title>SL 299-2004 Regulations for geological surveying and mapping of water conservancy and hydropower projects - SL 299-2004 - Chinese standardNet - bzxz.net
Home > SL > SL 299-2004 Regulations for geological surveying and mapping of water conservancy and hydropower projects
SL 299-2004 Regulations for geological surveying and mapping of water conservancy and hydropower projects

Basic Information

Standard ID: SL 299-2004

Standard Name: Regulations for geological surveying and mapping of water conservancy and hydropower projects

Chinese Name: 水利水电工程地质测绘规程

Standard category:Water Conservancy Industry Standard (SL)

state:in force

Date of Release2004-05-12

Date of Implementation:2004-08-01

standard classification number

Standard ICS number:Civil Engineering >> 93.020 Earthwork, excavation, foundation construction, underground engineering

Standard Classification Number:Engineering Construction>>Engineering Survey and Geotechnical Engineering>>P13 Project Address, Hydrogeological Survey and Geotechnical Engineering

associated standards

alternative situation:Replaces SDJ 15-1978

Publication information

publishing house:China Water Resources and Hydropower Press

Publication date:2004-08-01

other information

drafter:Gao Yusheng, Zhao Zhenhai, Jia Guochen, Li Yanpo, etc.

Drafting unit:Tianjin Water Conservancy and Hydropower Survey and Design Institute of Ministry of Water Resources

Publishing department:Ministry of Water Resources of the People's Republic of China

competent authority:Ministry of Water Resources

Introduction to standards:

This code is applicable to all types of geological surveying and mapping work for water conservancy and hydropower projects. SL 299-2004 Code for geological surveying and mapping for water conservancy and hydropower projects SL299-2004 Standard download decompression password: www.bzxz.net

Some standard content:

Water conservancy industry standard of the People's Republic of China
SL 2992004
W$5mI :5-78
Code of geological mapping for water conservancy and hydrupuwer engineering
2004-05-12 released
2004-08-01 implemented
The Ministry of Water Resources of the People's Republic of China released
The Ministry of Water Resources of the People's Republic of China
Regarding the "Regarding the approval and release of small-scale hydropower engineering visual independent quality surveying and mapping regulations S.29S2004", all the above-mentioned
Water Resources National 4
List of the names of various regions, households, and water resources (Water Affairs) Bureau (), the Philippine Union Production and Construction Association (Yongwu) Trade, the Philippine Union Production and Construction Association, the National Development and Reform Commission, and the State Council's * Chengjing Feng: approved the water conservancy and hydropower engineering surveying and mapping regulations for the year: detailed in the release. The standard number is S.29. This standard can be implemented from March 1, 2001. The standard text is published by China Water Resources and Hydropower Engineering Bureau on October 1, 2001. The Ministry of Water Resources and Hydropower Planning and Design Management Bureau of Water Resources and Hydropower Engineering Technology Bureau handed over the technical standard of 2001. The main filter list of the month is the main filter list of the month. The standard of water conservancy and hydropower engineering is compiled by the standard. 1-2, the water conservancy and hydropower engineering survey and planning process: a total of 8 rates and 10 appendices, ten major technical inspections are: the scope of application of this standard is established: the working standards of the survey and mapping of water conservancy and hydropower engineering, the procedures, work content, survey and mapping, and the technical principles to be followed are unified: see! 1. Define the contents of surveying and mapping of various geological phenomena; specify the requirements for the properties and test of the results; the revised contents of 51578 are as follows:
Liu Jie will retrograde, thank you
added T 2. Nan Gong:
added terms:
such as basic provisions for the content of relevant data and test, added the contents of geomorphological survey in the river area, added the contents of geomorphological survey in the frontier area, flat landform survey, loess karst, etc.:
added records and clauses:
revised the original regulations, preparation work, field properties, and data management contents;
removed the "different forces" in the regulations The full text of this regulation is recommended:
The calendar collection of this regulation is
SD11578
This regulation is approved by 1: Ministry of Water Resources of the People's Republic of China. The main organization of the regulation: Water Resources and Hydropower Planning and Design Institute of the Ministry of Water Resources. The main interpretation position: Water Resources and Hydropower Planning and Design Institute of the Ministry of Water Resources. The main editor of this regulation is Tianjin Water Resources and Hydropower Survey and Design Institute of the Ministry of Water Resources. Issuing unit: China Water Resources and Hydropower Press
The main initiators of this regulation: Gao Yusheng, Yue Hai, Jia Guochen, Liu Manjie, Zhang Huaijun, Zhang Zhiheng
Song Zizhuang, Xinrong, Yang Jishen
The main person in charge of this regulation is: Chen De. The main person in charge of the basic structure will be: Pang Yisongbianmu
? Terminology
3 meter car regulations
preparation 1 standard
international electricity survey results
strong source of geological survey
energy standard adjustment
connection to make full use of the adjustment
6.1 geological depth Kezhou San
5.5 hydrogeological closure
5.5 structural geological system questions to
5.7 customer cases
5-SH geological
data control and sorting
6 data inspection|| tt||Opening record A
Name survey price section engineering pool quality surveying proportion child training quality survey meeting technical regulations
Appendix B
[Job ratio quality aging urgent relatives insurance retirement classification
T. Geological continent final operation log format
Earth mirror plastic classification
Sedimentary, volcanic debris (volcanic debris), metamorphic sheet classification·Appendix F
Attachment HWww.bzxZ.net
Common non-central external identification and identification
Two intercropping external system collection and naming
Research record! 1.2 This document is applicable to various types of water conservancy and hydropower engineering projects. 1.3 Water conservancy and hydropower engineering geological surveying and mapping is the basic work of water conservancy and hydropower engineering projects. The task of geological surveying and mapping is to accumulate various technical data related to hydropower construction, analyze their quality laws, provide basic research data on geological environment for the completion of engineering projects and provide a basis for safety exploration and testing of light machinery.
1.,4 Water conservancy and hydropower project energy quality surveying and mapping should be carried out according to the nature of the project and the geological conditions that are different from the second protection. The case is solved by comprehensive analysis and application of geological theory and technical methods.
10.5 The referenced standards are:
Hydropower Geological Specifications)
Small and Medium-sized Hydropower Engineering Geological Assistance Standard 3 (SI.55) "Small Hydropower Engineering Map Standard 31%1.73
Hydraulic Engineering 1. Survey Specification (:9)
Small Hydropower Engineering Natural Gas Pure Planning Code: (51)
Hydraulic Engineering Secondary Engineering Geological Survey Specifications? SD%) In addition to the non-standard hydropower project drawings, the relevant standards of the project are also drawn.
2.0.1 Engineering Geological Survey
engineering geological mapping uses other theories and techniques to survey, investigate and describe the various geological phenomena in the project area, and make a non-recognition work on the topographic map. 2.0.2 Comprehensive Stratigraphic Column Map
general stratigrapkic map Comprehensively reflect the age, layer, connection, origin, and various characteristics of the area.
2.0.3 Key Bed
key bed
The survey area has special signs, which are easy to identify and use to unify the site layers and different groups of layers.
2.0.4 Geological point
gcojogi:l uh-:rvntia spot
The basic working point for observing and studying geological phenomena outside the kidney, 2.05 Geological route
geological abaeutiu: rite
The working route for studying geological phenomena outside the continent,·Share is the connection between the geological points in various places.
2-Non-6 wind system
Rcokogizl ske1cl:
Then record the pool phenomenon in the way supported
2.0. The previous state geological
eagimpringgologicalmap
Reflects the characteristics of each city and geological phenomena in the project area and their relationship with the workers' cabinet. Map
2.0. The previous geological agent map
cigiutrtinyenlegical weution represents the relationship between the land and the project plan and the drawings:
2.0.9 Geological consultation
geolagieal remoto wamring
The geological survey is carried out by using the net sensing image technology. 3
3 Basic provisions
3.0.11 The geological age measurement of materials should be based on the case or surveying and mapping service and the measurement and preparation work should be carried out before the project is completed.
3.2 The project product measurement should be carried out in accordance with the workpiece, measurement system, data collection, and material inspection procedures.
3.(.3 The geological survey and compensation scale 5 should be classified as follows: scale s1:
medium 1:us+ 5000:
3.0.4 The quality of each project shall be signed in accordance with the provisions of 3027 or above. The scale selection is not implemented in accordance with the plan. The second is to ensure the quality of the final pool of quality points, and the third is to describe and analyze the organic relationship between points, lines, surfaces and centers. The main scale of the survey will be selected based on the age of the survey. The survey will be guided by the surveying and mapping, and the survey results will be verified, supplemented, and revised.
3.0.6 Engineering geological survey route is a medium and small scale geological survey. The geological synaesthesia technology is adopted. The comprehensive sensing technology of the North Defense is implemented in accordance with the provisions of Appendix H of the Technical Specifications 3.0.7. When geological maps are available, they should be inspected and verified if necessary. The geological structure and terrain can be complicated and large, and the topography can be measured based on the case. The external environment should be standardized to ensure the safety of the company. When working in dangerous areas, the company should arrange internal safety measures. 4. Preparation work! The completion of the work package includes the following: preparation of the following documents, 1.1.2 Collection of data, 2.1.3 Collection of geological data, 3.0.2 Preparation of survey plan for the area: 4.0.3 Collection of geological data on site, 4.0.4 Collection of atmospheric characteristics, 1.1.2 Collection of equipment and equipment, 2.1.3 Micro-survey and control data, 3.1.3 Land survey and control data, 4.0.3 Geological data, 5.0.4 Local topography, seismic data, and geological data, 4.0.5 Hydrological and gas resource network. 5.1.4 "Resources, forest resources, cultural relics and ecological environment protection expansion plan!" 1. The data collected shall be stored in the same form as the data collected, and the relevant tables and tables shall be prepared. For the new image data, it is necessary to use optical digital graphics processing
In the comprehensive analysis and enterprise data analysis, the K44 real-time geological survey map is carried out on the spot, and the K44 real-time geological survey map is carried out on the spot, and the geological environment planning is carried out, and the geological planning is carried out, and the planning of the stratum is selected, and the planning and inspection of the stratum is prepared, and the work of the city is formulated. The route should be selected in the site: non-representative sections, non-quality construction, engineering quality, new books, protection requirements, 4.0.5
Data: field road dynamic film model, editing company: for the content of the space: survey, service cost, geological overview, work content and storage, work plan, delivery, quality assurance, payment and personnel, work equipment, safety support, etc. 5
5 Basic requirements for field geological surveying and mapping
S.0.1 The following basic requirements are carried out step by step: geological core survey and external mapping
2, marking the survey points and geological lines. 3. Draw the site map.
4 Typical clear continent quality measurement basis
5.0.2-1 The terrain reading of the continental quality map should meet the requirements of the Taiwan Zhuan Safety Administration or be greater than the quality measurement hazard ratio. When adopting the large-scale quality measurement example, the actual geological survey specifications should be produced during the construction, and the control rate should meet the requirements of the three-way pool quality measurement, and meet the individual 3119? 5. The center 3 is marked with a stratum scan (if there is a stratum original map available, it should be completed through verification), and the slope map should be determined, and the whole south demarcation should be carried out. The stratum integration must meet the following requirements: 1. The scale of the stratum is larger than the common geological scale 5. It should be represented by a large scale symbol. 2. A good head should be selected, with continuous concave ends and simple core. If necessary, the northern section of the survey area can be selected outside the area where the sand surface conditions are good. 3. When the reservoir head is discontinuous or the structure is evenly steep, the whole structure should be determined. It is necessary to indicate when surveying and mapping: the name and title should be based on the necessary call, and there should be an analyst, worker, origin, and division map. (Ten) The survey and mapping will also be checked and selected. The markings and division maps should be divided into units. For each type of inflammation, as much as possible, a book should be described: the general description should be T-shaped and the quality should be maintained: the production case should be a collection of systematic rocks, and the origin should be identified when it is formed. 5 The structure of the land is complex or the province is old and has changed a lot. The survey and mapping should be carried out urgently. The land should be recorded in a unified way (or the interlayer (or interlayer) should be recorded in a large plate) and the rotten layer should be recorded. 5. The following are the divisions of geological mapping units for checking and mapping.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.