title>QB/T 2214-1996 Determination of carpet size and shape - QB/T 2214-1996 - Chinese standardNet - bzxz.net
Home > QB > QB/T 2214-1996 Determination of carpet size and shape
QB/T 2214-1996 Determination of carpet size and shape

Basic Information

Standard ID: QB/T 2214-1996

Standard Name: Determination of carpet size and shape

Chinese Name: 地毯尺寸及毯形的测定

Standard category:Light Industry Standard (QB)

state:in force

Date of Release1996-03-22

Date of Implementation:1996-12-01

standard classification number

Standard Classification Number:Textiles>>Textile Products>>W56 Blankets

associated standards

alternative situation:ZB W56005-88

Procurement status:neq ISO 3018:1974

Publication information

publishing house:China Light Industry Press

Publication date:1996-12-01

other information

drafter:Fang Cunrong, Sun Yuqi

Drafting unit:Yaojin Carpet Research Institute

Focal point unit:National Carpet Standardization Center

Proposing unit:Quality Standards Department of China Light Industry Federation

Publishing department:China Light Industry Federation

Introduction to standards:

This standard specifies the determination method of effective carpet size and carpet shape. This standard applies to square (square, rectangular) pile handmade carpets and machine-made carpets. Carpets of other shapes can be used as a reference. This standard does not apply to patchwork (combination) carpets. QB/T 2214-1996 Determination of carpet size and carpet shape QB/T2214-1996 Standard download decompression password: www.bzxz.net

Some standard content:

QB/T2214—1996
This standard adopts ISO3018:1974 "Measurement of the size of rectangular textile carpets" in a non-equivalent manner. In combination with the structural characteristics of my country's handmade carpets, ZBW56005-1988 "Measurement of the size of rectangular textile carpets" is revised and the content of carpet shape measurement is supplemented. 1. Description of the changes in the main technical contents of this standard and ISO3018:1974: The name of the standard is changed from "Measurement of the size of rectangular textile carpets" to "Determination of carpet size and carpet shape"; the pretreatment of placing the carpet for "not less than 48 hours" in the original standard is deleted; the carpet shape measurement method is added to the inspection procedure; the calculation method of carpet size deviation percentage and carpet shape deviation percentage is added. 2. In 1988, my country equivalently adopted ISO3018:1974 to formulate ZBW56005—1988 "Determination of the size of rectangular textile carpets". 3. From the date of implementation of this standard, the professional standard ZBW56005-1988 "Determination of the size of rectangular textile carpets" issued by the former Ministry of Light Industry shall be invalid.
This standard is proposed by the Quality Standards Department of the China Light Industry Association. This standard is under the jurisdiction of the National Carpet Standardization Center. The drafting unit of this standard: Tianjin Carpet Research Institute. The main drafters of this standard: Fang Cunrong and Sun Yuqi. 61
1 Scope
Light Industry Industry Standards of the People's Republic of China
Determination of Carpet Size and Carpet Shape
This standard specifies the determination method of carpet effective size and carpet shape. QB/T2214-1996
This standard is applicable to square (square, rectangular) pile handmade carpets and machine-made carpets. Carpets of other shapes can be used for reference. This standard does not apply to patchwork (combination) carpets. 2 Definitions
This standard adopts the following definitions.
2.1 Carpet shape deviation
The size error between the measured carpet shape and the designed shape. 2.2'Effective width
The distance between the outer edges of the two rubbing edges in the weft direction of a hand-knotted carpet. The distance between the outer edges of the pile foundation on both sides in the transverse (weft direction) of a hand-tufted carpet and a machine-made carpet with pile. 2.3 Effective length
The distance between the pile foundation on both sides in the longitudinal (warp direction) of a hand-knotted carpet, a hand-tufted carpet and a machine-made carpet with pile. 3 Principle
Measure the effective dimensions of the carpet in the width and length directions of the carpet in a relaxed state, calculate the average dimension in each direction, and express the carpet shape deviation as the difference between the maximum and minimum dimensions in the three directions. Measuring tool
A tape measure capable of measuring the length of a carpet, with a graduation value not greater than 0.5 cm. 5 Sample
The entire carpet.
6 Inspection Procedure
6.1 Place the carpet on a flat surface with suitable light. 6.2 Use a tape measure to measure the effective dimensions and the maximum and minimum values ​​of the carpet in three locations in width and length (measure once at the center line and once at a distance of 10 cm from each effective edge) in meters, accurate to 0.5 cm, i.e. values ​​less than 0.5 cm should be discarded. Calculation and Expression of Results
7.1 Calculate the percentage deviation of the carpet width and length dimensions according to formula (1). L- Lo × 100
Approved by China Light Industry General Association in 1996-0322
(1)bzxZ.net
Implemented on 1996-12-01
QB/T2214—1996
Wherein: L——Carpet width or length deviation percentage, % (accurate to one decimal place); L——Arithmetic mean of effective measured width or length, m (accurate to three decimal places), L. ——Nominal value of width or length, m (accurate to three decimal places). 7.2 The carpet width and length deviation percentage shall be calculated according to formula (2). Lmax - Lmin]
Wherein: L2--
Carpet width or length deviation percentage, % (accurate to one decimal place); ILmax-Lmin|--Carpet width or length actual maximum and minimum deviation absolute value, m (accurate to three decimal places); Lo
8Test report
Nominal value of width or length, m (accurate to three decimal places). The test report should include the following:
a) Explain that the test is carried out in accordance with the standard and all details of any deviation from this test method; b) Fill in all measured values ​​required by this standard; c) Fill in the size and carpet deviation percentages respectively. (2)
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.