SY/T 0408-2000 Specification for construction and acceptance of pumping unit installation projects
Some standard content:
[CS 75.J80.10
Record number: 8131-2001
Petroleum and natural gas industry standard of the People's Republic of China
SY/T0408
Specification for construction and acceptance of pumping umits installation engincering20H-12-12 Issued
2001-K-1 Implementation
State Petroleum and Chemical Industry Bureau Issued
Petroleum and natural gas industry standard of the People's Republic of China Specification for construction and acceptance of pumping umits installation engincering elgincr.igSY/T0408--20H0
Editing unit: China National Offshore Oil CorporationApproving department: China Petroleum Science and Technology Publishing House
0Beijing
National Petroleum and Chemical Industry Publishing HouseDocument
National Chemical Policy (20) No. 445
Notice on the approval of two oil and gas industry standards such as the Regulations on Inspection of Shallow Sea Petroleum Facilities
China National Petroleum Corporation, China Petrochemical Corporation, China National Offshore Oil Corporation, Petroleum Industry Standardization Technical Committee: 1. The Regulations on Inspection of Shallow Sea Petroleum Facilities and other 52 oil and gas industry standard documents submitted by the Petrochemical Technical Committee for approval have been approved by the Bureau of Standardization and are now available. Standard name and number: Mandatory standard: Serial number Standard 1.SY 6500-2000 2.SY 6-2000 3.SY 62-20 4.SY 6503-2000 5.SY 6514-2000 6.SY 65(15-2000 7.SY 65K..-2000
Standard name
Honghai shale gas facility inspection regulations
Honghai shale gas operation radioactive and explosive materials safety regulations
Salt and life-saving equipment for seawater injection workers
Gas control and alarm equipment use pressure specification
Sewage seawater shale gas operation fluidized hydrogen protection safety regulations
Including gas outlet gas transmission safety regulations for enterprises tertiary industry all buried regulations implementation standards:
, standard generation
B.SY/TSUS9-2IKIU
V.SY/T 517- 20
10.SY/F 5150—2600
11.SY/T 5208—2000
12.SY/T 5216 -2WHI
13.5Y/T5236—24
14.$Y/T 5274---200
15.SY/T 527G—2000
16.SY/T 52872000
17.SY/T 5497- 20N
18.$Y/T 5641—2000
Standard Name
Insulation system micro-tube bundle oil elephant
(Replace SYT5059—91)
Detector combination soft cable
Y/5103—91)
Grading water leakage device
(Selling on behalf of SY5150—)
Oil well repair main fee exploration and lifting section equipment
(Replace SY 52-91,
$Y 5209—91,
SY 5210--913
Gage coring tool
Replace Y/1216-94
SY 5413-913
Qishan product hook
(replace SY3236-91)
resin coating city
replace SY 5274-1)
chemical breaking artificial heart flexural strength, anti-use strength and gas paint penetration determination
(replace SY$276-91)
(replace SY.3287-1. SY 5441-
petroleum industry material classification and code
replace S7549792
inquiry for atmospheric industry 99 series wide gas
engine replace SY641-
9.SY71 58772000
20.SY/E6178-2000
2F.SY/T 6184—20M
22.$Y 47920M
21.$7/T 6420M
24.9Y/64$1—20
25.SY/T 6N2. 2IM0
26.SY/1 6483--. 2IK
27.SY/T 64.. 2
28.SY/T 685--2000
29.SY/T 6486—2000
30.SY/1 6487---2000
31.SY/T 6488—200
32.SYT 6489—2000
33.SYT 690—202
34.5Y/1 6491
35.$r/1 6492
36.SY/1 6493 --2000
37.$Y/1 6494
38.SY/1 6497.-200U
SY7 6499200
Compensation slip wine and repair technical regulations
(Replace SY5877-93)
Water stagnation layer measurement data processing use analysis and production regulations
(Replace S/6178-.1996
Youshan card data index library table structure
(Replace SY/T6184--1996)
24-bit high-voucher overflow measurement earthquake rightsbzxZ.net
Seismic geophone, the first? Part
Direct current detector
Original high pressure physical property analyzer
Digital transmission visual tester
CNC measurement and data recording format
Gas lift well operation, maintenance and troubleshooting inspection recommended practices
Deep oil well equipment design and specification
Water injection well section must be station soil evaporation and micro-particle migration prevention process planning specification
Liquid one must be scientific practice
Oral, Well logging data processing and interpretation specification, horizontal well logging data processing and interpretation specification, rock logging parameters laboratory testing, perforation test and evaluation, general instrument installation technology, nuclear logging device value transfer program, oil and gas industry equipment reliability maintenance, static data acquisition and exchange, universal coupling for rock pool machine, 40.SY/T 65U7--2000
41.SY/T 4323--2000
42.$Y/1 0408—2000
43.SY/T 0429—2000
44.$Y/14457-2[A
4S.SYT 46820H)
46.SY/T 527120()
47.SY/T 5327—2000
48.SY/T 5374- 24KJ0
49.SYT 5346—2000
50.SYT 5437—2000
SI.SY/T 5547—2JD
52.SY/7 6498—2000)
In, standard
pressure inspection and elimination
line, repair and transformation
glass fiber insulation heat resistance machine fat pressure square pipeline tracking and inspection and modification specification
oil machine installation engineering construction modification and drive dam standard (replacement $4KJ8-93)
Shishan construction project quality inspection and evaluation standard drag oil class gas pipeline line engineering
(replacement SY4h29-97
quality pipeline rolling epoxy coating national defense commercial layer technical name
(replacement SY/T4057—93)
petroleum military equipment engineering love disk inspection and monitoring sweat pet standard push method separation flow pipe making
card point determination and explosion tree finger method
(replacement $Y 32/1—91)
Design method for fuel pipe strength
(Generation Y/5322-88)
How to use stone method before gas lifting
(Generation $Y/T5374--91)
Late inspection and transportation of non-oil casing
(Generation $Y 539--91.
SY 3577933
Basic technical requirements for interstitial fluid in new wells
(Generation $Y 543?--42)
Use, maintenance and management of screw-open drilling tools
(1fFenSY 5547--.92)
Electricity has been studied by many commercial instruments
The above standards are white 201 June 2000. Shandong Shishen Chemical Industry Bureau
November 12, 2000
This standard is based on the requirements of the foreign gas group public security (99) Le'an No. 34 document, Shanshou Guoxin Oil Dagangbo Oil and Gas Development Division and China Petroleum Daxi Company signed a project to revise the acceptance standard SY4008-3 of the Jieshan board facility. In the process of infiltration planning, you will compare the comprehensive list with the recognition points of the gradual research, summarize the practical experience of the winter oil field for many years. , and considered many domestic and foreign relevant standards: current regulations, carried out a review of the main technical content, added some technical indicators, and added oil cleaning and testing standards for oil machines: the standard is more practical. The main contents of this standard are: general information, preparation before installation, oil cleaning plan and inspection, installation, oil protection trial operation, engineering inspection, etc.
This standard is based on the number of years, minus the era 5Y4008. This standard is approved by the National Petroleum and Chemical Industry and is explained by the China Petroleum and Chemical Industry Department:
Compiler of this standard: China National Petroleum Corporation. Tester of this standard: China Petroleum Corporation. Technical Research Institute,
The main authors of this standard are Du Tiesheng, Zhang Hongyuan, Mao Hongbai, Liu Jiali
1 General provisions
2 Requirements and supervision of the combination of oil pumping units
2.1 Inspection and acceptance of single oil pumping units
3 Installation and inspection of pumping units
4 Installation of oil pumping units Slurry
Stripping block enough
+2 installation·
5 Selection and operation of single pump
6 Turnover acceptance.
Attachment: Collection and on-site handover
Standard words and terminology explanation
Attachment: Pumping pool planning pump installation project site construction and inspection version sample description 2
1.0.1 In order to guide the construction and acceptance of the pumping unit installation project and ensure the installation and safety of the pumping unit, this sample is specially formulated,
「.0.1 This specification is applicable to the installation of ten-beam type pumps. Implementation! 1.0.3 In addition to the provisions of this specification, the construction of the city gas shall also comply with the provisions of the electrical installation engineering (GB50254) 1.0.4 The requirements of science, safety, environmental protection and fire prevention during the construction process shall comply with the provisions of the current national standards, laws and regulations. 2 Preparation before installation of the pumping unit
2.L Requirements and acceptance of the Christmas tree and well site
2.1.1 The donor shall provide a written statement of the pumping unit type, installation method and stroke of the pumping unit before installation. 3.1.2 The existing parts of the Christmas tree shall be intact, and the head elevation and handwheel tide shall meet the design requirements. Check that the pipe head and the parallel port device are firmly connected. 2.1.3 The vertical deviation of the oil tree should be less than 3mm. 1.1.4 The oil tree should not have leakage, etc. 2.1.5 The site should be complete and meet the on-site construction conditions. 2.1.6 After inspection by the design unit and the construction unit, the oil tree and the site handover acceptance form should be filled in and the handover procedures should be handled. The site handover acceptance form should comply with the regulations of the vehicle regulations.
2.2 Inspection and acceptance of the oil pump
2.2.1. After the oil pump arrives, there should be a delivery note, and the construction unit should participate in the inspection and acceptance of the oil pump.
2.2.2 During the inspection and acceptance, the following inspections shall be conducted: 1. The equipment shall be in good condition;
2. Packing materials and technical documents shall be complete; 3. Check the model and assembly number of the pumping unit;
4. Check according to the packing list, and the parts shall be complete, and there shall be no damage, corrosion, etc.
2.2.3 After the inspection and acceptance, the equipment inspection and acceptance records shall be carefully recorded, and the inspection and acceptance procedures shall be completed.
3. Construction and inspection and acceptance of the pumping unit foundation
3.1. The foundation must be sufficient to support and stabilize the pumping unit: When calculating the working load, the total weight of the pumping unit foundation and the operating load of the pumping unit shall be fully considered. 3.0.2 The foundation must be built on the original foundation. The fill ground should be excavated below the old layer. 3.0.3 When filling the ground, it must be compacted. The density of the substance must not be less than the first: the soil. The ratio of cement to cement should be 3:7. The density after compaction should not be less than 1.55. Sand or small sand should not be placed on the foundation. The thickness should not be less than 5cm. 3.0.4 According to the site record, the foundation of the pumping unit shall be a prefabricated steel foundation or an existing foundation. The foundation must be constructed according to the specifications and drawings provided by the pumping unit manufacturer. The requirements of Table 3.0.5 shall be met. 3.0.5 The prefabrication and installation of the pumping unit foundation shall meet the requirements of Table 3.0.5. 3.6 The strength and composition of the steel concrete shall meet the design requirements.
Attachment: Collection and on-site handover
Standard terms and phrases
Attachment: Sample text on site construction and inspection of pump installation project 2
1.0.1 In order to guide the construction and acceptance of pump installation engineering and ensure the safety of pump installation, this specification is specially formulated.
「.0.1 This specification is applicable to the installation of ten-beam type pumps. 1.0.3 In addition to the provisions of this specification, the construction shall also comply with the provisions of the electrical installation engineering low-positive electrical installation standard (GB50254) 1.0.4 The requirements of science, safety, environmental protection and fire prevention during the construction process shall comply with the provisions of the current national standards, laws and regulations. 2 Preparation before pump installation||tt ||2.1.1 The contractor shall provide written instructions on the type, size and stroke of the pumping machine before installation. 3.1.2 The existing parts of the Christmas tree shall be intact, the head elevation and handwheel height shall meet the design requirements, and the pipe head and the parallel connection device shall be checked and firmly connected. 2.1.3 The vertical deviation of the Christmas tree shall be less than 3mm. 2.1.4 The Christmas tree shall not have leakage and other problems. 2.1.5 The well site shall be in good condition and meet the on-site construction conditions. 2.1.6 After inspection by both the design unit and the construction unit, the handover acceptance form of the Christmas tree and the well site shall be filled in and the handover procedures shall be handled. The acceptance form of the well site shall comply with the regulations of the vehicle specification.
2. 2 Inspection and acceptance of the oil pump
2.2.1. After the oil pump arrives, there should be a delivery note, and the contractor should participate in the inspection and acceptance of the oil pump.
2.2.2 During the inspection and acceptance, the following checks should be carried out: 1. The equipment should be in good condition;
2. The packing materials and technical documents should be complete; 3. Check the model and assembly number of the oil pump;
4. Check according to the packing list, and the parts should be complete, without damage, rust and other pits.
2.2.3 After the inspection and acceptance, the equipment inspection and acceptance record should be carefully recorded, and the handover procedures should be completed.
3 Construction and inspection and acceptance of the oil pump foundation
3.1 The foundation must be sufficient to support and stabilize the pump: When the load is greater than 30%, the total weight of the pumping unit foundation should be considered. 3.0.2 The foundation must be in accordance with the original seven, the filling ground should be excavated below the vein layer,
3.0.3 When filling the ground, it must be compacted, and the density of the material must not be less than the first: the cement, the cement ratio should be 3:7, and the weight after compaction should not be less than 1.55. The foundation should be leveled with sand or small grinding, and the thickness should not be less than 5cEl3.0.4 According to the field record, the pumping unit foundation shall be a prefabricated steel foundation or an existing foundation. The foundation must be constructed according to the specifications and drawings provided by the pumping unit manufacturer, and the requirements of Table 3.0.5 shall be met. 3.0.5 The prefabrication and installation of the pumping unit foundation shall be in accordance with the requirements of Table 3.0.5. 3. The strength and distribution of the core 6 steel concrete meet the design requirements and relevant technical data
Attachment: Collection and on-site handover
Standard terms and phrases
Attachment: Sample text on site construction and inspection of pump installation project 2
1.0.1 In order to guide the construction and acceptance of pump installation engineering and ensure the safety of pump installation, this specification is specially formulated.
「.0.1 This specification is applicable to the installation of ten-beam type pumps. 1.0.3 In addition to the provisions of this specification, the construction shall also comply with the provisions of the electrical installation engineering low-positive electrical installation standard (GB50254) 1.0.4 The requirements of science, safety, environmental protection and fire prevention during the construction process shall comply with the provisions of the current national standards, laws and regulations. 2 Preparation before pump installation||tt ||2.1.1 The contractor shall provide written instructions on the type, size and stroke of the pumping machine before installation. 3.1.2 The existing parts of the Christmas tree shall be intact, the head elevation and handwheel height shall meet the design requirements, and the pipe head and the parallel connection device shall be checked and firmly connected. 2.1.3 The vertical deviation of the Christmas tree shall be less than 3mm. 2.1.4 The Christmas tree shall not have leakage and other problems. 2.1.5 The well shall be in good condition and meet the on-site construction conditions. 2.1.6 After inspection by both the design unit and the construction unit, the handover acceptance form of the Christmas tree and the well shall be filled in, and the handover procedures shall be handled. The acceptance form of the well shall comply with the regulations of the vehicle specification.
2. 2 Inspection and acceptance of the oil pump
2.2.1. After the oil pump arrives, there should be a delivery note, and the contractor should participate in the inspection and acceptance of the oil pump.
2.2.2 During the inspection and acceptance, the following checks should be carried out: 1. The equipment should be in good condition;
2. The packing materials and technical documents should be complete; 3. Check the model and assembly number of the oil pump;
4. Check according to the packing list, and the parts should be complete, without damage, rust and other pits.
2.2.3 After the inspection and acceptance, the equipment inspection and acceptance record should be carefully recorded, and the handover procedures should be completed.
3 Construction and inspection and acceptance of the oil pump foundation
3.1 The foundation must be sufficient to support and stabilize the pump: When the load is greater than 30%, the total weight of the pumping unit foundation should be considered. 3.0.2 The foundation must be in accordance with the original seven, the filling ground should be excavated below the vein layer,
3.0.3 When filling the ground, it must be compacted, and the density of the material must not be less than the first: the cement, the cement ratio should be 3:7, and the weight after compaction should not be less than 1.55. The foundation should be leveled with sand or small grinding, and the thickness should not be less than 5cEl3.0.4 According to the field record, the pumping unit foundation shall be a prefabricated steel foundation or an existing foundation. The foundation must be constructed according to the specifications and drawings provided by the pumping unit manufacturer, and the requirements of Table 3.0.5 shall be met. 3.0.5 The prefabrication and installation of the pumping unit foundation shall be in accordance with the requirements of Table 3.0.5. 3. The strength and distribution of the core 6 steel concrete meet the design requirements and relevant technical data