title>GB 12978-2003 Inspection rules for fire protection electronic products - GB 12978-2003 - Chinese standardNet - bzxz.net
Home > GB > GB 12978-2003 Inspection rules for fire protection electronic products
GB 12978-2003 Inspection rules for fire protection electronic products

Basic Information

Standard ID: GB 12978-2003

Standard Name: Inspection rules for fire protection electronic products

Chinese Name: 消防电子产品检验规则

Standard category:National Standard (GB)

state:in force

Date of Release2003-09-01

Date of Implementation:2004-02-01

standard classification number

Standard ICS number:Environmental protection, health and safety>>Fire protection>>13.220.01 Fire protection general

Standard Classification Number:Medicine, Health, Labor Protection>>Fire Protection>>C80 Fire Protection General

associated standards

alternative situation:GB 12978-1991

Publication information

publishing house:China Standards Press

ISBN:155066.1-20176

Publication date:2004-04-10

other information

Release date:1991-06-06

Review date:2004-10-14

Drafting unit:Shenyang Fire Research Institute of Ministry of Public Security

Focal point unit:National Fire Protection Standardization Technical Committee

Publishing department:General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

competent authority:Ministry of Public Security

Introduction to standards:

This standard specifies the inspection classification, sampling, model compilation, product control, technical document requirements, design change control, sample identification and acceptance methods, and the rules for type inspection, commissioned inspection, scientific and technological achievement appraisal inspection and arbitration inspection of fire protection electronic products. GB 12978-2003 Inspection Rules for Fire Protection Electronic Products GB12978-2003 Standard Download Decompression Password: www.bzxz.net

Some standard content:

CS 13.220.01
National Standard of the People's Republic of China
GB129782003
Substitute GB12978-1991
Rules for test of fire electronic products
Rules for test of fire electronic products2003-09-01Promulgated
People's Republic of China
General Administration of Quality Supervision, Inspection and Quarantine
Implementation on 2004-02-01
Nominal reference documents
Inspection classification
Compliance inspection
Vertical inspection
Supervision inspection
Science and technology achievement case inspection
Medium drum inspection
Basic provisions
Plastic number comprehensive room
Weight products
8 #8#8 Work8#:#发发修8# 8 Engine 8 US# Service# Repair# Repair# Maintenance# Sub###8
Product Technical Documents
Sample Identification and Receiving
Design Change Control
Type Inspection
Qualification Judgment and Inspection Report
Sample Processing
Special Inspection
Inspection Fin Fruit
Sample Processing
Supervision Inspection
#++t0t+m2eeeet0+te+eeu+ee+eE+et++.eQualification Judgment and Inspection Report
Sample Processing
Scientific and Technological Achievement Appraisal Inspection
Inspection Conclusion
9Special Inspection#
GE12978-2003
CB12978—2003
Inspection Conclusion||tt| |Sample Process
List A (Regulatory List)
A1 Basic Provisions
Product Unqualified Table
Methods for Determining the Results of Supervisory Inspection
Definition Methods
aatmar
S8ETEEIES0
Chapter 1, Chapter 2 and Chapter 3 of this standard are mandatory. The rest are GB12978—2003
This standard replaces GB12978—1991 "Regulations for Inspection and Correction of Fire Alarm Systems" 3. The main changes between this standard and GB12978—1991 are as follows: 1. The scope of application of the standard has been expanded; 2. The provisions for the four inspection categories of vertical support inspection, type inspection, supervisory inspection and secondary inspection have been modified; 3. Standard inspection has been added!
- Added the requirements for the type of product, product technical content and design change control:- The standard structure and input specification after the order can be in accordance with GB/T1.1-2000. This standard is a standard for the production of raw materials.
This standard is issued by the Ministry of Public Security of the People's Republic of China. This standard was drafted by the National Quality Standardization and Cosmetic Technical Safety Committee of the National Quality Standardization and Cosmetic Technical Safety Committee, and the Ministry of Public Security's Institute of Public Security. The main drafters of this standard are Song Xiwei, Bao Baodong, Le Junguan, Wu Lilong, and Lu Xianran. The previous version of the standard replaced by this standard is: 128-1991.1 Standard
Fire protection electronic product inspection regulations
GE12978-2003
This standard specifies the inspection classification, sample, model compilation, product control, technical document requirements, design change control sample identification and acceptance methods, and type inspection, product inspection, monitoring inspection, material and technical results stability inspection and clock inspection regulations for fire protection electronic products (hereinafter referred to as simplified sample products).
This standard is applicable to the inspection of fire protection electronic product quality supervision inspection institutions (hereinafter referred to as high-standard inspection institutions). 2 The clauses in the referenced documents become the clauses of this standard through reference in this standard. For all referenced documents with a date, all subsequent amendments (excluding errors) and revisions are not applicable to this standard. Therefore, all parties involved in the standard are requested to confirm whether the latest versions of these documents can be used. For all undated referenced documents, the latest versions shall apply to this standard. GB/T 14689 Technical Department Format (GB/T14689-1993, ISO5057:1980) GB/T10111 Use random number to identify the square teeth of the machine shaft sample 3 Inspection classification
3.1 Type inspection
To test the quality of the product, the machine needs to use certain technical and product methods to conduct all-item inspections on the sample. 3.2 Inspection
Inspection conducted by the manufacturer.
3.3 Supervision inspection
Inspection conducted by the quality supervision agency to determine whether the product meets the product quality standards. 3.4 Scientific and technological results identification inspection
An inspection conducted by the scientific and technological department under the supervision of the quality inspection department. 3.5 Residual inspection
An inspection conducted by the quality inspection department under the supervision of the quality inspection department for the purpose of providing a legal basis for the quality of new products. 4 Basic requirements
4.1 Hot sample
41.1 The sample method shall be carried out in accordance with GBT0111
41.2 The sample quality and sampling method of each product shall meet the requirements of the corresponding product standards or existing regulations. 41.3 Supervision inspection sampling
4.1.3.1 Samples shall be taken from the products produced after the previous supervision inspection and quantitative inspection and passed the self-inspection. 413.2 The samples shall be taken from the production plant or warehouse of the enterprise, and from the products that have been shipped out of the factory but have not yet been installed and used, and are stored in the warehouse. 4_13.3 For products produced by foreign enterprises, the samples can be taken from the products that have not yet been installed and used, and are stored in the warehouse. The sampling personnel shall fill in the sampling record completely and accurately. 129782003
4.2 Model manufacturing
The manufacturing of product models shall be carried out in accordance with the product model selection standard or the provisions of the corresponding product standards. If there is no provision, it shall be more specific. The original auxiliary model of the brand product shall be certified. 4.3 Quantity product
4.3.1 A product with a quantity number can have one main and several quantities, which are respectively the main quantity product and sub-product of the product. 4.3.2 For the main quantity product of any sub-product, the sub-product and the main quantity product shall not have the following differences: The shape of the base is different:
Sub-product The product does not have the circuit or wall of the external indicator light: the component product does not have each address code circuit:
d The sub-type product has waterproof, anti-theft and auxiliary equipment: see the lack of cavity and other equipment, please meet the requirements of the product standards:
Among them, the product does not contain the micro-total of the product production site: 4.3.3 For the control product, the component product and the main product are only allowed to have the following whole period a
The number of non-circuits is different and the resulting machine size and electric capacity are different: b The number of alarm output or control output circuits is different and the resulting machine size and power capacity are different: the layout design of the panel is different!
The software is different due to different reporting and replying: the installation method is different!
Others that do not affect the performance of the product 4.3.4
Emergency lighting standard products: The sub-products and the main product are allowed to have the following panel graphics differences:
Same power supply, slightly different appearance size: h
Except the centralized power supply, the other features are similar to the main product: d Different installation method:
Other minor changes which will not cause any difference in product performance 4.3.5 For other standard products, the sub-products and the main product should have the same basic prototype and circuit design. Only minor changes which may not affect the product performance are allowed.
4.4 Product Technical Documents
4.4.1 For main products, the inspection unit shall submit a) a technical document of the sample, that is, two copies of the product installation and use record in Chinese: b) a product design and calculation manual:
a product circuit design drawing and component list: d) a product mechanical design drawing:
a product technical standard (except for national standards or industry standards) d) a computer assembly block diagram and sequence list or construction (for products with mechanical design) 3 copies of the product front photo (125mm×88mm color photo) 4.4.2 For sub-products, the inspection company shall submit three copies of the product front photo (125mmX88mm color photo). And one copy of the corresponding documents for sub-products and full-scale products 4.4.3 The technical documents submitted by the inspection company shall meet the requirements of GB/T14689. 4.4.4. If the product has reserved contents of patent, under the condition that it cannot be inspected, the enterprise submitting the product for inspection may not submit the product with the consent of the inspection agency, and the inspection shall be marked.
4.5 Sample identification and collection
4.5.1 The product mark and quality inspection mark of the sample shall be marked on the surface of the product for easy identification. 4.5.2 After receiving the sample, the inspection agency shall check whether the sample mark is clear and complete. GE12978—2003
4.5.3 If the inspection agency finds that the sample is damaged during the sample acceptance inspection, it shall notify the enterprise and the sampling department in writing. It shall be handled according to the relevant provisions of the equipment. bzxZ.net
6 Design modification control
4.6.1 After the product is inspected, if there is any change to the original design, the design modification technical documents shall be submitted to the original inspection report issued by the inspection agency: for recognition by other countries!
Change minor structural changes:
D Replace the appearance and package of non-speed controllers; Add auxiliary functions beyond the requirements of product standards: d Rearrange the panel of control products:
Rewire the auxiliary circuit:
Add auxiliary functions that have little impact on the basic functions of the main program: D Only minor changes to product performance, 4,62 The inspection agency shall review the technical documents of the design changes, and decide whether to conduct necessary inspections according to the design changes, and issue a design change approval letter or review letter. 463 For inspection and purchase, if the scope of the change is large, or the key technical indicators are not fully inspected, if it cannot prove that the design meets the relevant product standards or technical requirements, the enterprise shall be notified to conduct all items of inspection in a timely manner: 5 Type inspection
5.1 Process
5.1.1 After receiving the inspection application form submitted by the inspection enterprise, the inspection agency shall accept the type inspection application. 5.12 The inspection enterprise shall submit technical documents and samples and accessories required for the test. 5.1.3 The sub-type product can apply for type inspection at the same time as the main product. The technical documents of the sub-type product can be submitted at the same time. The number of samples and sampling of the sub-type product shall be based on the product standards or relevant requirements. The number and sample preparation of the sub-type product samples shall be determined by the inspection agency according to the inspection date. 5.1.4 When the main product passes the type inspection, fill in the inspection application form when applying for the sub-type product inspection, and change the technical documents according to Article 44.2. 5.15 The type inspection samples shall be drawn according to the product standards or relevant regulations. 5.2 Inspection 5.2.1 The inspection agency shall directly review the technical documents submitted by the inspection enterprise. After the review is qualified, the technical document review shall be added. If the technical document review fails, the enterprise shall re-change the technical documents. 52.2 The inspection agency shall conduct all-item inspections on the samples according to the corresponding product standards. 5.23 During the inspection process, re-testing is allowed for unqualified inspection items. The following provisions shall be followed for re-testing: a) When the total number of inspection items specified in the product standard is not less than 15, or when the number of re-tests for any inspection item exceeds 2 or the number of re-tests exceeds 4 times, re-testing shall be stopped and the product shall be deemed unqualified! b) When the total number of inspection items specified in the product standard is less than 15, or when the number of re-tests for any inspection item exceeds 2 or the number of re-tests exceeds 3 times in total, re-testing shall be stopped and the product shall be deemed unqualified! If the improvement of the test is not completed within 6 months, the product shall be stopped from being marketed! d) The inspection provisions and improvement reports of the improved samples of the re-test shall comply with the provisions of 5.2.3.3. 5.23.1 The samples for supplementary tests can be the pre-samples of the samples taken, or the samples re-sampled by the sample sealing department. 5.2.3.3 The enterprises submitting the test shall make improvements to the samples for supplementary tests. If the inspection agency can confirm that the improvements are reliable for the qualified inspection items, the test shall be conducted. If it cannot confirm whether the improvements have a positive impact on the reliability of the qualified inspection items, the inspection agency shall conduct relevant verification tests. The enterprises submitting the test shall submit a report on the improvement and a copy of the corresponding technical documents to the inspection agency, which shall be stored after internal approval. 5.2.4 The inspection items of the sub-type products shall be determined by the inspection agency. 5.3 Determination of qualified products and inspection report
5.31 If the technical standards to which the products are based have other provisions and are not lower than the requirements of 5.2, the regulations shall be followed. 5.32 The product shall be determined to be qualified or unqualified when the following requirements are met: a) Technical document review and approval:
b) Production and external inspection are qualified:
) All inspection items are qualified (including qualified within a sufficient time limit) 5.33 If all inspection items of the weight product are qualified, the sub-type products are determined to be qualified, and the sub-type products are determined to be unqualified. 5.3.4 After the inspection is completed, the inspection agency shall issue an inspection report to the sending enterprise. 5.4 Sample processing
5.4.1 After the inspection is completed, the inspection agency shall keep the necessary samples for preparation and return the remaining samples to the sending enterprise. The sending enterprise shall not sell the inspected products as products
|5.4.2 If the sample exceeds the shelf life, the inspection agency shall notify the inspection enterprise to return it. 5.4.3 The inspection agency shall check and dispose of the samples that are out of date. 6.1 Processing
After receiving the entrustment letter and relevant technical documents from the client, the inspection agency shall accept the application for entrustment inspection. 6.2 Inspection
6.21 The technical conditions and items of the inspection equipment shall be determined by the client. 6.2.2 The number and arrangement of samples shall be determined by the inspection agency and the client through consultation. The samples and extraction methods shall be determined by the client. 6.2.3 The inspection agency shall inspect the samples according to the entrustment letter and relevant technical documents. 6.3 Inspection results
After the inspection is completed, the inspection agency shall issue an inspection report to the client. 6.4 Sample handling
After the client confirms the inspection results: return the samples. Supervision and inspection
After receiving the supervision and inspection order from the supervisory department, the inspection agency shall accept the supervision and inspection. 7.2 Inspection
7.2.1 The department that implements the supervision and inspection shall decide the inspection items. 7.2.2 The inspection agency shall implement the inspection according to the relevant product standards. 7.3 Qualification judgment and inspection report
7.3.1 After the inspection is completed, the inspection result shall be judged according to the provisions of the record A. 7.3.2 The inspection result shall be reported by the inspection agency to the department that supervised the inspection. 7.4 Sample handling
7.4.1 After the inspection is completed, if there is no objection to the supervision and inspection result, the sample shall be returned. 74.2 If there is any objection to the supervision and inspection station, the inspection agency shall keep the sample. B. Scientific and technological achievements inspection and certification
8.1 Registration
GB12978—2003
After receiving the inspection and certification letter from the inspection and certification unit or the inspection and certification authority, the inspection and certification body shall accept the application for scientific and technological achievements inspection and certification.
8.2 Inspection
8.2.1 Inspection agency overview Scientific and technological achievements require inspection and certification to implement scientific and technological achievements inspection and certification. 8.22 version 6.2 current order for late inspection. 8.3 Inspection details
8.3.1 The inspection agency shall issue an inspection report based on the inspection results and add a "special inspection seal" on the inspection report. 3.2 The inspection agency shall submit the inspection report to the inspection organization or the main inspection unit, and invite 3 to 5 peer experts: appoint a person in charge to make a comprehensive evaluation of the results and write an evaluation opinion. 8.3.3 The inspection report and evaluation opinion shall be submitted to the inspection organization or the main inspection unit. 8.3.4 If the completion unit has any objection to the inspection result, the inspection agency shall re-inspect the scientific and technological unit according to the requirements of the inspection organization or the main inspection unit. 9.3.3 Inspection report and evaluation opinion shall be submitted to the inspection organization or the main inspection unit. tt||9.1 Management
9.1.1 After the inspection agency receives the documents regarding the items to be inspected, the inspection agency shall sign a contract with the quality management department and the disputing parties. The inspection contract shall clearly state the inspection date, sampling method, test tube method, inspection time exceeding one month, and the relevant parties shall make a ruling. 91.3 The quality management department shall review and examine the documents. 9.1.4 The inspection agency shall conduct sampling according to the sampling method stipulated in the inspection contract. 9.2 Inspection
The inspection agency shall implement the inspection contract. 9.3 Inspection error
After the inspection, the inspection department will issue an inspection report. The original inspection report will be printed by the quality inspection department. After the inspection is completed, the party in dispute will be returned to the quality inspection department. 9.4 Sample handling
9.4.1 After the inspection, if the party in dispute and the quality dispute handling department or organization have no disagreement on the inspection results, the sample can be returned. 9.4.2 If there is any objection to the inspection result.The samples are collected by the inspection agency. GB12978-2003
A1 Basic provisions
Appendix A
【Numerical specification
Methods for determining the results of the inspection
A1.1 The unqualified products are divided into three categories: A-type unqualified, B-type unqualified and C-type unqualified. A1.2 A test or a structural and appearance test set for a sample is called a set of tests respectively: the sum of the number of sets of all sample tests is called the total number of inspection sets of the inspection. A13
If a sample has the same type of unqualified products found in a test or a structural test, it is reduced to one unqualified product.
,1 All samples of the vehicle are inspected and the unqualified ones are counted according to the unqualified categories. The sum of the unqualified numbers of each category is called the total number of unqualified ones. A2 Product Unqualified
The product unqualified table is a list of new product unqualified products and their categories. The quality standard is formulated according to product standards or product categories.
A22 Three categories of product unqualified are judged: Category A unqualified, the unit product's important quality characteristics do not meet the requirements, or the unit product's quality characteristics are extremely serious.
B English unqualified, the unit product's major quality characteristics do not meet the requirements, or the unit product's quality characteristics seriously do not meet the requirements, C Beauty unqualified: a minor quality characteristic of a single product does not meet the requirements, or a minor quality characteristic of a single product does not meet the requirements, A.3 Judgment method
Based on the results of the quality inspection, according to A3.1~A,33, use the judgment table (Table A1 or Table A2) to conduct weekly judgment A3,1-1 under the circumstances of supervision inspection: use Use the correct inspection form (Form A1: The supplementary inspection of the supervisory inspection or the designated supervisory inspection for strict inspection is used as the strict inspection seal form (Form A, force. Hui A1 normal inspection to the fixed fee
plant straight quantity piece question
1--125
self-category unqualified
C Austrian unqualified
will not be qualified to start the question
total number of inspection pieces
self-classification unqualified
Note: Select two tables above for each drug number The text is as follows: Ac: qualified judgment number:
Rei unqualified judgment number,
A3.2 According to the violation library for judgment
Total number of inspection items:
Strict inspection judgment table
Heart sea is not fragrant road
Total number of unqualified items and total number of unqualified items in each category Re
GB12978—2003
Unqualified questions
Use Table A1 or Table A2. The total number of unqualified items in the whole inspection is the corresponding number of unqualified items Re
, and the total number of unqualified items and the total number of unqualified items are compared with the corresponding number of unqualified items R. When the product is under continuous operation. The supervisory inspection is qualified, and the supervisory inspection is rejected: the number of unqualified items in category A is
, and the number of unqualified items in other categories is less than the corresponding unqualified items: the unqualified items are small.
Tip: This standard content only shows part of the intercepted content of the complete standard. If you need the complete standard, please go to the top to download the complete standard document for free.