JGJ 73-1991 Specification for Construction and Acceptance of Building Decoration Engineering JGJ73-91

Basic Information

Standard ID: JGJ 73-1991

Standard Name: Specification for Construction and Acceptance of Building Decoration Engineering JGJ73-91

Chinese Name: 建筑装饰工程施工及验收规范JGJ73-91

Standard category:Construction industry industry standards (JG)

state:Abolished

Date of Implementation:1991-12-01

Date of Expiration:2002-03-01

standard classification number

Standard Classification Number:Engineering Construction>>Industrial and Civil Engineering>>P32 Building Structure and Decoration Engineering

associated standards

alternative situation:GBJ 210-83; replaced by GB 50210-2001

Publication information

other information

Introduction to standards:

JGJ 73-1991 Construction and Acceptance Specification for Building Decoration Engineering JGJ73-91 JGJ73-1991 Standard download decompression password: www.bzxz.net

Some standard content:

Industry Standard of the People's Republic of China
Specifications for Construction and Acceptance of Building Decoration Engineering
JGJ73-91
China Construction Information Network
1991 Beijing
Industry Standard of the People's Republic of China
Specifications for Construction and Acceptance of Building Decoration Engineering
JGJ73-91
Editor: Approval department of China Academy of Building Research, Ministry of Construction of the People's Republic of China Effective date: December 1, 1991
Chapter 1 General
Chapter 2 Plastering Engineering
Section 1 General Provisions
Section 2 Material Quality Requirements
Section 3
General Plastering
Section 4 Decorative plastering
Section 5
Project acceptance.··
Chapter 3 Door and window engineering
Section 1
Section 2
General provisions
Quality requirements for doors and windows
Section 3 Installation of aluminum alloy doors and windows·
Section 4 Installation of painted galvanized steel doors and windows
Section 5 Installation of steel doors and windows·
Section 6 Installation of plastic doors and windows
Section 7 Project acceptance
Chapter 4 Glass engineering
Section 1 General provisions
Section 2 Material quality requirements
Section 3 Installation of steel-wood frames, glass and glass bricks Section 4 Aluminum alloy pins||tt ||Wing material frame and fan glass installation?
Section 5
Project acceptance
Chapter 5 Suspended ceiling projectWww.bzxZ.net
Section 1 General provisions
Section 2 Material quality requirements
Section 3 Keel installation
Section 4 Gypsum board installation
Section 5 Other cover panel installation..
Section 6 Project acceptance…
Chapter 6 Partition project
Section 1
Section 2
Section 3
Section 4
General provisions
Material quality requirements.
Keel installation
Cover panel installation
Section 5 Gypsum strip board installation.
Section 6
Project Acceptance·
Chapter 7 Decorative Panel (Brick) Project**
Section 1
Section 2
Section 3
Section 4
General Provisions…
Material Quality Requirements
Decorative Panel Installation·
Decorative Brick Inlay
Section 5 Decorative Concrete Panel.
Metal Decorative Panel Installation
Section 6
Section 7
Project Acceptance
Chapter 8 Paint Engineering
Section 1 General Provisions
Section 3
Material Quality Requirements…
Section 3 Application of Concrete Surface and Plastered Surface Section 4 Wood Material surface coating
Section 5
Metal surface coating
Section 6
Art finishing
Section 7
Project acceptance
Chapter 9 Wallpapering Engineering
Section 1 General provisions
Section 2 Material quality requirements...
Section 3 Wallpaper and wall cloth wallpapering...
Section 4 Project acceptance.
Chapter 10 Slurry brushing engineering
Section 1 General provisions·
Section 2 Material quality requirements.
Section 3
Section 4
Chapter 11
Section 1
Section 2
Section 3
Section 4
Drama slurry·
Project acceptance
Decoration project
General provisions
Material quality requirements..…
Decoration installation
Project acceptance
Appendix 1
Common mix ratios (weight ratio) for polymer cement mortar spraying and spraying
Appendix 2
Appendix 3
Appendix 4
Appendix 5
Appendix 6
Common mix ratios of putty for glass engineering (weight ratio) Adhesive and putty mix ratios for repairing decorative panels (weight ratio) ..76
Common mix ratios of putty and moistening powder for coating engineering (weight ratio) Common mix ratios of putty for slurry brushing engineering (weight ratio) Explanation of terms used in this specification
Additional instructions|| tt||The editorial unit, participating units and main drafters of this specification are as follows: Construction Information Network
China Construction
Notice on the promulgation of the industry standard "Construction and Acceptance Specifications for Architectural Decoration Engineering"
Construction Standard [1991J366]
Construction committees (construction departments) of provinces, autonomous regions and municipalities directly under the central government, construction committees of cities with independent planning status, and relevant ministries and commissions of the State Council:
In accordance with the requirements of the State Planning Commission's Bidding Letter (1987) No. 78 and the Ministry of Urban and Rural Construction and Environmental Protection's (88) Chengbiaozi No. 141, the "Construction and Acceptance Specifications for Architectural Decoration Engineering" edited by the China Academy of Building Research has been reviewed and approved as an industry standard with the number JGJ73-91, which will be implemented on December 1, 1991. The "Construction and Acceptance Specifications for Decoration Engineering" (GBJ210-83) will be abolished at the same time. This standard is managed and explained by the China Academy of Building Research, which is responsible for the standard and technical management of construction engineering.
This standard is published by the Standard and Quota Research Institute of the Ministry of Construction. China Construction Information Network
Chapter I General Provisions
Article 1.0.1 This specification applies to the construction and acceptance of handicraft and civil building decoration projects.
Note: Decoration projects with requirements for anti-radiation, anti-corrosion, and fire prevention should be implemented in accordance with design requirements or relevant regulations.
Article 1.0.2 The materials used in decoration projects should be selected according to design requirements and should comply with the provisions of current material standards.
When there is doubt about the quality of the materials, sampling should be carried out and qualified materials can be used. Article 1.0.3 Mortar, lime pipes, glass, paint, etc. used in decoration projects should be processed and prepared in a centralized manner.
Article 1.0.4 Measures must be taken to prevent damage and deterioration of decorative materials, accessories, and components with facings during transportation, storage, and construction. Article 1.0.5 The grade and applicable scope of plastering, coating and slurry brushing projects shall meet the design requirements.
Article 1.0.6 The decoration project shall not be constructed until the quality inspection of the substrate or base is passed.
Article 1.0.7 Before the construction of high-end decoration projects, samples (samples or standard rooms) shall be made in advance, and they can only be carried out after being tested by relevant units. Whether samples are required for other grades of decoration projects shall be determined by the design.
Article 1.0.8 The construction of outdoor plastering and finishing projects shall generally be carried out from top to bottom. After high-level measures are taken, it can be carried out in sections. Article 1.0.9 The construction of indoor decoration projects shall wait until the roof waterproofing project is completed and It should be carried out under the condition that it will not be damaged or polluted by subsequent projects. When indoor plastering is carried out before the completion of roof waterproofing, protective grooves must be used.
Article 1.0.10 The construction of indoor ceilings, partition cover panels and floral decorations should be carried out after the indoor ground (floor) wet work is completed. Article 1.0.11 The construction sequence of indoor decoration projects should comply with the following provisions: plastering, finishing, ceiling and partition projects should be carried out after the partition walls, steel and wooden door and window frames, concealed pipes, wires, etc. 2. Steel-wood doors, windows and glass works can be carried out before wet work according to the regional climate conditions and the requirements of plastering works. 3. The decoration panel works, ceiling and light decoration installation works with plastering base should be carried out after the completion of the plastering process. 4. Paint, slurry painting, and installation of suspended ceilings and partition cover panels should be carried out before the construction of plastic floors, carpets, hardboards and other floor (floor) surface layers and exposed wires, and after the pressure test of pipeline equipment. The last coat of paint on the wooden floor (floor) surface layer should be carried out after the wallpapering work is completed: 5. Wallpapering work should be carried out after the painting and slurry painting of ceilings, walls, windows and building equipment is completed. 1.0.Article 12 The ambient temperature of indoor and outdoor decoration construction shall comply with the following provisions:
1. The temperature of slurry brushing, finishing and decoration process, as well as high-level plastering, solvent-based mixed color paint project should not be lower than 5℃,
2. The temperature of intermediate and ordinary plastering, solvent-based mixed color paint project, and glass project should be above 0℃;
3. The temperature of pasting should not be lower than 10℃,
4. When using adhesives, the temperature should be constructed according to the adhesive product instructions; 5. The temperature of varnish brushing should not be lower than 8℃, and the temperature of latex paint should be constructed according to the product instructions;
6. The temperature of lime slurry brushing outdoors should not be lower than 3℃C. Note: ① The ambient temperature refers to the lowest temperature at the construction site. ② The indoor temperature should be measured at a height of 500mm from the ground near the exterior wall. Article 1.0.13 The finished product protection of the decoration project must be done well, and the water used for construction and the water used for pressure testing of pipeline equipment shall not stain the decoration project. Article 1.0.14 The requirements for safety technology, labor protection, fire prevention, and poison prevention in the construction of decoration projects shall be implemented in accordance with the relevant national regulations in force. The materials should be stacked with attention to safety and fire prevention.
China Construction Information Network
Chapter II Plastering Project
Section 1 General Provisions
Article 2.1.1 This chapter applies to the construction and acceptance of general plastering and decorative plastering projects.
Article 2.1.2 The type of mortar used in plastering projects shall be selected according to the design requirements. If there are no design requirements, it shall comply with the following provisions: 1. Plastering of the outer walls of exterior door and window openings, eaves, plinths, and eaves walls - cement mortar or cement mixed mortar
3. Plastering mortar for rooms and workshops with high humidity;
3. Bottom layer plastering of concrete slabs and walls
or polymer cement mortar:
cement mortar or cement mixed
cement mixed mortar, cement mortar
4. Bottom layer plastering of silicate blocks, aerated concrete blocks and slabs - cement mixed mortar or polymer cement mortar,
5. Bottom and middle layer plastering of laths, metal mesh roofs and walls - hemp lime mortar or paper reinforced lime mortar.
Article 2.1.3 The mix ratio and consistency of plaster mortar shall be inspected and qualified before use.
Cement mortar and mortar mixed with cement or gypsum shall be used up before initial setting.
Article 2.1.4 When admixtures are added to mortar, the amount of admixtures shall be determined by test. Article 2.1.5 For plastering on the surface of the substrate where the wooden structure meets the masonry structure, concrete structure, etc., a metal mesh shall be laid and nailed first and tightened firmly. The overlap width between the metal mesh and each substrate shall not be less than 100mm.
Article 2.1.6 Before plastering, dust, dirt and oil stains on the surface of masonry, concrete and other substrates shall be cleaned and sprinkled with water to moisten. Article 2.1.7 For a flat and smooth concrete surface, if there is no design requirement, it can be treated with putty without plastering.
Article 2.1.8 Before plastering, the flatness of the base surface should be checked first, and the same mortar as the plastering layer should be used to set marks or marking bars. Article 2.1.9 Before plastering, check whether the steel and wooden door and window frames are in the correct position and whether the connection with the wall is solid. The gaps at the joints should be filled and compacted in layers with cement mortar or cement mixed mortar (with a small amount of hemp knife). Article 2.1.10 The positive corners of indoor walls, columns and door openings should be protected with 1:2 cement mortar. The height should not be less than 2m and the width on each side should not be less than 5mm. Article 2.1.11 Indoor plastering projects should be carried out after the installation of water supply, gas and other pipelines. Before plastering, the wall holes and floor slabs through which the pipelines pass must be filled and compacted. The wall plastering behind radiators and dense pipelines should be carried out before the installation of radiators and pipelines, and the joints of the plastering surface should be smooth.
Article 2.1.12 Before the construction of the exterior wall plastering project, the steel-wood door and window frames, balcony railings and embedded iron parts should be installed, and the construction holes on the wall should be blocked and dense. Article 2.1.13 For the exterior wall window sills, window awnings, balconies, pressure tops and protruding waistlines, etc., a water flow slope should be made on the top, and a drip line or drip groove should be made on the bottom (see Figure 2.1.13). The depth and width of the drip groove should not be less than 10mm and should be neat and consistent. Article 2.1.14 Before the plastering layer of various sand accumulations solidifies, it should be prevented from quick drying, water flushing, impact and vibration; after solidification, measures should be taken to prevent contamination and damage. Article 2.1.15 The plastering layer of cement mortar should be maintained under moist conditions. Article 2.1.16 In winter construction, insulation measures should be taken for plastering mortar. When applying, the temperature of the mortar should not be lower than 5℃.
Article 2.1.17 The mortar plaster layer shall not be frozen in the initial stage of hardening. When the temperature is below 5℃, the mortar used for outdoor plastering can be mixed with concrete antifreeze, and the amount of admixture shall be determined by test. Antifreeze containing chloride salts shall not be added to the plaster mortar for paint wall.
Species, bacterial accumulation
A, window hole
C, Zhicheng, balcony, opening
C. Awning, balcony eaves
Figure 2.1.13 Schematic diagram of water flow slope and drip line (groove) 1-water flow slope, 2-drip line 3-drip groove Article 2.1.18 During winter construction, heating measures can be taken to accelerate the drying of the plaster layer. If hot air is used, ventilation equipment should be installed to remove moisture. Section 2 Material Quality Requirements
Article 2.2.1 Lime is made by pouring block quicklime. When pouring, it must be filtered with a sieve with a pore size not greater than 3×3mm and stored in a sedimentation tank. The curing time is usually
not less than 15d: when used for covering, it should not be less than 30d. When used, the stored paste shall not contain uncured particles and other impurities. Article 2.2.2 The lime paste in the sedimentation tank shall be protected. Prevent it from drying, freezing and contamination.
Article 2.2.3 Lime paste used for plastering can be replaced by ground quicklime powder, the fineness of which should pass through a 4900 hole/cm2 sieve.Article 12 Before the construction of the exterior wall plastering project, the steel-wood door and window frames, balcony railings and embedded iron parts should be installed, and the construction holes on the wall should be blocked and dense. Article 2.1.13 For the exterior wall window sills, window awnings, balconies, pressure tops and protruding waistlines, etc., a water flow slope should be made on the top, and a drip line or drip groove should be made on the bottom (see Figure 2.1.13). The depth and width of the drip groove should not be less than 10mm and should be neat and consistent. Article 2.1.14 Before the plastering layer of various sand accumulations solidifies, it should be prevented from quick drying, water flushing, impact and vibration; after solidification, measures should be taken to prevent contamination and damage. Article 2.1.15 The plastering layer of cement mortar should be maintained under moist conditions. Article 2.1.16 In winter construction, insulation measures should be taken for plastering mortar. When applying, the temperature of the mortar should not be lower than 5℃.
Article 2.1.17 The mortar plaster layer shall not be frozen in the initial stage of hardening. When the temperature is below 5℃, the mortar used for outdoor plastering can be mixed with concrete antifreeze, and the amount of admixture shall be determined by test. Antifreeze containing chloride salts shall not be added to the plaster mortar for paint wall.
Species, bacterial accumulation
A, window hole
C, Zhicheng, balcony, opening
C. Awning, balcony eaves
Figure 2.1.13 Schematic diagram of water flow slope and drip line (groove) 1-water flow slope, 2-drip line 3-drip groove Article 2.1.18 During winter construction, heating measures can be taken to accelerate the drying of the plaster layer. If hot air is used, ventilation equipment should be installed to remove moisture. Section 2 Material Quality Requirements
Article 2.2.1 Lime is made by pouring block quicklime. When pouring, it must be filtered with a sieve with a pore size not greater than 3×3mm and stored in a sedimentation tank. The curing time is usually
not less than 15d: when used for covering, it should not be less than 30d. When used, the stored paste shall not contain uncured particles and other impurities. Article 2.2.2 The lime paste in the sedimentation tank shall be protected. Prevent it from drying, freezing and contamination.
Article 2.2.3 Lime paste used for plastering can be replaced by ground quicklime powder, the fineness of which should pass through a 4900 hole/cm2 sieve.Article 12 Before the construction of the exterior wall plastering project, the steel-wood door and window frames, balcony railings and embedded iron parts should be installed, and the construction holes on the wall should be blocked and dense. Article 2.1.13 For the exterior wall window sills, window awnings, balconies, pressure tops and protruding waistlines, etc., a water flow slope should be made on the top, and a drip line or drip groove should be made on the bottom (see Figure 2.1.13). The depth and width of the drip groove should not be less than 10mm and should be neat and consistent. Article 2.1.14 Before the plastering layer of various sand accumulations solidifies, it should be prevented from quick drying, water flushing, impact and vibration; after solidification, measures should be taken to prevent contamination and damage. Article 2.1.15 The plastering layer of cement mortar should be maintained under moist conditions. Article 2.1.16 In winter construction, insulation measures should be taken for plastering mortar. When applying, the temperature of the mortar should not be lower than 5℃.
Article 2.1.17 The mortar plaster layer shall not be frozen in the initial stage of hardening. When the temperature is below 5℃, the mortar used for outdoor plastering can be mixed with concrete antifreeze, and the amount of admixture shall be determined by test. Antifreeze containing chloride salts shall not be added to the plaster mortar for paint wall.
Species, bacterial accumulation
A, window hole
C, Zhicheng, balcony, opening
C. Awning, balcony eaves
Figure 2.1.13 Schematic diagram of water flow slope and drip line (groove) 1-water flow slope, 2-drip line 3-drip groove Article 2.1.18 During winter construction, heating measures can be taken to accelerate the drying of the plaster layer. If hot air is used, ventilation equipment should be installed to remove moisture. Section 2 Material Quality Requirements
Article 2.2.1 Lime is made by pouring block quicklime. When pouring, it must be filtered with a sieve with a pore size not greater than 3×3mm and stored in a sedimentation tank. The curing time is usually
not less than 15d: when used for covering, it should not be less than 30d. When used, the stored paste shall not contain uncured particles and other impurities. Article 2.2.2 The lime paste in the sedimentation tank shall be protected. Prevent it from drying, freezing and contamination.
Article 2.2.3 Lime paste used for plastering can be replaced by ground quicklime powder, the fineness of which should pass through a 4900 hole/cm2 sieve.