the appliance, may need to use the typical milk fast request! In natural, students
many pictures, a pressure device machine heart limited company requires the national energy ministry of health, general pharmaceutical industry ministry of water resources and the United States production department must have added energy home. Note: This product is not used for special use, special gas products, special use in special places, new natural gas products, more note and your license gas, steam or gas): electric booster R43.5) Consult 2! The door is not used for 51 exhibition cabinets. Installed in electrical equipment industrial heater appliances GR A706.72200.3/TRC60335-2-75:1995 Note 5 The use of the same by the same person is limited to the total products of this part. 2 Definitions
G347US.1-199R Except for the following content, all use 2.2.2 This paragraph is replaced by the following narrow connection:
Normal operation lpelion
The device can only work in the holding state 1 Lu to reach the concept, but also work under the most unfavorable conditions. When necessary, the device shall be carried out according to the instructions or maintenance requirements of the currency. The new filling and relevant work shall be started as soon as possible. A period of work shall be carried out according to the requirements of the professional year.
2.7.2 This clause will be replaced by the following month,
Detae foldable parts Hahleart
Do not use tools to select parts that are damaged, and even if the maintenance instructions are needed, the parts that cannot be disassembled will be inspected by the operator. 22.11 Honest inspection parts
: If the total expectation is to achieve the purpose of safety flow, the parts under the United States are considered to be safe, that is, the instructions indicate that it is abnormal and feasible, and the parts under the United States are considered to be safe. 2.8.3 The parts under the appropriate use are:
Thermal cut-trut ...9 The following shall be used instead:
Maintenance operation nlntmnnreoperatio
According to the instructions, instructions or vouchers: the designation shall not be completed by the user or maintenance personnel. Design 1: All equipment personnel shall provide a station with six certain points for maintenance and then provide maintenance personnel with ten required skills and maintenance areas. After 2 years of maintenance, you will have a new product or treatment method. 2.101 Determine the pressure ratelpressnre
The pressure size specified by the manufacturer for the pressure-bearing parts.
2.102 standby state samllylu
According to the instructions, the appliance is in the state of preparation, filled with water, charged or automatically closed: the cash box and the rectifier end are in the reverse state,
2.103 enter key kc
enter this or other way. Note: "The soldiers are also the points\ There are only two enclosed, the article recognizes the line, and the most effective electric transfer to produce the shares, 2.104 super-experienced chain ofenidekey
Use Ding to make the locking device not work. 2.105 Vending machine lisperrsienpplinrice design month to hand over or mark the food, beverage to change the military equipment of low-end consumer goods. Law, the North of the product.
Note:
2.106 Vending machine vendingmachij: by the hard market 2.107 Maintenance Instructions Instraeliunfurmaintenance Explanation If you pay for the flushing, new and full, hard disk can be collected to complete the whole device can be determined by reading the story of the type of file. 2
2.108 Maintenance Peryom Maintenance Peryom Maintenance Instructions Perform maintenance on the device. 2.109 User Area Userarea
Do not use the entry chain or other areas that can be entered: GR 4706.72-2003/TFC 60335-2-75:1998 Method: The monitoring type is the use of the wide area forest pass also judge the financial Ting guard two parts and its also the meter parts, period, and adjustment, whether the calibration belt makes the Sichuan internal safety request in the specified position,
Note: The vehicle industry monitoring equipment is equipped with a wide area station, 2.110 protection area ainlenanctaera
only the area that can be entered by non-users 2111 maintenance area city eireapa
single use welcome chain I do not enter the trend of the heart
2.112 industry type equipment appliamncenfthe professiatl type design Hanzhong whole through the certificate of German personnel, more room or bar staff use open goods to buy social 2.113 monitoring equipment uppliunceufsurrvisu1yph this inside the received innovation section personnel maintenance product, promote the user type he into the monitoring equipment specification occasions to promote the use of sales change rights: monitoring police field meeting demonstration M workers: capital use management enjoy 3 general rest requirements
4 a product internal consultation are flexible
2 test a general close material
6B4715.1-1998 this Heng fall small description content is applicable. 4.3 this single plus the following content,
during the trial period of China is indeed a notice symbol
4.6 this tea state the following inside wear representative Sa:
In the use of the city flash controller, the most unfavorable setting value of the installation world Xie in the promotion area city flash control to provide, the film or its world department maintenance plan to eliminate the unfavorable setting within the limit range.
Jiang: The control system in the difficult to protect area is actually installed in the small model 1.9 This recording is added under the reverse internal run:
When the manufacturer produces the parts with the method of supplementing the company, the hope is to change the parts in the European part to give the most unfavorable introduction results when the test is carried out, 4.10 The system adds the following content:
Design: The recent price and the corresponding pass can be purchased outside the H single before the generation of funds, the frequency converter is more capable of purchasing the accompanying music manual to welcome the installation, such as the more use of the book to see the book can be reliable with the Shangyou only installed together, the amount of consideration of this set of equipment to bring you the impact. 4.131 The design and water source must be filled with temperature, and the requirements are strict for the safety of the least delay! Force under the water, Liu in the old and water, water wet 5. "For" design cold water circuit equipment: made for
4.2 when random according to 4 follow-up protection, this department center about the target protection area with customer suitable company, good results beyond the scope of lithium proposed for the adverse resistance area, H this situation light production station resistance, monitoring at the test point pressure 1.103 when more according to Figure 101 use test expansion, Figure 101 small test also set up the user area city, 4104 even if professional equipment and monitoring equipment equipped with mechanical other doors to be tested according to the heating equipment, 3
GR 2706.72-2003/TT.60335-2-75:1998 let: if the blood equipment does not cover the heating device, the electrical effect according to the electric war equipment test seat, 5 empty chapter
6 classification
B6.! --1! In addition to the above, 6.1 The following provisions of this clause shall apply to the following categories:
The device shall be classified as one of the following types of protection against electric shock: Class 1, Class 2, Class 3, Class 4. The device shall be inspected and tested to determine whether it has passed the test. 6.2 The device shall not be used for outdoor use.
The device may be used for cleaning or installed in places where water may be used. Please give the following points/marks and instructions.
The following provisions of this clause shall apply to all devices except for the following: 1. This clause shall increase the water pressure:
The device shall be connected to a water source with a static water pressure of MPa (Ma or bar) only. The design of the manual flow equipment should indicate the correct working water level: Note: The water mark is always loud, and the type of manual workstation should be marked with the equipment, the voltage, power supply nature and current of the output attack rate should be marked near the output port. The design of the equipment should be coordinated with the following content: No one should go below the deepest water level.
2.3 The following content is added to the case:
When Xie Jian needs to be implemented outside, he is required to be appropriate. 7.6 This tower example F half wear:
... Equipotential G/45.315s6-5J21
? .B This clause shall contain the following:
The terminal at the end of the potential line shall be indicated by the H symbol, which shall not be used for any frequency pin, removable pad or other parts that can be removed during the maintenance of the line. 7.12: The system shall be built with good quality if:
is installed in a detailed maintenance work, and special measures shall be taken as necessary. The maintenance instructions shall indicate the reversible maintenance of this area, and the content shall not include any new or reduced content. If used, the maintenance instructions shall include rust removal, dirt removal and any related cleaning agents, disinfectants or deodorants from the equipment.
It is explained that the equipment is equipped with a few people, and the maintenance of the equipment is partially or completely unattended. The child pointed out that the equipment must be woven into the equipment and maintained, and the input source must be good before the product is reused. The core moving parts of the chain should not be overrun. The customer should purchase the equipment in a small and appropriate manner. The design and research of the equipment safety environment should stipulate the connection method to make the state's reuse law see. After checking and confirming whether the device is suitable, the installation instructions of the professional network device shall state that the device can be installed in situations where its use is strictly limited to trained personnel: GB47G,77--2003, 1EC60335-2-75;1998 The installation instructions of the monitoring device shall state that the device can be installed in situations where its use must be supervised by trained personnel: The professional device designed to be permanently connected to the quality of the equipment, when its leakage current can exceed 0mA, the installation instructions shall state that a residual current protection device (RC) with a residual current of less than 10nA is appropriate. 7.12.101 The installation instructions shall list all accessories that may be used with the device. 7.12.102 For appliances that use water, the maintenance instructions shall include details of how to prevent or ensure proper operation. Determine compliance through visual inspection. 7.12.103 The maintenance instructions shall include the minimum operating and minimum severities required for correct operation. Determine compliance through inspection. 7.12.104 The installation instructions shall state that the appliance is suitable for outdoor use and that it may not be properly installed in the environment. If the appliance is designed to be 11X5, the maintenance instructions shall state that the appliance is not contaminated by water spray. Determine compliance through visual inspection.
7.12.105 For appliances containing compressed gas, the following contents shall be covered by the following regulations: The safe handling of gas through appliances shall be ensured by visual inspection to ensure that it is qualified.
7.12.106 The installation instructions shall indicate the maximum tilt of the appliance. Note: less than 2, it is not necessary to say that the appliance is in a horizontal position and the requirements are met. 8 Protection against live parts
B4.1 The contents of this chapter are applicable.
9 Starting rate of electric appliances
G+706.193% of this chapter, ten applicable.
10 Input power current
0, all applicable,
11 Heating
R7.1-- The contents of this chapter are applicable except for the following. 11.2 The remaining positions of the device in this record are as follows:
The content of the device should be used as follows: As long as the device is installed according to the EU safety table, other cases must be installed in accordance with the following requirements. The device only has a free space above the device. The device should be fixed to a certain place as close to the ground as possible or to a place where it may be inverted, unless the installation instructions specify: For devices with a belt fixed to the ground or a large capacity of less than 40k, the device should be installed according to the installation instructions:
: If there is no requirement for the device to be fixed to the ground, it should be installed as close to the ground as possible. 14 This clause shall be as follows:
If the temperature rise of a motor, transformer or other device exceeds the specified maximum temperature rise limit, the test shall be conducted at the rated power of 1.3S or 11.7S under normal operating conditions.
The device shall reach the planned steady state under normal operating conditions. Note: Fast charging may be required. 11.8 This clause adds the following changes:
The surface condition of the user area does not exceed the bottom of the factory, and the relevant parts can be locked when the key points are changed. Note: This requirement is only applicable to the functional parts of the device. When the normal working rate of the parts is increased, the machine or the parts are changed! The sound performance limit of the upper seat part may exceed the specified limit. 11.101 For refrigeration equipment that does not comply with IEL 60332-2-34, the temperature of the country is not 32 and the temperature is 43. The non-refrigeration part is in standby mode and the refrigeration system is working under the most unfavorable conditions. The motor is in the best working condition. The end of the part of the machine cannot reach the specified value. The motor compressor is designed to be able to pass the following conditions: the motor is a screen press machine: a bag of bags: 140%: 140% per year: 53. 2. The eddy current and electrical strength of the 13.2 working temperature are 4735.1199. Except for the above, the 13.2 contents are as follows: |The following is a fixed type: the maximum rated value of the heating equipment in the industry, for the fixed type 1 professional type H: 1, the rated value of each W of the device is the same as that of ... 1 This clause shall be added as follows:
The following content shall be added as follows:
The following test shall be carried out with a new device with a height of 5 in. in the specified location.
The water filter shall be placed above 1 mm, and the water shall be moved to the rising H state equipment so that the water can be sprayed in all directions.
Note: The design shall ensure that the water does not flow between items, etc.
15.2 This system shall be replaced by the following content:
The structure of the equipment shall be fixed so that it will not affect other electrical appliances, etc., and the electric equipment shall be cleaned and disinfected before use, and the influence of the hidden hall and the false operation shall be passed-2 2. 1-12.2. 12Pa test method is the total report of the circuit with about 1 NC1
B4706.722003/1 core 60335-275,1998 with X also restored and, except for special preparation of my wire, H should be installed with the specified small and chaotic wires in Table 1. Only the corresponding connectors are allowed to be tested when the metal or the expansion connector is not in place, whichever is more unfavorable. Unless otherwise specified: In each test environment, the device must be in the machine state, the workpiece must be in the state of the source, and the device must be pre-filled with light, and the interval between the current or the liquid must be used. It can withstand the test of 16.3 and The visual display card should be able to stop the training and call the conductor system to reduce the distance between the electrical discharge to 2! . One regulation but with a dare or solid trace. However, the danger of the residual product will be the appliance and the dry product area will be used to control or maintain the intended parts in the area, take its disadvantageous teaching if, note: standard \ into the content of what to do according to the standard production increase Dong Ren stop the emperor position mutual, 15.2.7, wide change shape reduction micro shape shot self-made drink wear device filled with collection, leave Luo we how to bear the summary: after, will be 15 research light bath of the ten cool in the distance meter - liter time have average pour people capacity end, design in the case only filled with hope evil traces or change, history change time will not be purple will hope in more thoughts of medicine tree out, do not leave flow after, support change lid. 15.2.2 Almost 1 full of the body of the Mao Department to allow water. \ will each learn to record the water or G.1, single water, whichever is greater, down the mainland inquiry wear device
15.2.3 no body limit qualified output 1 to push the Ding full water. The total annual wear device case volume will be the technology or 2; nature, whichever is greater, within 15:, with [time average into the run device: six departments have not case device more than three, then Asia will be less blocked 15.2.4 wear device or liquid discharge port. The total capacity of a wear difference of 15 or 0.251. Collect H light, 15 to the certificate time and the local to the person ticket!
If the school door with! Some outlets, other beds get the second time, as if there is content, we become ice and carry out the display
15.2.5 Do not rely on the discharge faucet to stop in turn to the unfavorable position of the recording, the appliance must produce a certain resistance to the lower and lower fast heart piece under the condition of the upper pipe, the white to the water tax word to learn 15.2.5 water micro-water supply control I set the fee punch card, with the model specification to pull the whole system hospital tip, after the first drink overflow. Allow to maintain the flow for 1min, white to the price water movement F..
Note: once X is low a spiritual letter gram,
15.2.7 The liquid bulges into the Norge or the industry's service barrier in the device month to pass through the use of the filling and swelling handover and chapter walk on the surface when there is resistance! 15.2.3 If the container is placed in HH, and the container has a long or non-egg surface, the water volume must be tested on the surface of the child's body. If there is more than one water container on the surface, 15.2.9 The products must also be tested in order to prevent any leakage of the product in the test area during the delivery. The extended detection and balance of the device can be equal to the device to produce about the large independent packaging product capacity of the water, to read the simulated liquid leakage rate: through the ground to do the device can be delivered to adults pre-installed product production with ten products group juice: small trial area in the normal product device. Harmony machine non-paper cavity total 15.2.10 summary of the protection instructions he contains to use the wave rest test system through 3 times: 15.2.11 a piece of mm. × nu × m of water sea shrinkage mystery can be completely eliminated first crime parts. It is recommended to use the sea carefully without pressure, bzxz.net
Note: According to the test technology, the company will give the information about the situation of the text area about the table back 52.12 again after the rust removal of the device only need to follow the instructions for maintenance 1! Second paragraph: Understand that it is not allowed to operate under the condition of the machine: "5.3 Read the following clause: GB 4705.72-2003/IE 60335-2-75: '9U8 cannot be placed in an unfavorable position, the electrical single wolf must pass the test of the appliance. 15.101 If the appliance is equipped with a tap for charging or washing, the equipment must be installed so that water cannot be connected to the live parts or the electrical insulation of the appliance. Compliance is determined by the following test. The pressure of the appliance is adjusted to the maximum normal water pressure of the appliance: the valve of the component that can be used to absorb oxygen at a low angle should be selected or placed in an unfavorable position. The tap must be fully opened for 1m and rotated to the most unfavorable position. Then, the end of the appliance must withstand the electrical test of 16.3.102 Appliances that have not been selected for design quality and have not been adequately protected from water damage are tested by the following test. While the appliance is still working, operate at a power input of 1 times the rated power until a steady state is reached. Then the power supply is disconnected or the power source is disconnected in some form. The appliance is completely immersed in water at a temperature of 1-25°C. If the appliance has not been immersed in the deepest water level, the appliance is designed to be used for 51 h. After a period of r1, the appliance is removed from the water and abandoned for a leakage current test of 16.2°. Note: The device must be used only after supervision by the user. The quality of the device must be: The device should undergo an electrical test of [6]. The electrical method is reduced to 1 time. The product is allowed to cool to about the temperature within 1 time. During this period, the adapter should be switched off or the power should be switched off in some way. The test should be done in a vacuum. The following options are available: 1E.2 Test internal and external: The electrical strength and discharge capacity of the device are reduced to 3500 W. The following options are available: 1E.2 Test internal and external: The electrical strength and discharge capacity of the device are reduced to 3500 W. The following options are available: 1E.2 Test internal The following items shall be rectified:
Use the above-mentioned electric heaters only to reduce the current limit of heat dissipation: For the fixed type 1 professional type terminals designed for long-term use, it is allowed to connect to the fixed layout regulations: 2A, the frequency of the device is auxiliary, no large position
For other fixed type I special prohibited appliances: 2mA, the power of the device is 0.5A or 5mA per week, according to the standard of 5A
17 Transformer related circuit overload protection expansion [B1706.11999 of this chapter, all books. 18 Durability
[B, 1-199 of the narrow range of secretion, not applicable. 19.1 This clause shall be used to add the following test items: 19.10-19.03. The detachable parts in the user area shall be placed in the most unfavorable position or in the protection area according to the service instructions. If there is no instructions, the part shall be placed in the most unfavorable position or the protection control container shall be placed in the most unfavorable position (H 4706.72-2C03/TEC 60335-7-75:1998 is installed in the first! Excellent test continent between the action of the quality of the pressure adjustment frame sequence also changed in the diagnosis of the controller at the three non-working state when the concept of H4 can be tested: 19.2 the rate increase as follows:
note the limit heat on the fire test:
Tianshui Institute of Technology;
again through the certificate,
19.4 the energy increase is not the following:
design: cut the load controller but also determine its low action, in order to deal with the strict city into the core of the components in the non-1 determination, 19.6 the system with 1 reverse internal abandonment extraction:
PT core heating parts to carry power under T busy power until the power with the diagram to recognize the state, then, the core heating element can increase: the working voltage of the mutual: when the sequence reaches the fixed sign Concept, the quantity test to achieve 1.5 levels of PTC working voltage or the occurrence of component cracks: Note that the device will not be activated by the voltage applied during the test period. The power supply can be supplied by a separate power source. 19.7 This clause adds the following content: Under the test piece, the device must work under the most favorable conditions of the electric Kai. 19.: 1.2 This record content is modified: The following content is modified: The following station will be replaced by the specified time. The template is effective under the conditions of the white to avoid abnormal fast state. 19.3 This clause adds the following content: During the test period, the material cannot be melted. The degree of severity: The liquid bed structure should be based on the preparation method. The format will hurt people. The spray rate should be small and should affect the compliance with 5.1 and 1:.2. Note: After each test, the results should be calculated to the electrical insulation effect. If it is necessary to carry out the electrical humidity test, 101. It should be based on the market level. The product should be able to operate normally. The liquid bank should be able to be used. The defects in the specification should be observed.
Note 1; In each test, the chip can be connected according to the six damaged parts or components. For example, the system 9 in 2 can be used to check the defects of the device!
Kun sequence device is allowed to be tested:
The work with one or more electrical sources is expected to be broken or the details are missing: the product or phase reduction of the component;
,. The main or 4 downstream use time is used to prove the performance of the new component. Reputation, unless there are only a few two sets of large devices in the middle of the joint, you can report that you can choose to supply this unique car to implement the goods. The big point is welcomed or changed for the need to drive the six forces of the room. The loss of inflammation:
gas industry technology bed model out of the device:
a Pei plug control market or must be due to the situation, Jiang Lai quantity and level of the situation can be used as the external method of the device for the signing of the goods, such as the total order, the device is not safe to work without a single bad read delivery. The user of the hot test electric product packaging tea steam factory
broken hand, strictly close or push the switch under the soil cherish the layer of month standard equipment interruption sales work:
the door does not need to move the production start or close,
maintenance instructions are not under the Sichuan:
not certified correct agent cleaning production group under:It may be necessary to carry out electrical humidity test, 101, it depends on the market level under the official conditions of the goods under the ground. It should be able to add the normal liquid bank to the supply and have been able to operate or defects in the specification,
Note 1; in each test, the chip. The six parts or components can be connected according to the history. 2. The system 9 examples
The defect of the device!
Sequence of the device is allowed to be inspected:
The work with one or more electrical principles or items is detailed: the product or phase reduction of the component;
,. The main large or 4 downstream use time design into a new certificate of natural components of the performance of the 4 can pass "reputation, unless the device has only a few two sets of large devices in the connection you can report the work can be selected to provide to let say this unique car implementation of the goods big point welcome or change a music to need a heart connected six power report drive need a run room of the
read the loss of inflammation:
gas industry technology bed model out of the device:
a Pei plug control market or must be by the situation, Jiang Lai volume flat situation can be said to the device The external method of the goods is not to sign for a long time, such as the total order, the device is not safe, the single flow is not bad, the delivery is not good. The user of the thermal test product packaging is broken, the equipment is interrupted or the switch is pushed down, the sales document is not available, the door is not opened or closed, the maintenance manual is not in the following: the product group is not cleared:It may be necessary to carry out electrical humidity test, 101, it depends on the market level under the official conditions of the goods under the ground. It should be able to add the normal liquid bank to the supply and have been able to operate or defects in the specification,
Note 1; in each test, the chip. The six parts or components can be connected according to the history. 2. The system 9 examples
The defect of the device!
Sequence of the device is allowed to be inspected:
The work with one or more electrical principles or items is detailed: the product or phase reduction of the component;
,. The main large or 4 downstream use time design into a new certificate of natural components of the performance of the 4 can pass "reputation, unless the device has only a few two sets of large devices in the connection you can report the work can be selected to provide to let say this unique car implementation of the goods big point welcome or change a music to need a heart connected six power report drive need a run room of the
read the loss of inflammation:
gas industry technology bed model out of the device:
a Pei plug control market or must be by the situation, Jiang Lai volume flat situation can be said to the device The external method of the goods is not to sign for a long time, such as the total order, the device is not safe, the single flow is not bad, the delivery is not good. The user of the thermal test product packaging is broken, the equipment is interrupted or the switch is pushed down, the sales document is not available, the door is not opened or closed, the maintenance manual is not in the following: the product group is not cleared:
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.