SY/T 5678-1993 Drilling and Completion Handover and Acceptance RulesSY/T5678-1993 Standard download and decompression password: www.bzxz.net
Some standard content:
SY5678-93, Petroleum and Natural Gas Industry Standard of the People's Republic of China Rules for Acceptance of Drilling and Completion Handover Published on September 9, 1993 China National Petroleum Corporation Implementation on March 1, 1994 1 Subject Content and Applicable Specifications Rules for Acceptance of Drilling and Completion Handover of Petroleum and Natural Gas Industry Standard of the People's Republic of China This standard specifies the form, procedure, items and content of acceptance of oil and gas drilling and completion handover. This standard applies to the handover scope of onshore oil and gas drilling and completion. 2 Reference Standards SY 5467-92 Casing String Pressure Test Specification 3 Handover Form and Procedure 3, 1 After the drilling and completion, the operation contractor shall hand over to the project contractor or its entrusted agent. SY 5678—93 3.2 The contractor shall issue a completion notice to the relevant parties within 30 days after the completion of exploration and within 15 days after the completion of development. The project developer shall organize the handover and both parties shall go to the site for acceptance and handover. 3.3 During the period of handover and acceptance, if the provisions of the handover or the contract are not fulfilled and a dispute occurs, the contract management department or an arbitration institution recognized by both parties shall coordinate or arbitrate. 4 Projects and Contents 4.1 Drilling Quality 4.1.1 Drilling Quality Drilling inclination, drilling track, full angle change rate, bottom displacement, closing azimuth, and bullseye distance shall meet the drilling design requirements. 4.1.2 Fixing Quality 4.1.2.1 The difference between the casing and the structure shall meet the drilling design requirements. The casing running length error shall not exceed 0.5 thousandths. The number and depth of the short magnetic positioning casing are in accordance with the design requirements, and the error of the depth is not more than 10m. The casing can be smoothly passed to the artificial bottom with a standard diameter gauge: 4.1.2.2 The cement ring outside the casing is returned to the depth of the drilling equipment. The cement ring can effectively separate the moist, gas and water layers. 4.1,2.3 The distance between the bottom boundary of the next gas production layer and the artificial bottom is not less than 15m. The distance between the artificial bottom and the casing shoe is not less than 10m4.1.2.4 When the quality of the cement ring of the production layer is tested by acoustic oil, the sound amplitude value of no cement ring is 100%, and the relative value of the sound is within 30% as qualified cementation. Low-density water filtration is qualified as the relative value of the sound amplitude within 40%. 4.1.2.5 The casing test is carried out according to the SY5467 pipe string test pool. 4.1.2.6 The production layer casing test piece of the well with high acidic medium should be tested for water elimination according to the lowest value of the working pressure of the oil tree, the expected maximum shut-in pressure, and the internal resistance of the pipe string. The pressure should be stabilized for 30 minutes. If the pressure drop is not more than 0.5MPa, it is qualified. 4.1.2.7 The wellhead test is carried out with hot and compressed air. The pressure is 15MPa. It is qualified if there is no leakage. 4.2 Wellhead Completion Equipment China National Petroleum Corporation 1993--09--09 Approved 1994-03-01 Implementation SY5678-93 4.2.1 Well operation and high-pressure oil, gas, water and acidic medium oil and gas wells should be equipped with casing heads: low-pressure oil and gas wells should be equipped with simple casing heads. 4.2.2 The casing head and the production (gas) tree shall be installed in full, straight and firm according to the process design requirements, and its pressure level shall match the formation pressure. Acidic oil and gas shall be equipped with anti-sulfur wellheads. 4.2.3 The parallel port device shall be subjected to pressure sealing test. The test pressure shall be tested with clean water according to the lowest value of the three values of the maximum wellhead shut-in pressure, the rated working pressure of the parallel port device and the internal pressure strength of the production layer casing specified in the process design. The pressure shall be stabilized for 30 minutes, and the pressure drop shall not exceed 0.5MPa to be qualified. 4.2.4 The top surface of the flange on the production layer inspection pipe head shall not exceed 0.5m from the ground. 4.2.5 The opening without the oil (gas) tree shall be equipped with a wellhead cap or parallel port protection device at the upper end of the production layer casing, and a clear and pregnant mark shall be welded on the outer casing coupling. 4.2.6 A pressure relief control device that meets the requirements shall be installed in the annular space between the two layers of casing. 4.2.7 There shall be no seepage, gas or water inside or outside the completed well pipe. 4.3 Completion pipe string 4.3.1 The structure and strength of the oil pipe string shall meet the requirements of the process design. 4.3.2 The water limit of the pipe string shall be passed, the oil pipe diameter gauge can pass smoothly, and the testing instruments and pumping tools can be smoothly lifted and lowered. 4.3.3 When the packer is weakly completed, the packer barrier shall be reliable and meet the process design requirements. 44.3.4 The oil pipe shall be tested and corrected on the ground before it can be put into the well. The pressure test standard shall be approved according to the process design requirements. 4.4 Completion site and environmental protection 4.4.1 The completion site shall be kept basically flat, and the site shall be clean after the work is completed, meeting the requirements of oil testing, downhole operations and production construction. 4.4.2 The sewage discharge facilities at the opening site shall meet the relevant regulations on environmental protection. 4.4.3 The drilled and slurry in the filter pool shall be treated for pollution prevention or recycled. 4.5 Information The operating party or subcontractor shall provide the project contractor with the following relevant information: a. Drilling project history (including drilling project summary); b. Quality summary; c. Survey data; d. Land use certificate and pollution compensation documents; and, Drilling completion handover letter, see Appendix A (supplement). 2 Basic data Position coordinates, blood Xue Yueqi Well body state dance Depth and width, m (Technical) Maximum inclination Completion language day tour : Research and investigation angle SY5678—93 Appendix A Drilling and completion handover book (Supplement) Basic data Construction unit Well F phase Down to the depth Prevention of joint orientation Joint spraying, joint leakage, joint supplementary review, major joint accidents, complex situations: Haixia, m Geographic location Complete drilling depth, m Wuni return depth Yongping version length Complete drilling layer Amplitude quality Dry center distance Structural location Pressure test situation Maximum angle change rate Gold change A2 Joint body structure schematic diagram Joint body structure schematic diagram See Figure A1. Joint eye track section diagram Joint eye track section diagram See Figure A2. Surface casing Water mixing depth Technical management People T well bottom Niuchan Kenjun management Completion well depthwww.bzxz.net Figure A1 Non-body structure schematic diagram SY 5678-93 Xiao well section Vertical Huashen Closing position Strict displacement Figure A2 Lifting track profile A4 Completion wellhead device schematic diagram The schematic diagram of the completion wellhead device is shown in Figure A3. Tubing data table The tubing data table is shown in Table A2. SY 5678-93 Dead well wellhead device schematic diagram Table A2 Tubing data table Single pipe length Cumulative length Casing head Insert depth A6 Production layer casing data table Production layer casing data table is shown in Table A3. Handover and acceptance opinion table Handover and acceptance opinion table is shown in Table A4. $Y 5678--93 Production layer casing data sheet Single length Cumulative length Table A4 Handover and acceptance opinion sheet Position of flow blocking ring of empty production layer casing, m Position of manual bottom joint of production layer casing, m Wellhead test of production layer casing, MPa Quality evaluation of return joint of production layer dustpan No joint (joint quality evaluation) Casing compensation distance of production layer casing m Magnetic positioning short casing depth of production layer casing, m Non-field flat Whether the whole is qualified Whether the sewage discharge of the well site is qualified Whether there are legal objects under the well Whether the protection and expansion of the mouth and the marking are qualified Whether the inspection and handover are approved: Handover first, According to the well party: Signature of the handover party Handover date Signature of the handover party Depth of entry SY5678--93 Additional instructions: This standard is proposed by the Petroleum Drilling Engineering Standard Promotion Committee and is technically coordinated. This standard is drafted by the Drilling Department of Sichuan Petroleum Administration Bureau. The main authors of this standard are Sun Jingchun and Du Kezhi. 7 Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.