title>HG/T 2595-1994 Zinc yellow, iron red perchlorethylene primer - HG/T 2595-1994 - Chinese standardNet - bzxz.net
Home > HG > HG/T 2595-1994 Zinc yellow, iron red perchlorethylene primer
HG/T 2595-1994 Zinc yellow, iron red perchlorethylene primer

Basic Information

Standard ID: HG/T 2595-1994

Standard Name: Zinc yellow, iron red perchlorethylene primer

Chinese Name: 锌黄、铁红过氯乙烯底漆

Standard category:Chemical industry standards (HG)

state:in force

Date of Release1994-03-17

Date of Implementation:1995-01-01

standard classification number

Standard ICS number:Paint and pigment industry >> 87.040 Paints and varnishes

Standard Classification Number:Chemicals>>Coatings, Pigments, Dyes>>G51 Coating

associated standards

alternative situation:ZB G51065-87

Publication information

publishing house:Chemical Industry Press

Publication date:1995-01-01

other information

drafter:Fang Beili, Liu Jiyuan, Fei Jinhao

Drafting unit:Shanghai Paint Factory, Paint Research Institute of Ministry of Chemical Industry

Focal point unit:National Technical Committee for Standardization of Paints and Pigments

Proposing unit:Technical Supervision Department of the Ministry of Chemical Industry of the People's Republic of China

Publishing department:Ministry of Chemical Industry of the People's Republic of China

Introduction to standards:

This standard specifies the technical requirements, test methods, inspection rules, marking, packaging, transportation, storage, safety, hygiene and environmental protection requirements of zinc yellow and iron red perchloroethylene primers. This standard applies to zinc yellow perchloroethylene primers prepared from perchloroethylene resin, alkyd resin, plasticizer, pigment extender pigment and mixed organic solvent. HG/T 2595-1994 Zinc yellow and iron red perchloroethylene primers HG/T2595-1994 Standard download decompression password: www.bzxz.net

Some standard content:

Chemical Industry Standard of the People's Republic of China
HG/T2595-94
Zinc Yellow and Iron Red Perchloroethylene Primer
Published on March 17, 1994
Ministry of Chemical Industry of the People's Republic of China
Implemented on January 1, 1995
Chemical Industry Standard of the People's Republic of China
Zinc Yellow and Iron Red Perchloroethylene Primer
1 Subject Content and Scope of Application
HG/T2595-94
Replaces ZBG51065-87
This standard specifies the technical requirements, test methods, inspection rules, marking, packaging, transportation, storage and safety, sanitation and environmental protection requirements of zinc yellow and iron red perchloroethylene primer.
This standard applies to zinc yellow perchloroethylene primer prepared from perchloroethylene resin, alkyd resin, plasticizer, pigment, extender pigment and mixed organic solvent.
Referenced standards
GB/T1727 General preparation method for paint film
GB/T1728 Determination of drying time of paint film and putty filmGB/T1763 Determination of chemical resistance of paint filmGB3186 Sampling of coating products
GB/T5208 Determination of flash point of coatingsRapid equilibrium methodGB/T6742 Bending test of paint film (cylindrical shaft)GB/T6751 Determination of volatile and non-volatile matter in paints and varnishesGB/T6753.4 Determination of flow time of coatingsISO flow Measuring cup method GB/T9271 Standard test plate for paints and varnishes
GB9278 Temperature and humidity for condition adjustment and testing of paint samples GB/T9286 Cross-cut test for paint and varnish films GB/T9750 Packaging mark for coating products
GB/T9761 Paints and varnishes Visual colorimetry of paints 3 Product classification
Type I: Zinc yellow perchlorethylene primer
Type I: Iron red perchlorethylene primer
4 Technical requirements
The products shall meet the technical requirements listed in Table 1. Approved by the Ministry of Chemical Industry of the People's Republic of China on March 9, 1994 and implemented on January 1, 1995
Item W.
Coating color and appearance
Flow time, s
Non-volatile matter content, %
Drying time, min
Bending test, mm
Cross-cut test, grade
Salt water resistance
Zinc yellow (48h)
Iron red (24h)
Composite coating acid resistance (30d)
Composite coating alkali resistance (20d)
Flash point, ℃
5Test method
5.1 Test conditions
Not less than
Not greater than
Not greater than
Not greater than
Not less than
HG/T2595-94
Zinc yellow, variable color, smooth paint film, no coarse particles
Iron red, variable color, smooth paint film, no coarse particles35~100
No blistering, no rust, slight discoloration allowed60
No blistering, no rust, slight discoloration allowedNo blistering, no falling off
No blistering, no falling off
5.1.1 The state adjustment and temperature and humidity of the test shall be carried out in accordance with the provisions of 3.1 of GB9278. 5.1.2 Unless otherwise specified, the test plate shall be tested in accordance with the provisions of 4 in GB/T9271. 5.1.3 Preparation of paint film shall be carried out in accordance with the provisions of 6.2 and 6.3 in GB/T1727 according to the test requirements. 5.1.4 Unless otherwise specified, the thickness of paint film shall be carried out in accordance with the provisions of 9 in GB/T1727. 5.2 Color and appearance of paint film
shall be carried out in accordance with the lighting conditions in 3 in GB/T9761. 5.3 Flow out timebzxz.net
shall be carried out in accordance with the provisions of No. 6 cup in 3.4 in GB/T675. 5.4 Non-volatile content
shall be carried out in accordance with the provisions of GB/T6751, the test temperature shall be 85~90℃, and the time shall be 3h. 5.5 Drying time
shall be carried out in accordance with the provisions of Method A in GB/T1728. 5.6 Bend test
shall be carried out in accordance with the provisions of GB/T6742.
5.7 Cross-cut test
Perform according to the provisions of GB/T9286. The cutting spacing is 1mm and the number of cuts is 6.5.8 Salt water resistance
5.8.1 Test substrate and treatment shall be carried out according to the provisions of 3 in GB/T9271. 5.8.2 Preparation of the sample shall be sprayed once according to the provisions of 6.2 in GB/T1727, and after the surface is dry, it shall be dried at 60±2℃ for 1h, taken out and cooled to room temperature, and then sprayed with the second coat, and then dried for 48h under the environmental conditions specified in GB9278 before testing. The total thickness of the paint film is 45±5μm.
W.HG/T2595-94
5.8.3 Perform according to the provisions of Method A in 3.1 in GB/T1763. 5.9 Acid resistance of composite coating
5.9.1 Preparation of substrate
Take 3 cylindrical steel bars with a length of about 100±2mm and a diameter of about 1315mm, one end of which is oval and the other end should have a small hole for hanging. According to the provisions of 3.4 of GB/T9271, grind and remove rust, clean and dry the test bars for use. 5.9.2 Preparation of paint film
According to the provisions of 6.3 of GB/T1727 for dip coating, apply one layer of zinc yellow or iron red perchloroethylene primer, two layers of perchloroethylene anticorrosive paint of various colors and one layer of perchloroethylene anticorrosive varnish. After each dip coating, dry it at 60-65℃ for 1h, take it out, cool it and invert it 180° before dipping the next layer. The total thickness of the paint film is between 70±10um. If the composite coating does not reach the specified thickness, it should be supplemented by dip coating of varnish. The drying time is the same as above. Finally, dry at 60-65℃ for 2h, take out and cool, then dip the oval end of the rod in 5mm long paraffin wax, and then hang it for 48h under the test conditions in accordance with 5.1.1 for testing. 5.9.3 Hang 2/3 of the area of ​​the three test rods prepared under 5.9.2 in a dryer filled with 25% sulfuric acid solution, and cover the dryer tightly. After placing it for 30d under the test conditions in accordance with 5.1.1, take out the test rods, wash them carefully with clean water, wipe them dry, and observe the coating results. At least 2 test rods that meet the requirements of the product standard are qualified. 5.10 Alkali resistance of composite coating
Prepare the paint film under the same conditions and methods as 5.9, then hang 2/3 of the area of ​​3 test bars in a dryer containing 40% sodium hydroxide solution, cover the dryer tightly, place under the test conditions of 5.1.1 for 20 days, take out the test bars, wash them carefully with clean water, wipe them dry and observe the coating results, and at least 2 test bars meet the requirements of the product standard. 5.11 Flash point
Perform according to the provisions of 5.2 of GB/T5208.
6 Inspection rules
6.1All technical requirements listed in this standard are type inspection items. The three items of composite coating acid resistance, composite coating alkali resistance and flash point shall be inspected at least once a year, and the rest are factory inspection items, and each batch must be inspected. 6.2 The product shall be inspected by the quality supervision and inspection department of the manufacturer in accordance with the provisions of this standard. The manufacturer shall ensure that all products leaving the factory meet the technical requirements of this standard. The product shall have a certificate of conformity and, if necessary, instructions for use and precautions. 6.3 The receiving department has the right to inspect the product in accordance with the provisions of this standard. If the product quality is found to be inconsistent with the technical indicators of this standard, the supplier and the buyer shall jointly resample and retest in accordance with the provisions of GB3186. If the result still does not meet the technical indicators of this standard, the product shall be judged as unqualified and the receiving department has the right to return the product.
6.4 The product shall be sampled in accordance with the provisions of GB3186. The sample shall be divided into two parts, one for sealed storage for future reference and the other for inspection. 6.5 The supplier and the buyer shall check and verify the packaging, quantity and marking of the product. If the packaging is damaged or the quantity is inconsistent, the relevant departments shall be notified in a timely manner.
6.6 When the supplier and the buyer have a dispute over product quality, they may entrust a unit or product quality supervision and inspection agency agreed by both parties to conduct arbitration inspection.
7 Marking, packaging, transportation, storage
7.1 Marking
Perform in accordance with the provisions of GB/T9750.
7.2 Packaging
The product should be packaged in a clean, dry, sealed container, and the contents should occupy 90% to 95% of the container volume. 7.3 Transportation
The product should be protected from rain and sunlight during transportation, and should comply with the relevant regulations of the transportation department. 7.4 Storage
W.bzsoso.cOmHG/T2595—94
The product should be stored in a cool, dry, ventilated warehouse, and protected from direct sunlight, isolated from fire sources, and away from heat sources. The product should be stored in accordance with 7.2 and 7.3 storage and transportation conditions, the effective storage period is calculated as one year from the date of completion of production. Safety, hygiene, environmental protection
This product contains organic solvents such as benzene, esters, ketones, etc., which are flammable, explosive and toxic substances. The construction site of this product should take safe and effective measures such as ventilation, fire prevention, anti-static, and anti-poisoning, and comply with the safe operating procedures and relevant regulations for coating operations.
WW.bzsoso.cOmA1This product can be applied by spraying or brushing. HG/T2595—94
Appendix A
Construction reference
(reference)
A2Dilution with X-3 perchloroethylene diluent during construction. If the construction is carried out in an environment with a relative humidity greater than 70%, an appropriate amount of F-2 perchloroethylene moisture-proof agent should be added to prevent the paint film from turning white. A3 Matching requirements: It can be matched with various perchloroethylene topcoats (magnetic paint, varnish, anticorrosive paint, hammer paint) and perchloroethylene putty. A4
If the product exceeds the storage period, it can be retested according to the technical requirements specified in this standard. If the results meet the requirements, it can still be used. Maximum allowable concentration of toxic substances in the air of the construction site and fire safety parameters: Name
Butyl acetate
Additional instructions:
Molecular formula
CH:COOCH.
CH:COCH3
Flash point, ℃ (closed)
Explosion limit, %
This standard is proposed by the Technical Supervision Department of the Ministry of Chemical Industry of the People's Republic of China. This standard is under the jurisdiction of the National Technical Committee for Standardization of Paints and Pigments. This standard was drafted by Shanghai Paint Factory and the Paint Research Institute of the Ministry of Chemical Industry. The main drafters of this standard are Fang Beili, Liu Jiyuan and Fei Jinhao. Maximum allowable concentration in air, mg/m
Wbzsoso, cO
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.